Managing Projects
`
Managing Projects_1

Contents
INTRODUCTION...........................................................................................................................3
TASK 1............................................................................................................................................3
TASK 2............................................................................................................................................5
Project Initiation.....................................................................................................................6
CONCLUSION..............................................................................................................................14
REFERENCES..............................................................................................................................15
`
Managing Projects_2

INTRODUCTION
Project management consists of a series of components, like launching, preparing,
executing, and oversight, and finally assessing if the final success is reached or otherwise
(Shirley, 2020). The preparation stage is the utmost importance within project which is executed
properly. This helps not just to determine the aspects necessary to compete with the project and
also to develop policies or to gradually taken that will mitigate the overall organisational
performance. It is therefore important to improve standard of work by reducing waste and
optimizing the use of resources. The primary purpose of this report is really to gain insight into
the process of managing projects as well as the benefits of a particular project.
The report includes two tasks, as task 1 includes details of the project management role,
level of risk etc. Though second monitoring role is focused on a business case study, Project-
Xperts-20 is allocated for a project. The scheme refers to the redesign of a college's classrooms.
TASK 1
1. Key characteristics of any project
A project already has a vast range of functionality and will show the accompanying:
The project is assessment measures for the implementation of both the company and
individual clients.
In addition, a mission is infinite, usually requiring the start of the end.
A project is basically exceptional to this, as it helps bring through it a wide variety of
specific requirements that a project leader requires to meet across the scope of the
project.
In the meanwhile, projects will usually only be a once-out effort, something which
appears continuously on a regular basis.
1b. Importance of integration management
Integration management is vital for establishing product development even though firms can
systematically align various tasks (Fleming, 2019). There is reference much below significance
which is as described in the following point:
Effective leadership and framework of all process quality processes and functions
mostly during proposal.
`
Managing Projects_3

Undertaking a whole venture to produce a result reliably as the aim of each process is
to meet the main objective of task project implementation.
2. Scope Statement for a project and role of WBS.
This is as being one of the key elements of a project which allows users to understand
what assessment is really all about besides reading that comment. A proposal without a
statement doesn't give any form of value to researchers and authors.
WBS 'primary function in the argument is that it assists with planning the entire meaning
of a given initiative more specifically along with it directly (Pollard, 2019). The simplest that
approach to do this is to use an elevation map. It is the structure which is the key phase of the
design which coordinated the company's efforts according to the sections of the supervisors.
3. Approaches to generate a budget
The strategy of the company is considered to be a schedule, which is thus a series of financial
and non-financial statements. It includes different methods to organizing and also the numerous
corporate entity income and expenditures. The budget is a tracking and coordinating device,
beginning with the duration and concluding with the correct structure for the plan.
Top-down approach: This helps determine how much something could also cost a project.
This proportion has been further broken down into the project activities.
Bottom-up approach: This requires recognizing the tasks that are required to accomplish
within the same project. The proposal here is focused on the lowest-level contract bundles that
are then rounded up to the overall expense of the proposal.
4. Four types of project risks and outline various responses
There could be a variety of risks throughout product design which can impact actual
performance. A few other dangers are described following:
Financial risk: This is a risk that arises due to a complete lack of financial resources
to carry out various tasks.
Risk schedule: This threat arises whenever a project fails to complete within a given
time period.
Performance risk: This is a risk associated with the expected project actual result
incompetence.
Resource risk: The resource scarcity to complete a project causes it to happen.
`