Hydroelectric Dam Project Report

Verified

Added on  2020/04/13

|36
|7937
|142
AI Summary
This assignment focuses on a project regarding a hydroelectric dam system in Laos. Students are required to document their project progress through a log table, incident diary, and reports. Key aspects include communication strategies, learning outcomes achieved, and the identification of positive and negative impacts of the dam project.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Module Name:
Module ID:
Programme of Study: HR and business Management
Student Name:
Student ID:

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Contents
Learning Contract.......................................................................................................................2
Section 1: Student detail.............................................................................................................2
Section 2: Focus.........................................................................................................................2
Section 3 Justification:...............................................................................................................3
Section 4: Methods.....................................................................................................................4
Section 5: Time Table:...............................................................................................................5
Section 6: Evidences of accomplishment...................................................................................5
References:.................................................................................................................................6
Appendix A:...............................................................................................................................7
Appendix B: Gantt chart..........................................................................................................23
Section B: Report.....................................................................................................................24
Introduction:.........................................................................................................................24
Reflection.............................................................................................................................24
Conclusion:...........................................................................................................................28
References:...............................................................................................................................28
Appendix A: Stakeholder Grid:...............................................................................................30
Appendix B: Simulation of Hydroelectric Dam Laos:.............................................................32
Appendix 3: Skill Grid:............................................................................................................32
Appendix 4: Project Log..........................................................................................................33
Appendix 5: Incident Log Sheet..............................................................................................34
Document Page
Learning Contract
Section 1: Student detail
Name
Tutor
Project/Placement
Section 2: Focus
Aim and Problem Statement
The aim of this learning contract is to identify the learning areas which are based on work
based learning procedures. “It is to focus on the understanding with my tutor for the
betterment of the future in the raising competitive world” (Meyer, 2008). The specific areas
which are covered in the learning contract are the knowledge related to
Team work management system
Demonstration of effective planning system
Analysis of the data collected
Monitoring of the feedback.
In this paper we are going to enlighten the importance of critical thinking skills in the
personality development of the student with regards to the wok based learning.
Learning outcome:
With the study of project undertaken, I am able to understand:
Lo1: The development of the reflective judgment based on the critical thinking skills in terms
of Log book, diaries, and tutor feedback
Lo2: It helps in analysing the problems and issues associated with work based learning.
Lo3: New Opportunities helps in the exploration of the questions related to the self-judging
methodologies.
Lo4: What are the underlying principles for evaluating the implementation of the project plan
Lo5: Importance of new ideas and thought
Lo6: Coordination with the team members
Document Page
Section 3 Justification:
Every individual gets a clear idea about the concept with the deployment of theoretical and
practical knowledge. The internal and external factors help in enhancing working knowledge
of the individual. I have experienced that the learning can be improved by utilizing the
theoretical and practical work in the curriculum. “The working on the given project helps me
to explore and gain knowledge associated to the learning outcomes” (Li, 2012). The
coordination between the team members is the core area of every project undertaken for
study. The execution of the project depends on the planning structure which was designed by
the team members. The analysing of the data helps in the effective interpretation of the
working plan. The evaluation of the feedback report gathered from the supervisor helps in
improving the performance. I have experienced that follow up of the ethical and moral values
in the working culture helps in developing the healthy working environment. The purpose of
the project is to develop a team spirit in the coordinating units.
The study of project helps me to cover all the learning outcome of the project. “The success
of the project depends on the effective team management, planning of process and
methodologies, analysis of the skills, and monitoring the feedback collected” (Hoskins,
2008). I have chosen the project for study because it helps in aiding techniques to the
personality development the process of self-assessment and self-evaluation system.
I have collected the opinions and views of the people that the technique of self-judgement
works for them to solve the complex problem. From the research, I am able to diagnose my
strength, weaknesses, and new opportunities which can under taken to enhance the learning
outcome of the project. The big and complex problems can be easily solved with the help of
critical thinking process. “The thought process should be enhanced by collecting the
information from different sources and different situation”(Buhalis, K. 2011). The theories
based on evidences should be taken under consideration.
I have experienced that the learning outcome helps in solving the problem with the use of
interpretation of the data and information collected from the problem area, information is
broken down into various modules for analysis, listing the arguments for the assemblage of
logical steps to summarise the complex situation, and finally judging the most appropriate
decision which has the quality skills to solve the complex situation. I have experienced that
the learning can be improved by utilizing the theoretical and practical work in the curriculum.
“The working on the given project helps me to explore and gain knowledge associated to the

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
learning outcomes” (Boch, 2005). The strategy should be used for the management of critical
thinking in the reading and writing the situation.
The strategy is based on the questions like what, when, who, whom, how, which, and most
crucial is why. “The text of the critical thinking is based on logical arrangement of the
arguments for solving the problematic situation” (Prince, 2004). The external sources are
used for generating the critical reviews on the writing and reading skills. “The study of the
project helps in the demonstration of the negative and positive reasons associated with the
research helps in providing best alternative for solving the situation” (Dunlosky, 2013).
Section 4: Methods
I have chosen the simulation of the project to clearly achieve my learning outcome. The
learning can be improved by carrying the practical work so that I can predict out my mistakes
and corrected them for future reference. “The case study of undertaken gives the theoretical
review of collecting knowledge” (Cheng, 2011). The indulging of simulation model is the
best way for improving communication practices and learning experience. I have prepared a
log book while working on the simulation model of the project. According to my point of
view, simulation is the best method for study because it helps us to gain real life experience.
The focus of the research study is to enlighten the work based learning attitude of the student
for self-enhancement by making self-reflection. “The problematic situation can be easily
handled through the deliverables of the work based learning experience” (Wirth, 2015). The
action plan should be prepared by visualizing the intellectual problems and the area of
concerns.
The examination and the collection of information related with the work based learning can
be done with the division into four sectors which can be named as planning, deployment,
surveillance, and reflection.
The process of planning focuses on the development of the framework which is based on the
past experience, learning material, measurement of success and failures, use of learning
resources, and other parameters. It helps in analysing the flaws and obscure which occurs in
the past history of the student. The strength and weaknesses can be clearly identified. The
identification of the problem can be easily done with the deployment of improved
communication techniques.
Document Page
The advantages and disadvantages of chosen alternatives help in identifying the possibility of
the solution to cope up with the situation. The work based learning should be applied on the
different models generated by the different suggestions given on the current problematic
situation to measure the effectiveness of the solution.
The reflection is the method used for self-reflecting through the self-assessment program on
the basis of data collected through the medium of success and failure of the alternatives used
for overcoming the problematic situation. The checklist should be prepared for getting the
correct details of data related with the self-assessment of the situation.
The preparation of the learning logbook helps in collecting evidence for increasing learning
experience. The ideas and feeling expressed in the log book can be used for the future
reference.
Section 5: Time Table:
The planning of the simulation study of project should be designed before hands so that
learning experience can be enhanced. The simulation learning is completed in different
phases which are divided in to the study of 10 weeks.
In the week 1, the strategy is prepared for completing the study of the project.
In week 2, we have worked as a team for collecting the different views and ideas of
the team member.
In week 3, we are gathering information to analyse the decision for creating new
opportunities and aim.
In week four, we will work in regards to take final decision.
The study through simulation weeks helps in creating the log book, table, grid, stakeholder
analysis. The log table added in the Appendix which specifies the action and the learning
outcome in the simulation weeks undertaken.
Section 6: Evidences of accomplishment
It has been seen that the method of work based learning concept is important for the students
because it helps solving the issues which the student can face in their working curriculum.
The independency of the students should be promoted through the conclusion drawn from the
situation and the power of reasoning to give the judgement of the situation. The behaviour of
the student can be judged by the power of analysing the situation and generating the creative
thinking and procedures about the problem area. It helps in providing immediate feedback on
the basis of ideas and thoughts. The power of memorizing the potential pitfalls helps in
enhancing the creative thinking of the student. The new skills can be added from
Document Page
summarizing the situation with the help of logical arrangement of the information. “The
synchronization of information collected from the different sources helps in creating logical
sequence of the information to derive the most relevant and possible solution for the
scenario” (Anderson, 2015). At the completion of the project simulation study we are able to
present the following:
Learning contracts
Report on the project Hydroelectric Dam Laos system”
Log Tables of every week
Maintenance of the incident diaries
Positive and negative feedback of the tutor
Grid table
Project Log
References:
Wirth, K. (2015). Learning to learn. 1st ed. [ebook]. Available from:
https://www.macalester.edu/academics/geology/wirth/learning.pdf [Accessed 07 Dec. 2017].
Cheng, C. (2011). The approach of learning study: It origin and implications. 1st ed. [ebook].
Available from: http://www.oecd.org/edu/ceri/Eric%20Cheng.Learning%20Study.pdf
[Accessed 07 Dec. 2017].
Dunlosky, J. (2013). Improving students learning with effective learning techniques. 1st ed.
[ebook]. Available from:
http://www.indiana.edu/~pcl/rgoldsto/courses/dunloskyimprovinglearning.pdf [Accessed 07
Dec. 2017].
Prince, M. (2004). Do active learning work? A review of the research. 1st ed. [ebook].
Available from:
http://www4.ncsu.edu/unity/lockers/users/f/felder/public/Papers/Prince_AL.pdf [Accessed 07
Dec. 2017].
Buhalis, K. (2011). Learning contracts. 1st ed. [ebook]. Available from:
http://umsl.edu/~wilmarthp/modla-links-2011/Learning-contract.pdf [Accessed 07 Dec.
2017].

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Hoskins, B. (2008). Learning to learn: What is it and can it be measured. 1st ed. [ebook].
Available from:
https://www.researchgate.net/profile/Ulf_Fredriksson/publication/242715655_Learning_to_L
earn_What_is_it_and_can_it_be_measured/links/0c960530f385501c8a000000/Learning-to-
Learn-What-is-it-and-can-it-be-measured.pdf [Accessed 07 Dec. 2017].
Li, N. (2012). Aprroaches to learning: A literature review. 1st ed. [ebook]. Available from:
http://www.ibo.org/globalassets/publications/ib-research/approachestolearningeng.pdf
[Accessed 07 Dec. 2017].
Boch, F. (2005). Note taking and learning: A summary of research. 1st ed. [ebook]. Available
from: https://wac.colostate.edu/journal/vol16/boch.pdf [Accessed 07 Dec. 2017].
Meyer, B. (2008). What is independent learning and what are the benefits of the students. 1st
ed. [ebook]. Available from:
http://www.curee.co.uk/files/publication/[site-timestamp]/Whatisindependentlearningandwha
tarethebenefits.pdf [Accessed 07 Dec. 2017].
Anderson, G. (2015). Qualities of learning contracts. 1st ed. [ebook]. Available from:
http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.463.9081&rep=rep1&type=pdf
[Accessed 07 Dec. 2017].
Appendix A:
Name:
Tutor:
Project Placement:
Week Number Activities Learning
Week 1 Remember The personal understanding on the
situation helps in memorising the work
experience in the field of social, cultural,
and spiritual concerns.
The work based learning helps in
increasing the personal understanding. The
situation which we personally handle will
Document Page
Experience
Focus
Learn
Evaluate
Consider
always be remembered throughout the life.
The focus should be given on the values
which are received from the working
experience
The events which occurred should be
reconsidered for generating different
perspective views of the given situation
The development of the personal ability
depends on the self-reflection
The communication procedures should be
taken under consideration for generating
new opinions and creating new values for
the different perspectives
Failure gives the clear understanding of the
new ideas and work based experience
Document Page
Trial
Week 2 Remember
Experience
Focus
Learn
The traditional knowledge is completely
changed with the work based experience.
The emphasis should be given on
completing the tasks in the skilful manner.
The professional and personal training can
be effectively given to the student with the
utilization of work based training
experience
The focus should be given on designing
the intellectual framework for self-
reflection
It helps in analysing the situation in which
the individual has to work hard to gain the
objective.
The evaluation through reflection helps in
regulating observation with the self-control
handling procedures.
The external supervision should be taken
under consideration while taking any
decision.
Work based learning should be
experienced for gaining the working
experience during the higher education.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Evaluate
Consider
Trial
Week 3 Remember
Experience
Focus
The Work based learning is based on four
principles which are classified as
interpretation, analysing, evaluation, and
reasoning. It helps in achieving good
grades in exam and gets a profession of
their choice.
It helps in developing the strategic
approach to achieve the goal of life by
answering the question like why? When?
Where? Who? What? And How?
The focus should be given on the
generation of critical reviews for analysing
the conclusion drawn from it.
The Work based learning helps in
developing the rationality in the reviewing
of the judgement drawn from the
information gathered.
Document Page
Learn
Evaluate
Consider
Trial
Assumptions based questions should be
reviewed for gathering the correct detail
from the scenario
The fair policies and consideration to the
viewpoints should be taken under
consideration. The management of
activities should be given preference for
the flawless achievement of the goal
Work based learning should be
experienced for gaining the working
experience during the higher education.
Week 4 Remember The Work based learning helps in dividing
the section of the context into different
Document Page
Experience
Focus
Learn
modules for the effective assessment of the
related data. The evaluation and reviewing
of the data helps in reducing the
occurrence of the obscure.
It is experienced that backup can be
created with the thinking of the past
experience which helps in reducing the
potential pitfalls.
The validity of the text should be focused
for undergoing further studies
It is learned that the ambiguity can be
reduced with the utilization of Work based
learning which can be improved by making
the reflection of the past experience
It is evaluated that the Work based
learning and self-reflection are the two
major activities which should be used for
preparing for future experience
The Work based learning is based on four
principles which are classified as
interpretation, analysing, evaluation, and
reasoning. It helps in achieving good
grades in exam and gets a profession of
their choice.
The reviewing of the past experience helps
in solving the future problems

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Evaluate
Consider
Trial
Week 5 Remember
Experience
The learning can be accessed from work or
through reading journals and other data.
The learning from the journals should be
self-reflected for generating the multiple
interpretation of experience.
The learning from the journals should be
self-reflected for generating the multiple
interpretation of experience.
The focus should be given on improving
the future action
Document Page
Focus
Learn
Evaluate
Consider
Trial
The physical skills of the student can be
enhanced with the generation of self-
reflection from the learning through the
journals.
The representation of the physical skills
helps in evaluating the learning skills of
the student
The consideration should be given on the
initial learning model and the
accumulation model used for study.
The constructive view should be trialled
for managing the assimilation of the
processes.
Week 6 Remember The strength of the students can be
enhanced to develop the physical skills for
Document Page
Experience
Focus
Learn
the selection in chosen profession or
career. The development of the strength
depends upon self –awareness, self-
reflection, self-control, and self-disclosure.
The self-management can be achieved by
establishing the ethical values in the
working curriculum of the students.
The focus should be given on building the
team spirit and to resolving issues related
with the occurrence of the conflict.
The use of ethical values helps in
mentoring the improved performance of
the student
The evaluation of the self-management can
be done through the effectiveness achieved
in interpersonal and intrapersonal role and
understanding the working experience of
the team.
The consideration should be given on the
potential limitation related with the
personal attitudes, behaviours, and
personality development.
The consideration should be given on the
potential limitation related with the
personal attitudes, behaviours, and
personality development.
The trial should be given on the

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Evaluate
Consider
Trial
identification of the conflicts and biases
Week 7 Remember The cooperation is the fundamental
principles which should be used for
balancing the knowledge gained from the
journals and the self-reflection. The
process and methodology get influenced
by the amount of data collected from
different sources.
Document Page
Experience
Focus
Learn
Evaluate
The special skills can be developed by
taking decision on the opportunity
provided. The knowledge can be gained in
terms of experiments, presentation,
practical, and proposition.
The focus should be given on the liberation
and exploration of human working
experience.
The information system helps in
accumulating the new knowledge
associated with the required tasks.
The initialization an emergence should be
created for enhancing the decision making
capabilities of the individuals
The development of the records is the
important tasks for future reference. The
collection of negative feedback helps in
pointing the knowledge in the right
direction
The issues should be discussed for
generating different perspective views.
Document Page
Consider
Trial
Week 8 Remember
Experience
The SOAR system is useful methodology
for preparing the individual for the
professional development to achieve the
career. The reflection of strength,
opportunities, aspiration, and results helps
in generating the values for the individual
to achieve the aim of the life.
The practice based learning plays a crucial
role in the personality development of the
individual. It helps in resolving the issues
related with the self-reflection in the multi-
disciplinary approach.
The focus should be given on the success
and failure achieved in the practice based
learning.
The learning experience can be measured
in terms of success and failure which
occurred in the practical based or work

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Focus
Learn
Evaluate
Consider
Trial
based learning experience.
The potential skills of the individual can be
measured in terms of increased in the
productivity in relation to the work
provided.
The rationality should be taken under
consideration during the development of
the SOAR model
The SOAR system helps in the elimination
of the confusion created due to the
integrated development.
Week 9 Remember The development of the career depends
upon the self-reflection and management
Document Page
Experience
Focus
Learn
Evaluate
system for getting improved results
The potential pitfalls noted from the past
experience should be avoided in the future
development plan.
The focus should be given on the
management of activities through the
analysis of the SOAR system
The practical based learning and work
based learning can helps in developing
personal physical skills of the individual
The evaluation of the physical skills can be
done by the deployment of Work based
learning to know the area of deficiency in
the particular individual
The consideration should be given on
overcoming the areas of limitation where
the individual is not able to prove himself
The self-awareness should be regulated for
getting the sufficient knowledge about the
flaws and the area of concern
Document Page
Consider
Trial
Week 10 Remember
Experience
Focus
The special skills can be developed by
taking decision on the opportunity
provided. The knowledge can be gained in
terms of experiments, presentation,
practical, and proposition.
It is experienced that backup can be
created with the thinking of the past
experience which helps in reducing the
potential pitfalls.
The focus should be given on recognising
the strength and weaknesses of the
individual by making a comparison
between the work based learning and the
learning journals
The specialization and skills should be
identified to be developed for getting the

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Learn
Evaluate
Consider
Trial
better opportunity.
The evaluation through reflection helps in
regulating observation with the self-control
handling procedures.
The critical reviews generated by the
external parties should be taken under
consideration for improving the self-
awareness program
The different parameters generated from
the different perspective views should be
trialled to get the best output at the by
knowing the flaws and area of concerns
proactively.
Document Page
Appendix B: Gantt chart
Document Page
Section B: Report
Introduction:
The research focuses on the role played for self-reflection on the study of simulation model
of Hydroelectric Dam Laos system. Nam Kading Hydroelectric power plant is chosen for
study to improve the learning experience. The issues and complexities of the project should
be reduced by managing strategic decision. The decision is based on the factors which are
categorised as location of the Dam, capacity of the dam for holding water, arine life of the
water such as fish, local population, management of the road transportation network,
availability of the medical facilities, living standard of the population is low, and others, The
work based learning is interdepended terms such as self-reflection, self-awareness, self-
management, self-monitoring, and others. There are various parties which are interested in
the construction of Nam Kading hydro power project which are categorised as union of
construction workers, experts of environmental study, NGOs for maintaining ecological
balance, Archaeological experts, forestry and agricultural office, and local population of
Laos. The shareholders which are associated with the Dam are having 40% of hydro con,
35% of Lao PDR holdings, and 25% PTE (Thai energy). There are three investors which are
interested in the project are Investment fund of Norway, world bank, and other commercial
lenders. The construction of dam was undertaken by the contractors named as Hydro con,
PTE (Thai energy), Devela Sa, and other suppliers. The large amount of water is used by the
hydroelectric power plant.
Reflection
During the course of the project on Hydroelectric site, I gain experience in the field of
simulation, matching complexities with the real world problems, team build up, and others.
“There are two site chosen for study which are developed on Nam Kading and Nam Mouan
rivers” (Hudson, 2012). It has been noticed that the site A development plan result into the
floods occurrence for the local people. The maximization of the power production requires
the construction of two dams at two different site locations. It has been found that the site B
consumed 30% less water than site A. Around 4500 villagers have to be relocated during the
development of the project. “The relocation of the people have affected their daily life style.
The transmission line of the power plants is getting increased from Laos to Thailand” (Hall,
2012).
The study of this project helps me to identify the communication management system
between different participating units of the project. “The life cycle of marine animals get
affected due to the inclusion of hydroelectric power plant” (Lai, 2011). The local population
is largely dependent on the fish for food. The reducing population of the fishes can affect the
growth rate of the local area. “The management of the dam result into the loss of 50% of fish
population” (Johnson, 2014). The road network of the society can be improved by managing
electricity grid by developing the infrastructure connection from the power plant. The new
opportunities can be created for the development of transportation. The medical facilities of
the local population should be enhanced. The transmission lines helps in providing the
electricity to the population located at the Laos and Thailand. It has been noticed that the site
A development plan result into the floods occurrence for the local people. The maximization

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
of the power production requires the construction of two dams at two different site locations.
It has been found that the site B consumed 30% less water than site A.
The division of the tasks into different modules helps in generating the new ideas by looking
back to the conclusion of the previous module which helps in generating the logical sequence
of the ideas and vision to give the clear concise view of the situation to take decision. “The
validity and verification of the decision should be taken under consideration before the
deployment for the resolving the issues” (Firdaus, 2015). The list of relevant question helps
in getting towards the situation to get best suitable alternative. The investment on the
construction of the dam depends on the following factors:
Impact on the Landscape: “The impact of landscape helps in defining path of
transmission lines for the development of low profile lines” (Duderstad, 2012).
Risk of accident: The construction of the project is equipped with the risks of accident
which can cause injury and death to the labour during the operation of the plant.
Employment: The new opportunities of employment can be created for the local
population of Laos. There can be requirement of skilled and unskilled labour,
technician, crew manager, and others. The contractors and sub-contractors can be
hired from the Thailand.
Output Energy: The output of the operational plant can be measured in terms of
energy produced. The output energy is used for maintaining the flow of water from
the river stream. It has been analysed that the dam of NamKading river produce more
electricity at site A than site B.
Profitability: The management of the cash flow helps in analysing the measure of
profitability ratio. The cash flow can be measured in terms of operational costs and
the net present value of the project.
Corporate taxes: The Laos government applies the corporate taxes on the licensing of
the project.
The decision of the Site Management depends upon the site of the village, population of the
fish, development of the community, rating of the landscape, risks associated with accident,
creation of employment, and measure of profitability ratio. The recognition of the stakeholder
engagements helps in exploring the need and requirement of the Work based learning
fundamentals. The self-management helps in judging the decision taken for resolving the
issues related with the complex situation. The decision is based on the factors which are
categorised as location of the Dam, capacity of the dam for holding water, marine life of the
Document Page
water such as fish, local population, management of the road transportation network,
availability of the medical facilities, living standard of the population is low, and others. The
national and international standards should be followed for the deployment of transmission
lines between different participating units. The new technologies are laid down for improving
the construction of the dam. The ethical issues should be cleared of the participating skilled
workers placed at the construction site. The active participation of the local community
members of Laos helps in resolving the conflicts and issues of the people. The flow of water
helps in defining the amount of the output produced from the construction of the two dams at
two different sites.
“The comparison made between the two helps in finding out the most suitable alternative for
resolving the issue in the complex scenario” (Johnson, 2014). The judgement and the
decision should be measured in terms of the positive and the negative effect associated with
its consequences when applied to the realistic situation. The generalization should be avoided
and specialization should be applied. It helps in improving the self-image by the process of
self-reflection.
The relocation of the local people involves financial investment for the settlement of the
people effectively. The local infrastructure should be improved so that the living style of the
common people can get improved with the development of local communities, road
construction, laid down of the transportation network, providing educational platform, and
providing medical facilities to the consumers. he alignment of the activities helps in
managing the situation according to the requirement of the transition information. The
innovative ideas, opinions, vision, and thoughts should be aligned to achieve a single
statement for improving the situation. The power of generating electricity can be tested by
reducing the errors occurred in the past on diagnosing the decision taken on the situation. The
literatures are studied for generating the picture of action taken to create the knowledge for
determining the new phenomenon to solve the situation. The interpretation of the reflection is
the process which is used for determining the new ideas for the scenario. The generation of
the new ideas depends on the cycle of motivation, action, and re-motivation. The relevant
data should be provided for creating new vision of the situation. The level of confidence can
be measured with the effective generation of relevant idea. The living standard of the laos
people is of low grade which can be improved with the development of the dams in their
locality because the local people get employment which increases the means of earning,
improving road facilities, education system, and medical facilities. The road network of the
Laos can be upgraded with the effective management of electricity grid in the community.
The funds should be raised for providing educational facilities.
Deployment of Transmission lines:
The development of power generation from the hydroelectric power plant is used for
providing connection between Laos and Thailand. The 165Km is covered through the
transmission lines for covering national conservation area. The operational capability of the
plant helps in reducing the risks during the working hours of the plants.
Document Page
Investment in the laying down of construction process:
The investment in the construction process helps in laying down rules and regulations on the
basis of national and international level. The efficiency of the power plant can be improved
by laying down the transmission lines all over the project. On-going operations are used for
facilitating the best practices for balancing the financial cost of the system. The long term and
short term cost is pre-defined so that the new products, technologies, and equipment can be
purchased according to the requirement of the project.
Impact on Landscape:
The rating of the landscape is in between 0 to 5. The straight cut method is used for laying
down the transmission lines for the development of the site. The deployment of latest
technologies helps in improving the negative effect of constructing the dam. “The validity of
the source information should be checked for developing further plans and generating list of
alternatives” (Cossette, 2013). The ethical values should be given privilege so that the
sentiments and emotion should not be affected.
Risks associated with Accident:
The reduction in the complexity of the project helps in reducing the amount of risks
associated with the occurrence of accident. “The effective decision in the development of the
construction plan helps in reducing the risks occurred at the site location” (Dagget, 2013).
The solidification of the ideas helps in measuring the success of the creative thinking skills
used for overcoming the situation.
Employment:
The output of the project depends upon the operational output of the power plant. The new
opportunities are opened for employment in the locality which results into improving better
lifestyle. The investment plan and skilled labour is used for completing the construction of
the project effectively. “The living standard of the laos people is of low grade which can be
improved with the development of the dams in their locality because the local people get
employment which increases the means of earning, improving road facilities, education
system, and medical facilities” (Bower, 2013).
Output energy produced:
It has been found that the higher amount of energy is produced from the site A due to the
flow of water from the Nam Kading river. “The output of the project depends upon the
operational output of the power plant” (Boud, 2005). The collection of information helps in
getting the live experience of generating decision to solve the problem.
Profitability:
The profitability is the important concept for judging the output produced from the project.
The cash flow management helps in improving the operational capability of the organization.
The utilization of the Work based learning opens the path for the occurrence of the innovative
ideas. “The parameters should be measured for applying Work based learning in the areas of
tasks, challenges, and the associated assignments” (Shacklett, 2004). The strategy of
resolving the issues is based on the answers highlighted for the questions such as when, why,
how, what, which, whom, and others. The resolution of the verbal statement helps in aiding
values to the validity of the creative thinking. The calculation of the net present value helps in
measuring the profit of the enterprise.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Corporate Taxes:
The Laos government helps in measuring the concession in licensing of the project. “The
guidelines should be followed for shaping the ideas to attain the level of perfection”
(Macmilian, 2005). The interpretation of the answers should be accurately done. “The focus
should be given on the findings and the evaluation counted for the data collected” (Beale,
2012). The faults and errors in the design can affect the ideas generated on the basis of
creativity. The sale of electricity helps in calculating the profit of the power plant.
Outcome of the project:
The development plan of the project depends on the construction of site A and site B. The site
A is equipped with flooding of water at the location. The burial site can remain unaffected. It
has been found that 60% of the marine life gets affected. “The output of the annual energy
can be raised with the development of hydroelectric Dam at Laos. The new opportunities are
created for the employees” (Bolton, 2015). The low investment is required for the
development of the community. “The straight cut method is used for managing the
transmission lines between Laos and Thailand” (Scott, 2013). The profitability of the project
can be raised to $ 110000. The collection of corporate taxes is about $ 24200.
Conclusion:
In this paper, we are focusing on the Nam Kading hydro power project. There are various
parties which are interested in the development of the hydro power plant which are named as
union of construction workers, expert of environment, NGOs for ecological balance,
Archaeological interest, office of agricultural and forestry, and local villagers. 40% of the
shares are hold by hydro con, 35% is of Lao PDR holdings, and 25% of PTE energy. The
transmission line for the supply of electricity is laid down from Laos and Thailand. The
development plan of the project depends on the construction of site A and site B. The site A
is equipped with flooding of water at the location. The output of the annual energy can be
raised with the development of hydroelectric Dam at Laos. The new opportunities are created
for the employees. The process of Work based learning should be passed from the
strategically cross sectional view of the situation. The translation of the activities helps in
achieving the ideas for the betterment of the area of concern. The information used as the
source of evidence should be reviewed for the validity of data collected matches with the
situation or not. The relevant data should be provided for creating new vision of the situation.
The profitability of the Laos can be improved with the development of the new hydroelectric
dam. The feeling of motivation and development of the action plan helps in generating the
new vision of the complex situation to provide new ideas for taking effective decision and
judgement. The live experience of the problematic situation aids the experience in generating
the creative ideas and innovative schemes of action plan.
References:
Beale, C. (2012). Learning and teaching investment fund. 1st ed. [ebook]. [Accessed 07 Dec.
2017].
Bolton, G. (2015). Explorative and expressive writing for personal and professional
development. 1st ed. [ebook]. [Accessed 07 Dec. 2017].
Document Page
Boud, D. (2005). Promoting reflection in professional courses: The challenge of context. 1st
ed. [ebook]. [Accessed 07 Dec. 2017].
Bower, L. (2013). Student reflection and Work based learning. 1st ed. [ebook]. [Accessed 07
Dec. 2017].
Cossette, G. (2013). The development of Work based learning skills. 1st ed. [ebook].
[Accessed 07 Dec. 2017].
Dagget, W. (2013). Preparing students for their technological future. 1st ed. [ebook].
[Accessed 07 Dec. 2017].
Duderstad, J. (2012). Engineering for the changing world. 1st ed. [ebook]. [Accessed 07 Dec.
2017].
Firdaus, F. (2015). Developing Work based learning skills of student in Mathematics
learning. 1st ed. [ebook]. [Accessed 07 Dec. 2017].
Hall, W. (2012). Thinking critically. 1st ed. [ebook]. [Accessed 07 Dec. 2017].
Hudson, H. (2012). Skills for improved productivity, employment growth, and development.
1st ed. [ebook]. [Accessed 07 Dec. 2017].
Johnson, R. (2014). Designing the future: a strategic vision and plan. 1st ed. [ebook].
[Accessed 07 Dec. 2017].
Lai, E. (2011). Work based learning to literature review. 1st ed. [ebook]. [Accessed 07 Dec.
2017].
Macmilian, P. (2005). Personal strategies for Work based learning. 1st ed. [ebook].
[Accessed 07 Dec. 2017].
Scott, C. (2013). The future of learning 2. 1st ed. [ebook]. [Accessed 07 Dec. 2017].
Shacklett, J. (2004). Learning to think and think to learn. 1st ed. [ebook]. [Accessed 07 Dec.
2017].
Document Page
Appendix A: Stakeholder Grid:
STAKEHO
LDER
Sharon
Brown
Executive
Director,
Hydro
Con
Thongsa
vath
Boupha
Energy
Minister
,
Laotian
Govern
ment
Tanipat
Thinnakor
n
Project
Head,
PTE Thai
Energy
Birgitt
Hanssen
Fund
manager
,
Investm
ent
Fund of
Norway
Michele
Chow
Project
Director
,
World
Bank
Mr.
Soulivo
ng
Directo
r,
Provinc
ial
Agricul
ture &
Forestr
y
Office
Keo
Xayavong
Village
leaderRole/
organisation
Estimated
Importance
High High Medium High High Mediu
m
low
RATIONAL
Priorities
and
preferences
for the site
developmen
t plan, e.g.
dam sites,
energy,
profit,
employment
etc.
Collectio
n of
informati
on for
better
managem
ent of
communi
cation
Plan for
the
manage
ment of
resource
s
He
focuses
on
planning
the supply
of energy
in the
Thailand
Focuses
on the
financial
conditio
n of
Nam
kading
hydro
power
plant
Focuses
on the
econom
ic
develop
ment of
the
project
Deploy
ment of
policies
and
regulati
on
Developin
g political
links with
the
governme
nt.
SOCIAL/POLITCAL
Which
stakeholders
influence
them
Social Influenc
ed by
ministry
of Laos
for
energy
develop
ment
Focuses
on foreign
investmen
t
Influenc
ed by
private
and
public
sharehol
ders
Influenc
ed by
foreign
investm
ent
Influen
ced by
national
govern
ment
Influence
d by local
people
COMMUNICATION
e.g. form
and
frequency
preferences,
being
involved,
how they
are
“handled”
Collectio
n of
informati
on for
better
managem
ent of
communi
cation
Identific
ation of
risks
associat
ed with
the
business
investm
ent
Communi
cation
between
Laotian
governme
nt
Long
term
planning
for
investm
ent
Have
diploma
tic skills
for the
manage
ment of
activitie
s
Satisfac
tion of
the
associat
ed
stakeho
lders
Communi
cation
with the
local
villager

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
PERSONAL CHARACTERISTICS
e.g. hidden
or personal
agendas,
cultural
aspects
Develop
ment of
dominanc
e for
creating
personal
agendas
Focuses
on
political
career
Focuses
on
cultural
aspects
Develop
ment of
personal
agendas
Plannin
g for
clean
energy
Friendl
y
behavio
ur for
develop
ing
politica
l links
Having
leadership
qualities
STAKEHOL
DER
Francois
Delors
Constructi
on
Subcontrac
tor,
DEVELA
Buk
Phongvon
sa
Union
leader,
Construct
ion
workers
Josephine
Candor
Professor
of
Archaeol
ogy
Kai
Chareonku
l
Environme
ntal Impact
Expert
Gert
Offerbac
h
Activist,
EcoActio
n
Daniel
Fairbanks
Bureau
chief,
Internatio
nal
News
Agency
Role/
organisation
Estimated
Importance
High High High Medium Medium High
RATIONAL
Priorities and
preferences
for the site
development
plan, e.g. dam
sites, energy,
profit,
employment
etc.
Develop
local
connection
with the
south east
asia
Responsibl
e for the
constructio
n of the
dam
Develop
ment of
rules and
regulation
for
political
organizati
on
Develop
ment of
the burial
site
Works on
taking
decision
related to
the
environme
nt
Work on
solving
ecologica
l
problems
Delivery
of news
related to
hydro
power
plant at
Laos
SOCIAL/POLITCAL
Which
stakeholders
influence
them
Political Social Social Social Social Political
COMMUNICATION
e.g. form and
frequency
preferences,
being
involved, how
Works on
solving
issues and
complexity
Safeguard
ing the
employm
ent
Lack of
site
protection
Connectio
n between
Thailand
and Laos
governmen
Assessme
nt of the
dam
developm
ent plan
Assessme
nt of the
dam
developm
ent plan
Document Page
they are
“handled”
t
PERSONAL CHARACTERISTICS
e.g. hidden or
personal
agendas,
cultural
aspects
Hardworki
ng
Ambitiou
s
Hidden Friendly
behaviour
Forward
looking
Personal
agendas
Appendix B: Simulation of Hydroelectric Dam Laos:
Appendix 3: Skill Grid:
Skill What I
learned?
Where and
when I
learned?
How I
learne
d?
Evidence Location
of evidence
Progressi
on. What
next?
Communicat
ion
The
communicat
During the
course of
Prepa
ration
Presentati
on
Learning
contracts
Power
point
Document Page
ion should
be carried
out on the
basis of
technology
and related
information
the project,
I
discovered
that
creative
thinking
plays a
powerful
role in
carrying
out the
activities
of
questi
ons,
report
s, and
feedb
ack
Audios
Videos
Learning
outcome
Report on
the project
Hydroelect
ric Dam
Laos
system
Log Tables
of every
week
Maintenan
ce of the
incident
diaries
Positive
and
negative
feedback
of the
tutor
Grid table
Learning
journal
presentati
on
Appendix 4: Project Log
Name:
Tutor:
Project/Placement
Date of
event
What was the
development
activity?
What was I
expecting to learn?
What have I
learned?
How will I apply this
learning?

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
October 3,
2017
Meeting with Project
manager of the project
New Ideas and
presentation skills
Presentation skills and
management of
activities
Scheduling of
activities helps in
achieving the goal and
objective
October
15, 2017
Selection of the team
members
New Skills and
learning capability
Team Participation
Implementation of
skills in the
deployment of activity
schedule
Division of roles and
responsibilities.
October
28, 2017
Determining the
project scope and the
development of the
learning outcome
End product and the
learning output
Scope management Setting of scope
according to the
identified mission
November
12, 2017
Analysis of the
shareholder working
schedule
Ideas and issues of the
stakeholders
Resolving
complexities during
the course of project
schedule
Conflict management
November
26, 2017
Generation of the
communication plan
with the participating
units
Flow of
communication
between different
participating units
Importance of formal
and informal
communication
Communication
management
Appendix 5: Incident Log Sheet
Name:
Tutor:
Project Placement:
Incident:
Date Time Event/Action Taken What did I learn?
15 oct, 2017 5.00 pm Relocation of the local people Lifestyle of the people
get affected
17 oct, 2017 Marine Life get affected Availability of food get
Document Page
affected
28 oct, 2017 Construction of road Improving the lifestyle of
the people
2 Nov, 2017 Construction of hospitals Provides medical
facilities
15 Nov, 2017 New opportunities for employment Improving life style of
people
23 Nov, 2017 Education Improved income
provides good education
to the children
1 out of 36
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]