Running head: NETWORK PROJECT MANAGEMENT
Network Project Management
Name of the Student
Name of the University
Author Note:

NETWORK PROJECT MANAGEMENT1
Table of Contents
Section 1: Review of a Project Proposal..........................................................................................2
Scope Management......................................................................................................................2
Risk Identification.......................................................................................................................2
Prevention....................................................................................................................................3
Stakeholder Management............................................................................................................3
Section 2: PMI Ethics......................................................................................................................5
Executive Summary.........................................................................................................................5
Introduction..................................................................................................................................6
Ethical Analysis of Case Study....................................................................................................6
Recommendation.........................................................................................................................8
Conclusion...................................................................................................................................8
References......................................................................................................................................10

NETWORK PROJECT MANAGEMENT2
Section 1: Review of a Project Proposal
Scope Management
Wilmont can be considered to be a top-rank retail pharmacy that has more than 8,000
stores on global platform [1]. The organization is planning to deliver the description by making
use of flying drone system. The main scope of this project is
By the help of DroneTech, Wilmont focus on providing drone technology along with
drone piloting and delivery system [4].
The customization of system and required business process will ultimately help in
confirming the requirement of Wilmont’s.
Wilmont’s has provided concerning expenditure of the project for a maximum value that
is around 1, 750, 000 dollars which are needed for prototype project [3].
The first customer delivery flight will take place on 30 November.
Risk Identification
There are large number of risk associated with respect to drone delivery system in
Wilmont’s like
Last Mile: One of the biggest challenges that is being encountered in drone delivery is
proper deliver only [4]. The user needs to have an idea concerning drone and its destination. The
proper drone delivery system is all about understanding with respect to drone deliveries which is
known to be accident.
Legal Issues: One of the biggest issues that is being encountered in the drone delivery
system is all about having an understanding concerning privacy [2]. Drone delivery network is
mainly needed understanding the list of thing that being taking place.

NETWORK PROJECT MANAGEMENT3
Drone Traffic Control and Regulation: One of the biggest challenges that is being
encountered is drone delivery system is its regulation. At present, BVLOS flight are taking place
by the help of commercial partners [2]. Any kind of change of air traffic control can result in
mainstream of drone delivery system.
Prevention
DroneTech needs to focus certain point by which certain areas issues in drone delivery
system can be tackled like
For better real time access, drone delivery system needs to make use of cloud
connectivity instead of 4G/LTE for having real-time flight [1]. It tends to provide proper
control which is available even on remote location.
The drone delivery system needs to make use of intelligent flight planning [4]. This
particular step should be taken where drone can easily carve their path.
DroneTech should make use of web based dashboard where the fleet of the drone can be
controlled.
Drone delivery system should make use of triggers by which the precise landing and
delivery of drones are possible.
Stakeholder Management
This particular drone delivery project at Wilmont’s pharmacy can be successful when all
of its objectives are met exceeding the overall expectation of the stakeholders [2]. There are
stakeholders who involved in understanding the interest of all the success of the project. At
present, there are people who are actively involved in the project. The key project stakeholders
of this drone delivery project are

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Principals of Project Management
|9
|1448
|81

Implementation of Drone Prototype Project - Assignment
|16
|3725
|63

Project Management Principles
|9
|1313
|26

Ethical Issues and Its Analysis
|8
|1833
|20

Implementation of Technology in Business: Application of Drone Delivery for Managing Logistics in Organization
|15
|1090
|224

An Interface to Monitor Road Traffic Control System
|10
|1811
|42