MULTI STOREY
CAR PARKING
Risk Assessment
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
RISK IDENTIFICATION
Risk needs to be identified at
the early stage so that it
becomes easy to mitigate the
challenges.
With the help of risk
identification knowledge as this
helps in developing a project
with good communication
process.
Document Page
RISKS IDENTIFIED IN THE
PROJECT
Risk 1- Budget shortfall
Risk 2- Schedule slippage
Risk 3- Lack of experience among the team members
Risk 4- Scope creep
Risk 5- Improper quality of materials
Risk 6- Ineffective health and safety measures for
workers
Risk 7- Neglecting the blueprint
Risk 8- Changes of requirements
Risk 9- Technical risks
Risk 10- Lack of communication among the team
members
Document Page
RISK ANALYSIS
The risk analysis is mainly performed for
the purpose of analyzing the key risks that
are likely to hamper the performance of
the project.
Risk 1- Budget shortfall: Budget shortfall is
the risk that can occur when the
development cost for the project outruns
the cost estimated at the starting of the
project.
Risk 2- Schedule slippage- Schedule
slippage is referred to the term that is
used for the purpose of explaining the risk
that arises when the team fails to meet
the deadline.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
RISK ANALYSIS
Risk 3- Lack of experience among the team members- While carrying out a
project there is a huge need to ensure that efficient and dedicated
members are being allocated towards a project.
Risk 4- Scope creep: The scope is being decided at the early stage of the
project execution and thus it is essential to ensure that the project has
been executed based on the desired scope.
Document Page
RISK ANALYSIS
Risk 5- Improper quality of materials: The quality of the materials are
considered as an essential element for executing a project successfully.
Risk 6- Ineffective health and safety measures for workers: one of the most
important aspect that needs to be taken care of while carrying out any
project is to offer better health and safety features towards the workers.
Document Page
RISK ANALYSIS
Risk 7- Neglecting the blueprint- the blueprint is designed and approved by
committee members.
Risk 8- Changes of requirements: sudden change in the project has the
potential to hamper the project performance.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
RISK ANALYSIS
Risk 9- Technical risks- The design of multi storey car parking includes
implementation of LCD, sensors and other technical equipment.
Risk 10- Lack of communication among the team members- Without proper
communication among the team members it becomes difficult to carry out
the project successfully.
Document Page
RISK ASSESSMENT
Risks Likelihood Impact
Budget shortfall High (5) Medium (4)
Schedule slippage Medium (4) Possible (3)
Lack of experience among the team
members
Low (2) Medium (4)
Scope creep Medium (4) Possible (2)
Improper quality of materials High (5) High (4)
Ineffective health and safety measures for
workers
Medium (3) Possible (3)
Neglecting the blueprint Low (2) Possible (3)
Changes of requirements Low (2) Possible (2)
Technical risks High ((5) High (4)
Lack of communication among the team
members
High (5) High (5)
Document Page
RISK MITIGATION PLAN
Accept the risk
Avoid
Control
Transfer
Monitor
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
MITIGATION STRATEGY
The team leader should ensure that the project has been executed
successfully by following the project budget.
Before appointing any team member for carrying out the complex design of
multi storey car parking area it is essential to check their experience and
the potential to manage the performance.
Communication process needs to be improved.
Document Page
REFERENCES
Hajmohammad, S. and Vachon, S., 2016. Mitigation, avoidance, or
acceptance? Managing supplier sustainability risk. Journal of Supply Chain
Management, 52(2), pp.48-65.
Kerzner, H., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Kliem, R.L. and Ludin, I.S., 2019. Reducing project risk. Routledge.
Document Page
chevron_up_icon
1 out of 13
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]