Materials Market1 EARLY STAGE BUILDING CONSTRUCTION ESTIMATE A Research Paper on Material Market By Student’s Name Name of the Professor Institutional Affiliation City/State Year/Month/Day
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Materials Market2 INTRODUCTION This report involves the assessment on how the material market affects the accuracy of the early stage building cost estimation by bringing the examples of the from both the research findings as well as in industrial cases. The factors under the material market which affects the accuracy of the early stage of building cost estimation include the material availability, material quality, and material prices. Material Prices The prices of the materials are one of the most varying factors affecting the present market. When the materials to be used in construction are purchased when the market prices are very high, there will be an increase in the cost estimation of the early stages of construction(Arthur, 2012). The prices of materials are always fluctuating according to numerous factors such as the cost of their manufacture or other external factorssuch as political stability. In the case of the Mara Large Project the table below shows how the fluctuations in the cost of materials are dominating the management of the project: Table 1: Rank of the Materials prices fluctuations(Holm, 2012)
Materials Market3 Construction materials such as electrical fittings, plumbing, bricks, gravel, timber, steel, and concrete play a significant role in the accuracy of building cost estimation. The cost of purchasing these materials is affected by the capability of the manufacturers to manufacture them. In case the materials are purchased from the manufacturers at the moment when the order for the materials is at their peak, then the cost of these materials would be higher compared to the moment when the orders are fewer(Moselle, 2016). Material Availability When raw materials such as stone or timber can be found easily in the region surrounding, the estimation cost will drastically reduce, however, when the raw materials are in short supply, their estimation cost will be higher. Therefore, it is normally advisable to select regions where there are plenty raw materials so as to save on the cost of transportation and also reduce the time wastage during the transportation of these raw materials from where there are manufactured or where they are existing, to the area in which the construction process will be taking place. The raw materials sustainability also contributes to the accuracy of the early stage construction estimation(Ogershok, 2012). The sustainable materials are normally available and can also be recycled hence the estimation cost will be greatly reduced since such raw materials do not necessarily need to be construction new. Sustainable materials that have been used at one time can be used again in the construction of a new structure especially when these materials are recyclable or reusable. For instance, a teak tree is very difficult to type of tree to grow since the tree requires particular climate conditions making the estimated cost of material to be high. Due to the low availability of the teak tree, the estimated cost of this material when it is expected to be used during the construction process will
Materials Market4 be high(Popescu, 2012).The figure below shows the ranking of the delay in materials procurement for the case of Mara Large Project: Table 2: Rank of the delay in material procurement(Pratt, 2011) It is normally advisable to select raw materials that are not expensive and are also common depending on the type of project under consideration. It is also effective if the suppliers were nearer the site for the project construction so as to further minimize the cost of transportation and also increase the accuracy of the early stage building cost estimation for the particular project. When placing the orders for numerous materials to be used in a particular project, the quality also affects the cost estimation. In case a majority of the materials are purchased from a single supplier or vendor or manufacturer, then it would be easier to negotiate on the overall cost of the materials which would be much cheaper compared to when the materials are purchased from numerous manufacturers, suppliers or vendors(Singh, 2011). For example, purchasing screws from a store, bricks from brick-makers, and lumber from a yard would be more costly compared to purchasing all their materials from a single supplier. Purchasing materials in bulk also reduce uninsured theft, thievery, and loss of materials as a result of wastage. Adequate and regular supply of materials is the very significant task since the wringing type of materials or irregular delivery or late delivery during construction of the project
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Materials Market5 will affect the utilization of resources and also influence the accuracy of the early stage building cost estimation(Holm, 2012). Material Quality During the cost estimation, the material quality should be seriously considered since a higher quality of material will result in an additional cost hence increasing the cost estimation of the project. Materials of low quality will result in a higher cost of construction than anticipated due to the loss of materials during construction. This will lead to the lack of standards for management systems and materials. Therefore, it is profitable to purchase materials of higher quality which attains the minimum standard requirements to use for any project. In case lower quality materials are used in any project, the repair cost would be more compared to purchasing materials of higher quality which will ultimately increase the estimated cost of the materials (Holm, 2012). Higher quality materials perform there required the function for an appropriate duration without any fault repairs of failure of the project. This means that the faulty materials would be decreased drastically leading to lower initial estimated cost of the project(Arthur, 2012). Elemental vs Trade Cost Breakdown Comparison The selected building element for the comparison is the concrete whose trade items of a Bills of Quantities are discussed below: Concrete works 1.Reinforced concrete: Bricklayer and plasterer All the reinforced concrete elements determined by volume (m3) except hollow block slabs measure in area (m2) Shells, cylindrical roofs, and domes determined by area in horizontal projection.
Materials Market6 2.Plain concrete: Average thickness should be stated when determined is done by area Determined in m3(volume) if thickness ≥ 20 cm Determined in m2(area) if thickness < 20 cm 3.Plastering of the concrete: Conclusion This report involves the assessment on how the material market affects the accuracy of the early stage building cost estimation by bringing the examples of the from both the research findings as well as in industrial cases. When raw materials such as stone or timber are easily available in the region surrounding, the estimation cost will drastically reduce, however, when the raw materials are in short supply, their estimation cost will be higher. The cost of purchasing materials is affected by the capability of the manufacturers to manufacture them. Materials of low quality will result in a higher cost of construction than anticipated due to the loss of materials during construction. This will lead to the lack of standards for management systems and materials.
Materials Market7 Bibliography Arthur, W., 2012.Estimating Building Costs.Melbourne: John Wiley & Sons. Holm, L., 2012.Construction Cost Estimating: Process and Practices.Perth: Pearson/Prentice Hall. Moselle, B., 2016.2017 National Building Cost Manual.Sydney: Craftsman Book Company. Ogershok, D., 2012.National Building Cost Manual.Perth: Craftsman Book Company. Popescu, C., 2012.Estimating Building Costs.Gold Coast: CRC Press. Pratt, D., 2011.Estimating for Residential Construction.Toledo: Cengage Learning. Pratt, D., 2018.Fundamentals of Construction Estimating.Melbourne: Cengage Learning. Singh, S., 2011.Cost Estimation of Structures in Commercial Buildings.Perth: Macmillan International Higher Education.