1MANAGING STRATEGY RISKS AND PROJECTS Table of Contents Project Purpose................................................................................................................................2 Project Objectives............................................................................................................................2 High level project description and requirements.............................................................................2 Summary milestone schedule..........................................................................................................3 Project approval requirements.........................................................................................................4 Team members.................................................................................................................................4 Bibliography....................................................................................................................................6
2MANAGING STRATEGY RISKS AND PROJECTS Project Purpose Health is one of the key factor that helps in managing the key components of the world. The main aim of the project is to design the diagnostic center in such a way that it becomes easy to enhance the medical facilities within the rural areas of the England. It becomes every much essential to implement proper healthcare facilities so that the impacts of diseases can be reduced. With the help of diagnostic center the chances of providing better healthcare facilities will increase.The stakeholder associated with the project are identified with the report so that it becomes easy to understand the project quality services. This ensures that better way of health services is provided towards the people of the England. Project Objectives The key objectives associated with developing a diagnostic center is that it will offer enhanced services towards the customers with the help of advanced technology. Beside this this the chances of risk will also reduce that will protect the people from getting effected by disease. The project will also develop awareness among the rural population so that they can be aware about the diseases. One of the key objective that will be offered with the development of diagnostic center is that it will offer a better platform for connecting the people with healthcare services. The objective is to enhance the healthcare services and this will also ensure a better way of managing the health condition. The project objective will be fulfilled with the help of proper awareness and diagnostic equipment. High level project description and requirements Requirements are essential as this helps in carrying out a project successfully. The project aims at providing better diagnostic center towards the rural people of the England. Health is
3MANAGING STRATEGY RISKS AND PROJECTS considered as one of the major component that is needed to be maintained properly so that it can ensure a better way of organizing the experience. Based on the survey it has been identified that around 17% of the total population lives in the rural areas of England. They are facing serious issues with the health care facilities. Thus there is a huge need to develop the infrastructure so that proper medical facilities. Health is considered as the basic right and thus the medical facilities needs to be offered effectively towards the population.The Diagnostic center will be developed with the budget of around $ 40,000 and the location is decided to be in the center of the town. This will make the center easily accessible from different parts of England. Beside this proper labor and equipment needs to be implemented within the diagnostic center. The process needs to be organized properly so that it does not hampers the performance.Based on the demand of center the branch will be enhanced. Summary milestone schedule The project milestone schedule is referred to the steps that will be completed after every phases. Milestone 1: Approval of project charter Milestone 2: completion of project planning stage Milestone 3: Completion of project execution phase Milestone 4: Final project handover
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4MANAGING STRATEGY RISKS AND PROJECTS Project approval requirements Before approving the project it becomes essential to ensure that proper requirements are fulfilled successfully. The key requirements that are needed to be checked while approving the project are listed below: ï‚·The developed project is able to meet the needs of the customer ï‚·Diagnostic center has the potential to offer better health care service ï‚·Advanced technologies are integrated within the center for providing better services ï‚·The health care risks are reduced with a secured environment ï‚·The project is accessible with the help of proper platforms ï‚·Proper staffing is being offered towards the center ï‚·Medical and other stakeholders are organized successfully ï‚·The diagnostic center will offer the quality medical center ï‚·The center is using proper awareness programs for the purpose of ensuing a better way of managing the patients. Team members The key team members that are associated with carrying out the project successfully are project manager and the stakeholders associated with medical services. The stakeholder that are essential for setting up the diagnostic center are medical care, medical professionals, nurses, doctors and government. Beside this the other stakeholders that are linked with the development of this project are pharmaceutical and insurance companies that has the potential to support the performance. Thus with the help of proper stakeholder it becomes easy to organize the key components. It is essential to identify the key stakeholders successfully so that it becomes easy to
5MANAGING STRATEGY RISKS AND PROJECTS manage the health care services that are provided towards the staff. However the center will be designed in such a way that in case the demand of the service increases than the center will become private. The team member needs to be engaged property so that it becomes easy to develop the project.
6MANAGING STRATEGY RISKS AND PROJECTS Bibliography Ahmad, M. F., Soo Nee, P., Muhd Nor, N. H., Shiaw Wei, C., Hassan, M. F., & Abdul Hamid, N. A. (2017). Total Quality Management Practices in Malaysia Healthcare Industry: A Survey Result.International Journal of Supply Chain Management,6(3), 332-336. Erdmier, C., Hatcher, J., & Lee, M. (2016). Wearable device implications in the healthcare industry.Journal of medical engineering & technology,40(4), 141-148. Laurenza,E.,Quintano,M.,Schiavone,F.,&Vrontis,D.(2018).Theeffectofdigital technologies adoption in healthcare industry: a case based analysis.Business Process Management Journal,24(5), 1124-1144. Manogaran, G., Thota, C., Lopez, D., & Sundarasekar, R. (2017). Big data security intelligence for healthcare industry 4.0. InCybersecurity for Industry 4.0(pp. 103-126). Springer, Cham. Mejia, J., Mejia, A., & Pestilli, F. (2019). Open data on industry payments to healthcare providers reveal potential hidden costs to the public.Nature communications,10(1), 1-8. Sandberg, D. S. (2017). Medical tourism: An emerging global healthcare industry.International Journal of Healthcare Management,10(4), 281-288.