MSc Project Management Project: Arden University Berlin
VerifiedAdded on 2025/05/04
|20
|4731
|375
AI Summary
Desklib provides solved assignments and past papers to help students succeed.

Awarding Body :
Arden University
Program Name :
Arden Berlin – MSc Project Management level
7
Module Name :
Assessment title :
Project Management
Student number :
Tutor name :
Words count :4703
1
Arden University
Program Name :
Arden Berlin – MSc Project Management level
7
Module Name :
Assessment title :
Project Management
Student number :
Tutor name :
Words count :4703
1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
Introduction.................................................................................................................................................3
Task 1..........................................................................................................................................................4
A) Project Initialization...........................................................................................................................4
Subject information.................................................................................................................................4
Material information................................................................................................................................5
Market Information.................................................................................................................................5
Stakeholders information.........................................................................................................................5
Data analysis...........................................................................................................................................6
Cost and benefits analysis........................................................................................................................6
Management............................................................................................................................................6
Risk analysis............................................................................................................................................7
B) Project Structure.................................................................................................................................7
C) Project Lifecycle Methodology...........................................................................................................8
D) Risk Management...............................................................................................................................9
Task 2........................................................................................................................................................10
Project Plan...........................................................................................................................................10
Task 3........................................................................................................................................................14
In order to improve, describe clearly which five skills you consider to be most important. Reflect on
which skills you have learnt and how it will help you on the future. Describe your plans how you
intend to develop your skills in the future..............................................................................................14
Qualification/certification......................................................................................................................14
Logical thinking and problem solving-..................................................................................................14
Patience and attention on details............................................................................................................15
Developing skills...................................................................................................................................15
Conclusion.................................................................................................................................................17
References.................................................................................................................................................18
2
Introduction.................................................................................................................................................3
Task 1..........................................................................................................................................................4
A) Project Initialization...........................................................................................................................4
Subject information.................................................................................................................................4
Material information................................................................................................................................5
Market Information.................................................................................................................................5
Stakeholders information.........................................................................................................................5
Data analysis...........................................................................................................................................6
Cost and benefits analysis........................................................................................................................6
Management............................................................................................................................................6
Risk analysis............................................................................................................................................7
B) Project Structure.................................................................................................................................7
C) Project Lifecycle Methodology...........................................................................................................8
D) Risk Management...............................................................................................................................9
Task 2........................................................................................................................................................10
Project Plan...........................................................................................................................................10
Task 3........................................................................................................................................................14
In order to improve, describe clearly which five skills you consider to be most important. Reflect on
which skills you have learnt and how it will help you on the future. Describe your plans how you
intend to develop your skills in the future..............................................................................................14
Qualification/certification......................................................................................................................14
Logical thinking and problem solving-..................................................................................................14
Patience and attention on details............................................................................................................15
Developing skills...................................................................................................................................15
Conclusion.................................................................................................................................................17
References.................................................................................................................................................18
2

3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Introduction
The project is involved the various task completed with team and management. The business is
in for of projects and their management is target achieving. The project have time limit, targets,
theme, and budget, cost effects, benefits and company members promotions. If the only project is
known and no ideas about the strategy and work handled by any one is more typical to work
done. The initiation of the project is by learning about their objectives and strong research about
it. The project involves the management of the resources available with work done sustainably
and good earn by the project benefits. Initiation of the project by identify the project objects,
target group and management and planning of the project tasks and execution of the task,
planning alternatives, cost and risk by the project and their solutions.
4
The project is involved the various task completed with team and management. The business is
in for of projects and their management is target achieving. The project have time limit, targets,
theme, and budget, cost effects, benefits and company members promotions. If the only project is
known and no ideas about the strategy and work handled by any one is more typical to work
done. The initiation of the project is by learning about their objectives and strong research about
it. The project involves the management of the resources available with work done sustainably
and good earn by the project benefits. Initiation of the project by identify the project objects,
target group and management and planning of the project tasks and execution of the task,
planning alternatives, cost and risk by the project and their solutions.
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Task 1
A) Project Initialization
The project has subject of work done and theme of target achieve. The project has subject and
target object in way of something researching and type of assessment. The information is about
the project collecting by the sources of trust and previous case studies. The project knowledge
has some parts of the information collected in fields. The software development company of the
UK based is Code First Pvt. Ltd. There is working on software development related to office
automations and effectiveness of office computer work. The software company has security
relating issue on technology and product which is in under research and in idea. Collection of the
cyber law and informational technology law data and rules and regulation are by project manager
and communicated in the team for obeyed and as guideline (Barlas, et. al., 2015). The guidelines
of the company are made by the law and regulation of the government by the use of documents.
The rules of country are also regulated in quality management system in company for rules. the
rules are adopting and in practices are in daily reflects in office work like security, discipline,
work style, document formations, legal documents and authorities and employee’s qualification
is required by quality management. The information of the project is in initiation stage is
collected the source of data, conduct survey in IT companies and software company’s feedback
analysis, information from the people mostly using applications and software. The new launch
and effectiveness is included in the software by attracting more information and interactions.
Subject information
Subject of the project and reason of the project must be identified with the related issues on
positive and negative way. The project subject identification and relevant projects search are
important for the data basis and idea generation of task and reliable management. The subject of
project has regular importance like anti viruses, software for online access. Software demands in
popular way in public and resolving public issues. The time is important in the project and
completion of task step by step (Gordon, et. al., 2013). The cost and budget of project is decided
value of project and evaluations. Identification of the project is in steps of three major activities
5
A) Project Initialization
The project has subject of work done and theme of target achieve. The project has subject and
target object in way of something researching and type of assessment. The information is about
the project collecting by the sources of trust and previous case studies. The project knowledge
has some parts of the information collected in fields. The software development company of the
UK based is Code First Pvt. Ltd. There is working on software development related to office
automations and effectiveness of office computer work. The software company has security
relating issue on technology and product which is in under research and in idea. Collection of the
cyber law and informational technology law data and rules and regulation are by project manager
and communicated in the team for obeyed and as guideline (Barlas, et. al., 2015). The guidelines
of the company are made by the law and regulation of the government by the use of documents.
The rules of country are also regulated in quality management system in company for rules. the
rules are adopting and in practices are in daily reflects in office work like security, discipline,
work style, document formations, legal documents and authorities and employee’s qualification
is required by quality management. The information of the project is in initiation stage is
collected the source of data, conduct survey in IT companies and software company’s feedback
analysis, information from the people mostly using applications and software. The new launch
and effectiveness is included in the software by attracting more information and interactions.
Subject information
Subject of the project and reason of the project must be identified with the related issues on
positive and negative way. The project subject identification and relevant projects search are
important for the data basis and idea generation of task and reliable management. The subject of
project has regular importance like anti viruses, software for online access. Software demands in
popular way in public and resolving public issues. The time is important in the project and
completion of task step by step (Gordon, et. al., 2013). The cost and budget of project is decided
value of project and evaluations. Identification of the project is in steps of three major activities
5

like in scope, budget and time these are follows management and monitoring. These activities
are go through the technology and tools of software for more efficient and easy to operated.
The requirement of the public is identify and observed by the survey and many sites of feedback
collected and studies. The analysis of the data by experts is identified subject of increasing
features new software. The development of software also recognized the issue with government
and their legal documents on succeed of programming. Identify the sources of subject like
public benefit and most common in society than customer is increasing at time of promotion .
Material information
The information is collected about the project related materials like raw material, technology
tools, transportation facilities, material suppliers, stationary, etc. The material and supply of the
software product and design is collected and analysis of the Information of material suppliers.
The material suppliers are in Software Company is also required the discussion of their design
and required design for new adaptations. Alternative are also analyzed in market and their data
collection with reviews of market. The material suppliers are provided material quality
management system and their validity with life span. The all needs of material features and
quality related is involved document and certificates work on the material. Material is used in the
software company found IT and computing manufacturing companies where mostly contact to
manufacturers found cost effective and low from market cost range.
Market Information
Information of the market is collected by marketing manager in reference demand of the
software, software related issues, public views and data collection of other similar companies.
The data collection of the market research is analyzed by the team of project in all aspects by the
view of product featuring benefited in future. The market information is also involved the
information of alternatives of sources and cost analysis. Some documents of verify suppliers are
also checked for quality system.
Stakeholders information
The information of stakeholders is collected in the market investigation is provided best
information about the project works. The project work is analyzed by the stake holder and told
6
are go through the technology and tools of software for more efficient and easy to operated.
The requirement of the public is identify and observed by the survey and many sites of feedback
collected and studies. The analysis of the data by experts is identified subject of increasing
features new software. The development of software also recognized the issue with government
and their legal documents on succeed of programming. Identify the sources of subject like
public benefit and most common in society than customer is increasing at time of promotion .
Material information
The information is collected about the project related materials like raw material, technology
tools, transportation facilities, material suppliers, stationary, etc. The material and supply of the
software product and design is collected and analysis of the Information of material suppliers.
The material suppliers are in Software Company is also required the discussion of their design
and required design for new adaptations. Alternative are also analyzed in market and their data
collection with reviews of market. The material suppliers are provided material quality
management system and their validity with life span. The all needs of material features and
quality related is involved document and certificates work on the material. Material is used in the
software company found IT and computing manufacturing companies where mostly contact to
manufacturers found cost effective and low from market cost range.
Market Information
Information of the market is collected by marketing manager in reference demand of the
software, software related issues, public views and data collection of other similar companies.
The data collection of the market research is analyzed by the team of project in all aspects by the
view of product featuring benefited in future. The market information is also involved the
information of alternatives of sources and cost analysis. Some documents of verify suppliers are
also checked for quality system.
Stakeholders information
The information of stakeholders is collected in the market investigation is provided best
information about the project works. The project work is analyzed by the stake holder and told
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

about the scope of the project and site earn by this project as by product. The target group of
effect is also provided by stakeholders. They are the person or group who has knowledge about
the particular products. The stake holder has experience of mostly issues which are disturbed the
project. They are also source of information about material, relative services, market effectively,
and people issues and benefits. The criteria of the promotion of product are also involved in the
stake holder information’s. Previously did project have data of stakeholders and their contact for
more informations involving about search in market may be accessed.
Data analysis
The data of the project is collection form the various sources and analyzed. The data handling is
involved the step wise tasks for the data management and isolated project benefit Information.
The project Information is analyzed and discusses with project team which is saturated and
unsaturated by experts and save in folders. The important data is secure in the project
confidential file for use in future and safe from any misuses. The data management is
classification of the data by arrangement and importance with periods of storage of information.
The data is in unstructured and in formatted is daily collection for the discipline is for short
period. The data is in saturated form is more confidential and important for the project and
project records.
Cost and benefits analysis
Information of the project and their confidential data is analyzed and decided the cost of project
specific. Cost of the project is depending on the sponsors and directors. The project cost is
decided the opportunities of product in promotion and market supply. The Quality of product is
also decided by the cost and then depends on market value and benefits.
Management
Management of the project reflects the work style and duration with cost spend on the project.
The project management involves the all sectors of project and task is like project cost, staff, and
work style, procedure and project persons. The project management is key indicator of project
success. There is leadership have communication skill to promote the task in team and produces
good results ( Kuster, et. al., 2015).
7
effect is also provided by stakeholders. They are the person or group who has knowledge about
the particular products. The stake holder has experience of mostly issues which are disturbed the
project. They are also source of information about material, relative services, market effectively,
and people issues and benefits. The criteria of the promotion of product are also involved in the
stake holder information’s. Previously did project have data of stakeholders and their contact for
more informations involving about search in market may be accessed.
Data analysis
The data of the project is collection form the various sources and analyzed. The data handling is
involved the step wise tasks for the data management and isolated project benefit Information.
The project Information is analyzed and discusses with project team which is saturated and
unsaturated by experts and save in folders. The important data is secure in the project
confidential file for use in future and safe from any misuses. The data management is
classification of the data by arrangement and importance with periods of storage of information.
The data is in unstructured and in formatted is daily collection for the discipline is for short
period. The data is in saturated form is more confidential and important for the project and
project records.
Cost and benefits analysis
Information of the project and their confidential data is analyzed and decided the cost of project
specific. Cost of the project is depending on the sponsors and directors. The project cost is
decided the opportunities of product in promotion and market supply. The Quality of product is
also decided by the cost and then depends on market value and benefits.
Management
Management of the project reflects the work style and duration with cost spend on the project.
The project management involves the all sectors of project and task is like project cost, staff, and
work style, procedure and project persons. The project management is key indicator of project
success. There is leadership have communication skill to promote the task in team and produces
good results ( Kuster, et. al., 2015).
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Risk analysis
The software development companies are having security problems in initiation. The project of
the security information in software is analyzed risk and their mitigation and preparedness. The
identify the issues are conflicted of project. The issues are involving cost, budget, team ,
leadership, market research, government issues, task management with team, execution of
work , risk identifications, mitigation of risks and market problems, promotion and budget ,
maintains the profits. and policy and programming software. The risk is identified in the fields
and prepares about the risk mitigation already and plan for task alternatives and small products
by the launch and cost earn for maintain budget and extra costing.
B) Project Structure
In order to improve the structure of organization is divided into post according to responsibility
sincerely. The man power of the software company have their own guideline and privacy policy
for working which provide long term time spend in company as experience.
In order to improve, you should give more thought to project structure and provide more details
and justification of how you would organize the project team, the project team have one project
manager and team of executives for software development, market analyst and business analyst
and some additional work, According to the work organizational system is authorized by director
or manager where in project have manager on higher authority and coordinator.
Project sponsors or process owner, who committed with the theme of project using and
manufacturing aspects, Project office includes User team leader who indulge by requirements of
public and view of public comfort for use software. Applications team leader who is manage the
responsibilities of task done by other members in technically. The staff of project involves with
temporary team also like students, training students, part time staff, and empaneled staff. They
only do their acknowledged work and information provided to company. The manager must have
skill of communications and leadership. He also helps staff to overcome from problems and not
involved them unnecessary personally for business attitude. Performance status is clear time to
time which is also important for risk assessment.
8
The software development companies are having security problems in initiation. The project of
the security information in software is analyzed risk and their mitigation and preparedness. The
identify the issues are conflicted of project. The issues are involving cost, budget, team ,
leadership, market research, government issues, task management with team, execution of
work , risk identifications, mitigation of risks and market problems, promotion and budget ,
maintains the profits. and policy and programming software. The risk is identified in the fields
and prepares about the risk mitigation already and plan for task alternatives and small products
by the launch and cost earn for maintain budget and extra costing.
B) Project Structure
In order to improve the structure of organization is divided into post according to responsibility
sincerely. The man power of the software company have their own guideline and privacy policy
for working which provide long term time spend in company as experience.
In order to improve, you should give more thought to project structure and provide more details
and justification of how you would organize the project team, the project team have one project
manager and team of executives for software development, market analyst and business analyst
and some additional work, According to the work organizational system is authorized by director
or manager where in project have manager on higher authority and coordinator.
Project sponsors or process owner, who committed with the theme of project using and
manufacturing aspects, Project office includes User team leader who indulge by requirements of
public and view of public comfort for use software. Applications team leader who is manage the
responsibilities of task done by other members in technically. The staff of project involves with
temporary team also like students, training students, part time staff, and empaneled staff. They
only do their acknowledged work and information provided to company. The manager must have
skill of communications and leadership. He also helps staff to overcome from problems and not
involved them unnecessary personally for business attitude. Performance status is clear time to
time which is also important for risk assessment.
8

C) Project Lifecycle Methodology
The assignment calls you to describe the project lifecycles and methodologies to assist you in the
case study project. There is no clear information or decision in you report in this regard.
In order to improve, you need to focus on the methodologies that are useful in the specific TGV
case study project and you should justify your choice ( Kuster, et. al., 2015).
This figure indicates the various stages of project process. The project processing involves
initiation of project in which developing of business, identification of scope and stake holders,
then planning of project involves work flow, gathering resources, estimating budget, execution
of project is involving team members, monitoring quality of work and managing budget and
closure of project by the analysis and results of the project task and team performance.
9
The assignment calls you to describe the project lifecycles and methodologies to assist you in the
case study project. There is no clear information or decision in you report in this regard.
In order to improve, you need to focus on the methodologies that are useful in the specific TGV
case study project and you should justify your choice ( Kuster, et. al., 2015).
This figure indicates the various stages of project process. The project processing involves
initiation of project in which developing of business, identification of scope and stake holders,
then planning of project involves work flow, gathering resources, estimating budget, execution
of project is involving team members, monitoring quality of work and managing budget and
closure of project by the analysis and results of the project task and team performance.
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

D) Risk Management
The project is in software and information technology often risks assessment. The risks are
included data information leak, information of the technology and data collection security and
tools of company specific not to access by only employees. Computer technology is source of
quickly stolen technique of data. The data management is needed structure and unstructured. The
risk of leak data is pretended by the software of security and data handling. The data handling
management is categorized by the quality of data and quantity. The data management is
classified data in category and data structures are in the secure folder and confidential
documents. The system integrated by login and password on employee’s basis who are indulged
in the project. The confidential information is permitted to access only authorized persons. This
practice is might be decreases the probabilities of data leak. The innovation of the new software
and their features are involved many people ideas and comforts in recommendation. The people
are participated in the survey of features and difficulties on time of software operation. The
survey is given Information’s about the innovation and relative issue solution which takes place
in research of new software development. The advance and business intelligence software is
researched by the company. Their promotion is included in the social sites and website in
attracting way for market collection. The attraction of the product is also more promotional by
discount, offers, and buys one get one free offers for public.
10
The project is in software and information technology often risks assessment. The risks are
included data information leak, information of the technology and data collection security and
tools of company specific not to access by only employees. Computer technology is source of
quickly stolen technique of data. The data management is needed structure and unstructured. The
risk of leak data is pretended by the software of security and data handling. The data handling
management is categorized by the quality of data and quantity. The data management is
classified data in category and data structures are in the secure folder and confidential
documents. The system integrated by login and password on employee’s basis who are indulged
in the project. The confidential information is permitted to access only authorized persons. This
practice is might be decreases the probabilities of data leak. The innovation of the new software
and their features are involved many people ideas and comforts in recommendation. The people
are participated in the survey of features and difficulties on time of software operation. The
survey is given Information’s about the innovation and relative issue solution which takes place
in research of new software development. The advance and business intelligence software is
researched by the company. Their promotion is included in the social sites and website in
attracting way for market collection. The attraction of the product is also more promotional by
discount, offers, and buys one get one free offers for public.
10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Task 2
Project Plan
There is demonstration of the project task and their planning is necessary to development of
work breakdown structures. It is type of management strategy for task in terms of points and
their outcomes are achieving in the limited period. In order to improve, create a project plan for a
part of the case study project and demonstrate that you can use a range of planning tools.
Developmental stages of the project management are involving in the Work breakdown
structure. Work breakdown structure is response in it: Estimation of the cost, Establish and
promote the dependencies, statement of the work, responsibilities and progress of task in stats
and identify the risk. There are functional tools are plan, manage, and evaluation of project.
Manageable and reasonably evaluate and assign to teams are performing better task in period of
completion (Kuster, et. al., 2015).
The work is assessing by the team and their responsibilities. The work is in list with their
completion of time. The number of team member should be calculated with work done in certain
hours. The package specific tasks are schedule and hire temporary team for process the work and
limited time period of finish. The time period is followed by the management and technology (
Gordon, et. al., 2013).
The technology is important in the project for regulation and effectiveness. The efficient work is
done by technology and tools in the software development. The development of the project
business is promoted by the business advertising of features and comfortable accessing. The
project is needed technology for discipline, employee’s management, data analysis, information
searching, data handling, safety and security, communications by technology in tele and internet
etc. The promotional activities are by internet help and communication on the social sites with
attractive dashboard and simplified features for public comfort.
Work Breakdown Structure
The structure of the project is defining task in certain number of team members with their
responsibilities and given task periods. The status of work completion is controlled and manager
11
Project Plan
There is demonstration of the project task and their planning is necessary to development of
work breakdown structures. It is type of management strategy for task in terms of points and
their outcomes are achieving in the limited period. In order to improve, create a project plan for a
part of the case study project and demonstrate that you can use a range of planning tools.
Developmental stages of the project management are involving in the Work breakdown
structure. Work breakdown structure is response in it: Estimation of the cost, Establish and
promote the dependencies, statement of the work, responsibilities and progress of task in stats
and identify the risk. There are functional tools are plan, manage, and evaluation of project.
Manageable and reasonably evaluate and assign to teams are performing better task in period of
completion (Kuster, et. al., 2015).
The work is assessing by the team and their responsibilities. The work is in list with their
completion of time. The number of team member should be calculated with work done in certain
hours. The package specific tasks are schedule and hire temporary team for process the work and
limited time period of finish. The time period is followed by the management and technology (
Gordon, et. al., 2013).
The technology is important in the project for regulation and effectiveness. The efficient work is
done by technology and tools in the software development. The development of the project
business is promoted by the business advertising of features and comfortable accessing. The
project is needed technology for discipline, employee’s management, data analysis, information
searching, data handling, safety and security, communications by technology in tele and internet
etc. The promotional activities are by internet help and communication on the social sites with
attractive dashboard and simplified features for public comfort.
Work Breakdown Structure
The structure of the project is defining task in certain number of team members with their
responsibilities and given task periods. The status of work completion is controlled and manager
11

should have help and suggest for come out from the problems in project. The information and
knowledge of the new ideas are in good circulation is key for management and communication
for completing in regular task.
Structure of the project work breakdown is like :
S.no. Activitiy Number of days
1 Identification of the project title One week
2 Market research of requirements Two week
3 Planning One week
4 Team engaged One week
5 Execution of work Three week
6 Monitoring One week
7 Assessment and result with closure Two week
The tableof work breakdown structure is involve the step wise works of project in software
development and execute with their resulting closure in minimal time taking in period.
Task management is essential for the project. The project is indemnified task and distributed
according to capacity of team. The identify work which has time limit and manpower capacity
with resources.
12
knowledge of the new ideas are in good circulation is key for management and communication
for completing in regular task.
Structure of the project work breakdown is like :
S.no. Activitiy Number of days
1 Identification of the project title One week
2 Market research of requirements Two week
3 Planning One week
4 Team engaged One week
5 Execution of work Three week
6 Monitoring One week
7 Assessment and result with closure Two week
The tableof work breakdown structure is involve the step wise works of project in software
development and execute with their resulting closure in minimal time taking in period.
Task management is essential for the project. The project is indemnified task and distributed
according to capacity of team. The identify work which has time limit and manpower capacity
with resources.
12
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 20
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2026 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.