EXECUTIVE SUMMARY
Modular Building Systems Company (MBS) is an Australian owned Company based in New
South Wales and focuses in the installation and manufacture of prefabricated modular structures
that are affordable. The project that was constructed by the Modular Building Systems Company
(MBS) is the four star, 75 room, and three-storey Rules Club Wagga Hotel project. The modular
construction process of Rules Club Wagga Hotel project by the MBS involved four stages,
namely, design development and approval of plans by regulating authorities, assembly of module
components in the MBS, shipment of the modules to the construction site, and lastly modular
unit erection to form the hotel. The two major innovations by the MBS considered in this
research are the diagonal braces and the double module wall system.

Modern Construction Project 3
Table of Contents
EXECUTIVE SUMMARY.................................................................................................................................2
1.0 INTRODUCTION.....................................................................................................................................3
1.1 Characteristics...................................................................................................................................4
1.2 Project Description............................................................................................................................4
1.3 Modular Construction Process...........................................................................................................6
2.0 THE PROBLEMS......................................................................................................................................7
2.1 Financial Considerations....................................................................................................................7
2.2 Schedule Considerations....................................................................................................................7
2.3 Structural considerations...................................................................................................................7
2.4 Design Consideration.........................................................................................................................8
3.0 INNOVATIONS........................................................................................................................................8
3.1 Diagonal Braces.................................................................................................................................8
3.2 Double modular Walls.......................................................................................................................9
4.0 OUTCOME............................................................................................................................................10
5.0 POSSIBLE IMPROVEMENT ON INNOVATIONS......................................................................................11
6.0 CONCLUSION.......................................................................................................................................12
7.0 ACKNOWLEDGEMENT.........................................................................................................................12
8.0 BIBLIOGRAPHY.....................................................................................................................................13

Modern Construction Project 4
1.0 INTRODUCTION
This paper is about case study of Rules Club Wagga Hotel project that was installed,
manufactured, designed, and consulted by the Modular Building System. The major focus of this
case study is on the characteristics of the Modular Building Systems Company, description of the
Rules Club Wagga Hotel projects, problems encountered, innovations, specific benefits, and
possible improvements on the innovations. The modern construction process used by the
Modular Building Systems Company in the construction of Rules Club Wagga Hotel project was
the modular construction process since this method has the potential to shorten project
efficiency, eco-friendly, and safe. Industrialized buildings, a system building, modularization,
pre-assembly, and prefabrication are the terms which are used in the individually and correlation
for describing the advanced technologies in rapid construction of building projects when
structural components are manufactured at the Modular Building Systems Company and the site
of construction is used for assembly (Anon., 2019).
1.1 Characteristics
Modular Building Systems Company (MBS) is an Australian owned Company based in New
South Wales focusing in the installation and manufacture of prefabricated modular structures that
are affordable. The assembled modular buildings provide a low cost and flexible alternative to
the form of building hence preventing unnecessary expenses and delays since the process of
manufacturing is quicker significantly compared to traditional methods. Prefabricated modular or
demountable buildings are normally customized to the specifications of the client with the house
estimating and design teams (Ganiron & Almarwae, 2014).
Modular Building Systems Company is involved in the servicing, manufacturing, engineering,
and designing modular structures for light commercial markets, single-family, education,
hospitality, adult living, and multi-family structures. This modular manufacturing company has a

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Modular Construction: Sustainable Delivery System for High-Rise Buildings
|19
|5588
|72

Risk management based on the intelligent Prefabricated Building Literature Review 2022
|12
|4516
|12

Holiday Inn Express Project: Prefabrication Construction and Innovations
|15
|3096
|74

Timber Building Systems - Innovative Construction Solution
|14
|2584
|55

Structural Fabrication Techniques
|7
|1465
|22

House No. 9 by MOS Architects: A Unique Example of Modular Design
|8
|2156
|285