logo

Configure, Verify & Troubleshoot WAN Links & IP Services in Medium Enterprise - Case Study Lab

   

Added on  2023-04-26

120 Pages26049 Words437 Views
Course No/s: ICT50415_R2
Training Package: ICT01 v02 National Code: ICT50415_R2
Unit Number/Name
ICTNWK506 Configure, verify & troubleshoot WAN links & IP Services in
a
Medium enterprise
Assessment Tool Code: L
Method:
Assessment Name: Assessment 1 Case Study Lab Assessment Event: 1 of 1
Date Given: Week 1 Date Due: Week 10 Weighting: 100%
(This assessment covers elements):
Instructions: Outcome: See Feedback Sheet for details of
assessment
Task: Results:
Duration:
Resources: =
Conditions: Student Name
Student No:
Outcome:
Assessor Name:
Assessor Signature:
Resources / equipment to be supplied by assessor
PCs, Packet Tracer software, Routers, Swiches, laptops.PCs, LAN cabling, serial cabling
Unit Assessment Item 1 - ICTNWK506 Version 1 Last Updated: 17/01/2018 Page 1 of 121
Owner: ICT
Disclaimer: Printed copies of this document are regarded as uncontrolled
A major network design & lab implementation
This assessment event counts 100% towards the final marks for this subject.
For assessment reporing the Result will be either AC (competency
achieved) ot NC (Not Yet Achieved Competency)
PCs, Packet Tracer or other sumulation software, Routers,
Swiches, laptops.PCs, LAN cabling, serial cabling
Networking 4 Practical Demonstration Lab
Cumulative lab demonstration case work
ICTNWK507 : 1.1 – 1.7, 2.1 – 2.7, 3.1 – 3.7, 4.1 – 4.3, 5.1 – 5.3
*Plagiarism Declaration
I have read the Student Service Guide under Student Responsibilities
to “... not engage in plagiarism, collusion of cheating in any
assessment event or examination”.
I declare that, to the best of my knowledge and belief, this assignment is
my own work, all sources have been properly acknowledged and the
assignment contains no plagiarism.
*Student’s Signature
anup
george
AC or NC
His969
Anup silwal
O Other (Please Specify)N Training Record BookM Project
L Practical DemonstrationK Case StudyJ Self AssessmentI Portfolio
H Work BasedG ObservationF SimulationE Oral Questionning
D ExamC Role PlayB Written TaskA Assessment
Configure, Verify & Troubleshoot WAN Links & IP Services in Medium Enterprise - Case Study Lab_1
Course No/s: ICT50415_R2
Training Package: ICT01 v02 National Code: ICT50415_R2
Unit Assessment Item 1 - ICTNWK506 Version 1 Last Updated: 17/01/2018 Page 2 of 121
Owner: ICT
Disclaimer: Printed copies of this document are regarded as uncontrolled
Configure, Verify & Troubleshoot WAN Links & IP Services in Medium Enterprise - Case Study Lab_2
Course No/s: ICT50415_R2
Training Package: ICT01 v02 National Code: ICT50415_R2
Feedback Sheet
Unit Number/Name:
ICTNWK506 Install Configure, verify & troubleshoot WAN links & IP
Services
in a Medium enterprise
Assessment Event: 1 of 1
Results/comments:
Student Name:
Student No:
Marking Guide :
Successful completion of all tasks in the Lab Case Study Desmonstrations.
Documentation of the successful operation all network connectivity in the Lab
Demonstration.
Documentation evidencing the successful implementation, testing and operation of the
Lab Demonstration.
Marking Guide is integrated within the assessment Lab documentation
Assessor Name:
Assessor Signature:
Student Comment:
Student Signature:
Date:
Unit Assessment Item 1 - ICTNWK506 Version 1 Last Updated: 17/01/2018 Page 3 of 121
Owner: ICT
Disclaimer: Printed copies of this document are regarded as uncontrolled
Configure, Verify & Troubleshoot WAN Links & IP Services in Medium Enterprise - Case Study Lab_3
Course No/s: ICT50415_R2
Training Package: ICT01 v02 National Code: ICT50415_R2
Diploma in IT Networking (ICT50415)
Networking 4 Project Area
ICTNWK506 Configure, verify & troubleshoot WAN links & IP Services in a
Medium enterprise
Major Lab Scenarios
0. PREPARATION
1. PPP & CHAP
2. FRAME RELAY
3. ACLs 1
4. ACLs 2
5. NAT & PAT
6. DHCP
7. VPN (GRE)
8. IPv6
9. ADSL
The following scenarios are lab exercises and lab activities that will allow the student
to demonstrate the ability to configure and test WAN links.
Networking 4 ICTNWK506 Assessment v01 Page 1
Configure, Verify & Troubleshoot WAN Links & IP Services in Medium Enterprise - Case Study Lab_4
Course No/s: ICT50415_R2
Training Package: ICT01 v02 National Code: ICT50415_R2
Networking 4
Laboratory 0 v1
Prepare to install medium enterprise WAN Links
Aim
To prepare the installation of meduium enterprise WAN links.
Method:
For this activity you are to complete the following written tasks for the situation of installing
medium enterprise WAN links.
1.1 Describe how you would prepare for Wan configuration work according to legislation, work
health and safety (WHS) codes, regulations and standards.
Ans: WAN configuration work according to legislation, work of health and safety(WHS)
codes, regulations and standards leads to the moto of safe work where it enflunece the
development of national policies to improve work health and safety. For confugiring the
WAN, wheather its assembling router or its assembling the topologies, each work
should be configured according to legislation. All three doesnot regulate or enforce WHS
regulation. Beside for the security purpose, If your Wan configuration doesnot meet the
requirements, might face penalty if it doesnot meet.According to WHS(work health and
safety), give a general overview and how to make the workplace safe and healthy.
They outline the legal responsibilities and duities as the employee to configure WAN or
the business owner. The regulations also set out the standards that you need to meet
for the specific hazards, and risk, such as noise, machinery and manual handling and
also set licence for specific activities inorder to be safe.
Networking 4 ICTNWK506 Assessment v01 Page 2
Configure, Verify & Troubleshoot WAN Links & IP Services in Medium Enterprise - Case Study Lab_5
Course No/s: ICT50415_R2
Training Package: ICT01 v02 National Code: ICT50415_R2
(Instructor Initial ________ Date___________)
1.2 Describe in detail how you would arrange access to a work site according to required
procedures.
Ans: Due to management support, it is crucial by the managmnet support for the
implementation of modification of a policy related to the employee behaviour. Likewise
consulting with the staff developing and implementing workplace to policy to promote
stronger awareness. Providing the training through the policy and training session,they
should be reiterated and discussed with staff regularly at staff meeting, securing the policies
and the plans while arranging the WAN towards the work site. Set the aim of the policy,
explaining the topology about how the WAN are setup and provide the date when the policy
were developed. And at last all the routers and hub, switch are arranged well but need to be
implemented and the policies are applied conisistently through the organization, and there
should be the warning message, disciplinary action or dismissal.
(Instructor Initial ________ Date___________)
1.3 Explain how you would review existing network design documentation to ensure it is current
and complete
ANS: network documentation of the connection of WAN is to ensure that the network
document can provide service providers with valuable insight when it’s the time to
trobuleshoot the problems.since the first and very step is to cerate the network
documentation policy where it should detail what aspect of netwrk need to be documented.
Likewise create a network topology diagramwhere mapping the network topology is to
include each segment and routers connecting various segment. Document server names,
roles and IP address are included in a network topology diagram and including the certain
diagram for each and necessary servers and creating the change log for each server, and
document tge application and their versions running on each server where it leads to
document software and proof of lisence.
Networking 4 ICTNWK506 Assessment v01 Page 3
Configure, Verify & Troubleshoot WAN Links & IP Services in Medium Enterprise - Case Study Lab_6
Course No/s: ICT50415_R2
Training Package: ICT01 v02 National Code: ICT50415_R2
(Instructor Initial ________ Date___________)
1.4 Describe the network elements required to install WAN services to meet technical
requirements.
ANS: designing the network and installing wAN services to meet technical requirement could be
difficult one but the first step is to understand your network requirement. Network devices must
reflects the goals, characterstics and polices of the organizations in which they operate. There
are two primary goals while driving the network design and implementation. Since in application
aviablity, network carry application information between computers. If the application are not
available to network users, the network is malfunctioning and is not doing its job.Likewise
Information system budget today often run in the millions of dollar. As large organization
increasingly rely on various electronic data for managing business activities, the associated
cost of computing would rise.And if any design problem occurs regarding the problem of
aviablity and cost, it fails to meet the technical requirement.
(Instructor Initial ________ Date___________)
1.5 Describe how you would co vendors and service suppliers to obtain specifications and
availability of identified WAN connection components
ANS: In order to obtain the specification and aviablity of identified WAN connection, there are
some of few steps for selecting the right supplier. While Identifying a supplier, it is important to
identify a few suppliers in order to access their capabilities and compare pricing.During the
selection of WAN connection component, should look at the total cost ownership, delivery
commitments. Likewsie the important step is to develop and audit and assestment program.We
can also gain and utilize with suppliers , which can be used to identify performance gaps, as well
Networking 4 ICTNWK506 Assessment v01 Page 4
Configure, Verify & Troubleshoot WAN Links & IP Services in Medium Enterprise - Case Study Lab_7
Course No/s: ICT50415_R2
Training Package: ICT01 v02 National Code: ICT50415_R2
as monitoring the direct value to the business of WAN connection.Acheiving certification here
the supplier relation grows stronger and both parties can feel as they are receiving positive
performance.Ultimately, the manufacturer/supplier relationship is formed, allowing full
knowledge of source and material and ensuring the high quality.
(Instructor Initial ________ Date___________)
1.6 Describe how you would develop plans, with prioritised tasks and contingency
arrangements, for installation of components with minimum disruption to client
ANS: Preparing for given work according to legislation, OHS codes, regulations and
standards, where the site are arranged according to required procedures, Reviewing existing
network design documentation to ensure it is current and complete the installation of WAN.
Selecing well as the network elements required to be installed to meet the technical
requirements, Configure and verify a basic serial WAN configuration, Configure and verify at
least two WAN protocols and Describe virtual private network (VPN) technology well as
Configure and verify a site to site VPN. Likewise configuration are made and changes during the
installation of components.
(Instructor Initial ________ Date___________)
1.7 Describe how you wouls liaise with appropriate persons to obtain approval for the WAN
installation plans, including security clearance and timing
ANS: When designing and implementing wide area networks (WANs) that integrate voice,
video, asynchronous and synchronous data and LAN traffic, all aspects of the organization's
goals must be factored into the WAN design. Specific attention must also be paid to line
charges, network throughput, security, and the inclusion of application and emerging
technologies.
When designing a WAN, numerous factors must be considered. The first issue to consider is the
Networking 4 ICTNWK506 Assessment v01 Page 5
Configure, Verify & Troubleshoot WAN Links & IP Services in Medium Enterprise - Case Study Lab_8

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Install, operate & troubleshoot medium enterprise switches
|23
|2289
|165

ICTTEN422 Configure and Troubleshoot Advanced Network Switching
|15
|3292
|265

BHI & CAE Assessment Cover Sheet
|14
|2351
|63

Cloud Technology for Organizational Operations
|14
|2628
|305

Implementation server virtualisation for a sustainable ICT system ||Qualification|ICT50418 Diploma of Information Technology Networking||Assessment Type |Term / Duration||2 weeks | |Location / |2nd/20
|20
|3178
|16