This project focuses on designing an efficient continuous belt conveyor system. Students must select design parameters like speed, capacity, belt tension, and power requirements while considering factors like material type and production throughput. The project involves calculating drive power, selecting belt dimensions and type, determining pulley diameters, and analyzing the influence of idler roll spacing. Alternative conveying options are also explored.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
PROJECT SOLUTIONS TO THE QUESTIONS
INTRODUCTION
Material handling and transportation equipment play a critical role within the production floor. It
facilitates transfer of semi-finished parts within the production system. Now, there are a number
of methods that are being used for this purpose. One of them is the conveyors; which is further
split into various types like: chain conveyor, rail conveyor, and belt conveyor among others. In
this case, a project problem is presented in which the design team is required to come up with an
efficient design of continuous belt conveyor system as shown in figure 1. The conveyor profiles
illustrated must be achieved in the process. Critical design parameters as provided include: speed
of conveyor, the capacity in tonnes per hr, the tension in the belts at every section along the belt
profile, the power requirements hence selection of appropriate motor for this purpose. The aim is
to design a system that will be in tandem with the requirements that include: An efficient system
where belt wear and tear is minimized while performance maximized; achieve a sufficient
payload per day to match with the production throughput on a weekly basis and also design a
system that is safety-conscious such should it fail unexpectedly then it would happen in a fail-
safe manner.
Question 1
(i) Design Parameters Selection
Selection of design parameters will have to consider the following factors:
The nature and amount of material that us being conveyed; heavier materials
may require slightly lower speeds otherwise wear and tear would be too
frequent
Hence the payload is a critical design factor and must be optimized to ensure
efficient performance with return on investment
(ii) Calculation of required drive power and installed power
In calculating the drive power, check figure 1 where in this case we obtained a drive
power of 22.36kW and motor with a rating of 26kW will be selected.
INTRODUCTION
Material handling and transportation equipment play a critical role within the production floor. It
facilitates transfer of semi-finished parts within the production system. Now, there are a number
of methods that are being used for this purpose. One of them is the conveyors; which is further
split into various types like: chain conveyor, rail conveyor, and belt conveyor among others. In
this case, a project problem is presented in which the design team is required to come up with an
efficient design of continuous belt conveyor system as shown in figure 1. The conveyor profiles
illustrated must be achieved in the process. Critical design parameters as provided include: speed
of conveyor, the capacity in tonnes per hr, the tension in the belts at every section along the belt
profile, the power requirements hence selection of appropriate motor for this purpose. The aim is
to design a system that will be in tandem with the requirements that include: An efficient system
where belt wear and tear is minimized while performance maximized; achieve a sufficient
payload per day to match with the production throughput on a weekly basis and also design a
system that is safety-conscious such should it fail unexpectedly then it would happen in a fail-
safe manner.
Question 1
(i) Design Parameters Selection
Selection of design parameters will have to consider the following factors:
The nature and amount of material that us being conveyed; heavier materials
may require slightly lower speeds otherwise wear and tear would be too
frequent
Hence the payload is a critical design factor and must be optimized to ensure
efficient performance with return on investment
(ii) Calculation of required drive power and installed power
In calculating the drive power, check figure 1 where in this case we obtained a drive
power of 22.36kW and motor with a rating of 26kW will be selected.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
(iii) Selection of belt width, type and class
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
(iv) Belt tension profiles for the following loading conditions:
- Empty
- Fully loaded
- Incline and horizontal only loaded
- Decline/s only loaded
Loading
conditions
Profiles
1
Profile 2 Profile 3 Profile
4
Empty Slightl
y
relaxed
; less
tension
Fully loaded Slight
sagging;
greater
tension
Incline and
horizontal only
loaded
Greater
tension
horizontall
y
Decline/s only
loaded
Slight
tension
increas
e
(v) Selection of take-up method and location
This should be located at the beginning of material loading
- Fully loaded
- Incline and horizontal only loaded
- Decline/s only loaded
Loading
conditions
Profiles
1
Profile 2 Profile 3 Profile
4
Empty Slightl
y
relaxed
; less
tension
Fully loaded Slight
sagging;
greater
tension
Incline and
horizontal only
loaded
Greater
tension
horizontall
y
Decline/s only
loaded
Slight
tension
increas
e
(v) Selection of take-up method and location
This should be located at the beginning of material loading
(vi) Calculation of the minimum radii for the vertical curves
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
(vii) Determination of drive, tail and snub pulley diameters
(viii) Head and tail transition configurations and lengths
Question 2
Influence of increased idler roll spacing on both carry and return side.
Advantages
Leads to increased tension of belts hence efficient delivery of material
Disadvantages
Increased tensioning of belts lead to frequent wear and tear hence lowering lifespan of belts
Question 3
Alternative continuous conveying options
The bucket conveyor can be used especially for vertical lifting of material
CONCLUSION
The belt conveying system design will have to be tested and corrective action made as early as
possible. Expectedly, all the requirements are supposed to be met however it unlikely that they
will be achieved at a go. Therefore, there is need to make continuous improvements as the
operation ensues.
(viii) Head and tail transition configurations and lengths
Question 2
Influence of increased idler roll spacing on both carry and return side.
Advantages
Leads to increased tension of belts hence efficient delivery of material
Disadvantages
Increased tensioning of belts lead to frequent wear and tear hence lowering lifespan of belts
Question 3
Alternative continuous conveying options
The bucket conveyor can be used especially for vertical lifting of material
CONCLUSION
The belt conveying system design will have to be tested and corrective action made as early as
possible. Expectedly, all the requirements are supposed to be met however it unlikely that they
will be achieved at a go. Therefore, there is need to make continuous improvements as the
operation ensues.
1 out of 8
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.