Student NameIDAssignment Title
Measurable Organisational Value Goal_1
Part One1.1 MOV - Measurable Organisational ValueGoal1.Generate more revenue, by end of the show in November2.More donations can be made to ICV, by end of the show in November3.Volume of overcrowding can be reduced at main gate for the want of ticket booking, during the show in November4.Social issues can be reduced by having controlled flow of mass, during the show in November5.Simple computerized self-ticket booking system will provide satisfaction to customers, during the show in NovemberArea of ImpactRank (1 to 5)Operational: This new online ticket booking structure will diminish the working weight on the ticket counter and security entryway as by far most of the all-inclusive community will book their tickets on the web1Customer: Due to the introduction of the new online ticket booking structure, the customers will never again need to stay outside the in the ticket counter. This will make them perky2Strategy: This electronic ticketing system will help RALS to in increasing more trade and help them out giving more money to ICV3Finance: This web ticketing system will empower RALS as now a more prominent number of tickets to will be sold than past and they will acquire more money4Social: For showing their social points of interest now after the introduction of this online ticket booking system they will have the ability to give more salary to ICV5ValuesFasterThis electronic ticketing structure will help their customers in booking their ticket online so the pile on the ticket counter on a chief day will be less and the volunteers on the counter will have the ability to do their work fasterDo moreThis positive result will encourage RALS to develop the show logically and make more endowments to ICV
Measurable Organisational Value Goal_2
Part TwoScope of the ProjectoProper accomplice recognizing evidence and examinationoRequirements to be amassed from the perceived accomplicesoRequirements conclusion and underwritingoDesign and Develop the required systemoTest and Implement the systemoGeneration of execution finishing reportoCollect and record lessons learnedoConduct meeting for get-together commitments from accomplices with respect to the yieldoDo the appraisal of the endeavoroProvide support to see the operational bugs and resolve them for 1 month timeScope Management PlanRequirement: The efficient easy to understand framework which ought to enable the clients to give the first run through the sign in Id and watchword to access and book online tickets for the RALS appear. In-Scope: to design, plan, create and actualize an online framework for the ticket reserving for the guests and providing the required equipment and programming for building up the framework. Additionally to give three help administrations to the three-month guarantee time of the framework after the execution.Out-of-Scope: giving preparing to staff after the guarantee time frame, giving specialized help whereverthe individual is required to be positioned. Deliverable: Simple and secure online framework to empower clients to book the tickets ahead of time and abstain from remaining in the group to book ticket from the counter.Success criteria: convey the framework before the beginning of the show, all the quality parameters arekept up in the item and conveyance of item inside the planned consumption.Resource Plan (from MS-Project)Project People (and their roles)oProject Head: to take the charge of the project and responsibility for its success or failure
Measurable Organisational Value Goal_3
oProgrammer: to design and develop the programme for the systemoDatabase Developer: to design and develop the database of the system oTest Engineer: to test the system at every required stageoTechnology: all required hardware, Software and network system to design and develop the systemoFacilities: Office set-up for the team + Video conferencing facility + Canteen facilityoOther: dedicated vehicle for external coordination workPart ThreeoWBS
Measurable Organisational Value Goal_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Measurable Organisational Value Goal: Assignment
|15
|1576
|79

ICT Project Management | Project
|17
|1662
|84

ITC505 Assignment on ITC Project Management
|13
|2050
|74

RALS Project Description: ICT Project Management
|14
|2168
|287

Assignment on Online Ticket Booking System
|17
|2606
|118

Assessment ICT Project Management
|16
|2444
|104