Network Technology and Management for Color Ability Corporation
Verified
Added on  2023/06/03
|26
|4368
|434
AI Summary
This report discusses the network design and implementation for Color Ability Corporation's new premises. It covers the type of servers and network devices to be used, sharing of resources, and meeting the organization's objectives.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Network technology and management Student Name Student Id Institution Tuesday, October 16, 2018 1|P a g e
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Executive Summary Color Ability Corporation is one of the known companies for advertising and marketing in Australia. The current space of Color Ability Corporation (CAC) for operation is not entirely enough at level 10 and level 11 towers in Brisbane Central Business District and thus due to their experience in advertising and marketing and having many new customers there is need for them to enlarge their current space and go somewhere else where they will operate freely. This report has majored on highlighting the way the network will be analyzed, designed and implemented on the new premises. The report has based its arguments on the type of servers to be used, the type of network devices to be used by the employees ranging from personal computers to printers and the way such devices will be used in sharing resources across the entire network in the organization. 2|P a g e
Table of Contents Executive Summary.....................................................................................................................................2 Introduction.................................................................................................................................................5 Statement of the Problem...........................................................................................................................5 CAC Objectives............................................................................................................................................5 Methodology...............................................................................................................................................6 Project Schedule..........................................................................................................................................6 Activity One.................................................................................................................................................7 Activity Two...............................................................................................................................................10 Activity Three............................................................................................................................................11 Activity Four..............................................................................................................................................15 Activity Five...............................................................................................................................................16 Application Management....................................................................................................................17 Email Services......................................................................................................................................17 File Storage..........................................................................................................................................17 Internet Protocol Allocation...............................................................................................................17 Activity Six.................................................................................................................................................17 Activity Seven............................................................................................................................................19 Activity Eight..............................................................................................................................................20 Budget Summary.......................................................................................................................................20 Future Plans...............................................................................................................................................21 Conclusions................................................................................................................................................21 List of References......................................................................................................................................22 Appendix A. Subnet Calculations...............................................................................................................23 3|P a g e
Content of tables and Figures Figure 1 Timeline schedule.........................................................................................................................6 Figure 2 KyoceraTASKalfa 8052ci...........................................................................................................10 Figure 3 Kyocera ECOSYS M8124cidn....................................................................................................11 Figure 4 Cisco Network Convergence System 5500 Series.......................................................................12 Figure 5 Cisco Switch MS225-48..............................................................................................................12 Figure 6: Cisco Small Business 100 Series Wireless Access Points..........................................................13 Figure 7 Backup Server..............................................................................................................................14 Figure 8 Three Layered Hierarchical Layer.................................................................................................14 Figure 9 sample of a network topology Diagram.......................................................................................15 Figure 10 ISP providers..............................................................................................................................16 Figure 11 Form of Network Planning........................................................................................................18 Figure 12 Network subnet.........................................................................................................................19 Figure 13 Internet Protocol Addressing table............................................................................................19 Figure 14 Budget summary.......................................................................................................................20 Table 1 Project schedule timeline................................................................................................................7 Table 2 Graphic production specifications..................................................................................................7 Table 3 film production minimum specifications and recommendations.....................................................8 Table 4 Data Center with mail and the File Transfer protocol Servers........................................................9 4|P a g e
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Introduction. The overall performance of an organization or a company can be enhanced by increasing its productivity by having quality network designs which works together the network devices which are of high quality and thus benefiting the organizations in so many ways(Merisa, 2017).The selectedtopologyofthenetworkwillhighlyaffecttheavailability,reliabilityandthe performance of the network and thus if the selected topology is not the appropriate one to be used for implementation then we may expect to have a network that will fail in ensuring that network is well distributed and that the two features reliability and availability are well met in all ways(Bird, 2010). The current space of Color Ability Corporation (CAC) for operation is not entirely enough at level 10 and level 11 towers in Brisbane Central Business District and thus due to their experience in advertising and marketing and having many new customers there is need for them to enlarge their current space and go somewhere else where they will operate freely. Statement of the Problem The problem statement that need to be solved in this report is that CAC is moving to a new office in Brisbane which has a four floors and it is located in Brisbane Suburbs. There are some tasks that will be associated with the migration of the company to the new premises such as the design and implementation of the network infrastructure and how it will serve the entire organization without problems and meeting all their objectives. CAC Objectives The following are some of the major objectives that the IT specialist will be required to achieve for the smooth running of the organization when it comes to sharing of data and resources transmissions. 1.Anetworkinfrastructurethatistobeproposedshouldenabletheemployeeto communicate effectively. 2.The proposed computer system should be used by all. 3.There will be need to buy at least three printers. 5|P a g e
4.Networking devices to be purchased should be only used in implementation of the network proposed. Methodology When a system is laid down one will ensure that the project is a success whereby one can divide the project in to different modules just like it is done in the Software Development Life Cycle (SDLC). Project Schedule. Figure1Timeline schedule PhasesActivitystartdate (2018) DurationActivityEnd Date(2018) Feasibility study10thOctober312thOctober Project planning13thOctober1022ndOctober Project Design23rdOctober101stNovember Implementation2ndNovember2526thNovember Project Testing27thNovember52ndNovember System Documentation3rdNovember54thNovember System Installation and Customization 5thNovember27thNovember Table1Project schedule timeline 6|P a g e
Activity One Graphic device used in Graphic Production department Sydney and Brisbane Cities The component involvedMinimum specifications and Recommendations Processor of the systemIntel of about 3-4.0 GHz with an Expandable Turbo Memory capacity32 GB RAM which has expansion slot of up to 64GB Hard disk Drives2TB HDD which could be SATA SAN DISK. Compact Disk-ROM/Digital Video DiskDVD Recordable/Writable 24x The USB Ports8-18 ports, front-10, back-8 Video CardNVidia 950G with up to 8GB Sound CardSTX III ASUS essence Internal and External ModemInternal modem 10000 bps Operating System to be usedMicrosoft Windows 8 to 10 professional ScreensSize-33 inches, Resolution-8K, rate of refreshing of up to 120 Hz PrinterKyocera Taskalfa 8052ci SpeakersDell External Speakers Internet Connection 100-1000 Base-T Ethernet with up to 10G switch supplying the network all over. Table2Graphic production specifications 7|P a g e
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Graphic device used in Film Production department Sydney and Brisbane Cities The component involvedMinimum specifications and Recommendations ProcessorCore i7 of 8thGeneration with up to 3.8 GHz Memory capacity16GB RAM of DDR4 Hard disk Drives1TB HDD which could be SATA SAN DISK. Compact Disk-ROM/Digital Video DiskDVD Recordable/Writable 24x The USB Ports8 ports, front-4, back-4 Video CardNVidia 720 G with 4GB memory Operating SystemMicrosoft Windows 10 professional of 64bits ScreensSize-24-33 inches, Resolution-8K, rate of refreshing of up to 120 Hz SpeakersExternal Speakers model HP 752701. Internet Connection 100-1000 Base-T Ethernet with up to 10G switch supplying the network all over. Table3film production minimum specifications and recommendations 8|P a g e
Graphic device used in data center department Sydney and Brisbane Cities Thecomponent involvedMinimum specifications and Recommendations Processor Core i5 to core i7 of 7thGen to 8thGeneration with a processor speed of up to 4.0GHZ if it is triggered. Memory capacity16 GB RAM Hard disk Drives10 TB HDD. Compact Disk-ROM/Digital Video DiskDVD R/W The Universal Serial Bus Ports8-12 ports, front-4, back-8 Video CardsVisionTek Radeon 7750 SFF 1GB DDR3 5M VHDCI (4x DVI-D, miniDP) Sound CardsAsus STX II Essence Internal and External ModemInternal modem and external modem ranging from 10000 to 12000 bps Operating System to be usedMicrosoft Windows 10 pro Screens24`` Resolution-8K, Refresh rate-160 Hz Printer and scanners and PhotocopiersKyocera ECOSYS M8124cidn Speakers applicationExternal Speakers model HP 752701. Internet Connection 100-1000 Base-T Ethernet with up to 10G switch supplying the network all over. Table4Data Center with mail and the File Transfer protocol Servers 9|P a g e
Activity Two In any company when it comes to printing then there is no comprimisation, as it will be done on daily basis and thus there will be need for CAC to have a multifunctional printer which will be able to perform all the specific tasks without technical issues in all manners. . The increment with number of clients working together with CAC has led them to migrate from their old office to a larger office and since they will be required to hire more people then there will be need to purchase quality and heavy duty multifunctional printers such as Kyocera Taskalfa 8052ci which is a multi-functional and multipurpose printer. Figure2KyoceraTASKalfa 8052ci Kyocera TASKalfa 8052ci is capable of doing duplex scanning and printing and at the same time it helps in improving the workflow as expected. It comes offers specifications of MFP which is 10|P a g e
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
uncompromising. It has a speed of printing of about 80 A4 or A3 per minute may it be colored or not colored. It can offer a maximum of about 7650 sheets capacity. Is has a fast performance as it is secured with an 8GB solid state drive and a Hard disk drive of about 320 Gb capacity which enables it to holds the printing speed even when one is printing high resolution images. The managers in Brisbane will need a small printer which will cater for their office needs as recommended. The printer that will boost their work is that which has the ability to print colored pages, can print, scan and at the same time do copy.Another requirements that should be available one which will allow the manager to print double sided pages and of which the quality is very high(kyocera, 2017). The printer which will best serve is Kyocera ECOSYS M8124cidn which can print up 24 pages per minute. It is highly recommendedin terms of power consumption as it saves energy and much more it ishas components which are long life which are known for providing efficiency and reliability which is unprecedented. Figure3Kyocera ECOSYS M8124cidn Activity Three 11|P a g e
Theperformance of the network will be greatly depend on the network devices kind, types and quality being used in the organization. When the devices of the network are good and of high quality there is an expectation to increase the overall performance and the business productivity. There are two major devices discussed in this concept namely the switch and the router. In this concept the company that will be selected for providing the router is Cisco which is known well for offering quality networking devices.Cisco Network Convergence System 5000 Series will be recommended to CAC to be used. This route is very intelligent in the manner that it is able to detect and filter anything which is suspicious from the traffic that gets in or go out of the network by either allowing or blocking it before it enters to the internal network(Cisco, 2016). Figure4Cisco Network Convergence System 5500 Series Cisco Meraki MS225-48 Switch should be recommended to the CAC management when network is set up. The reason for its recommendation is because it has 48 ports which have crossoverwhichareAuto-MDIXandcansupportsalltheBaseTEthernetconnections from10/100/1000 respectively(Cisco, 2018). Figure5Cisco Switch MS225-48 12|P a g e
It applies the 802.3 security standards and can be used in supporting the power over the Ethernet within its 48 ports. Another feature of this switch is that it’s may be used in supporting remote management through the dashboard of Meraki which is known for being user friendly and much more very efficient when it comes easy to use. There are other features such as dynamic host configuration protocol (DHCP), hostnames which can be applied fingerprinting, remote diagnostics and notification alerts which are done via the email and the SMS. The above feature helps in ensuring that there is high performance of the network through which the flow can control support and thus helping in the switching capacity. WAP (Wireless access points) can be used in facilitating the connection of wireless connections to the devices of the employees such as the smartphones, Laptops and tablets among others. In this case since CAC has limited resources and a constrained budget it will be recommended for them to use Cisco Business 100 series. Figure6: Cisco Small Business 100 Series Wireless Access Points Cisco Business 100 series WAP installation is very easy as the setup wizards for integrations and web based setup intuitive are already configured for you. It has a very high speed connection as it uses the security standards of about 802.11ac/n which may help in improving the range and the productivity. Backup Server. Abackup server will be required in the institution as in case there is a problem with the system in the entire network then it will not affect the backup server which could be set somewhere it is 13|P a g e
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
not easily accessible. Film and graphic department is a field that really need a lot of storage and space as each and every day they must capture and store all what they have captured. Figure7Backup Server Backup Server consists of lot of space may be 200TB which is used by the Film crews for backup. The backup may not applied immediately but it may be applied in future may be when a file misses or when there is a system failure. The backup server can only be accessed by the Admin and incase the employees will need access then the admin has to give them the rights with close supervision to what they are doing. Three-layered hierarchical design will be appropriate for this system in that it will help the devices to perform effectively. This model ensures that the network is divided in to three major layers namely 14|P a g e
Figure8Three Layered Hierarchical Layer Some of the benefits that will be associated with network design models are such as scalability, redundancy, performance, security and manageability. Distribution layer is used for aggregating the data from access layer. Core layer is responsible for the high speed which is used in switching the networks. This layer is the one that have the different switches that are used for offering high bandwidth. The following figure shows a sample of what is expected in the network topology of CAC. 15|P a g e
Figure9sample of a network topology Diagram Activity Four When a network is set, the next phase is to get the internet connection. The company has to select the best provider who will give them the best services with considering their set budgets and thus helping them in determining the performance of the overall network in terms of the speed of the network. The internet’s service provider should be in a position to help on assuring that there is high availability that there will be always minimal or at no cases of downtime experienced in the organisation with regards to the internet. ISPFeaturesCost ($) Technical Capabilities 16|P a g e
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Modem fee of $150 Activation and installation fee of $200 Broadband is unlimited 200Upon signing the Foxtel broadband and the Environment bundles one will get a stressfreeconnectionwhichhasa dedicated squad. Foxtel don't supply cable broadband. Minimum speed for watching in Foxtel is about 3.0mbps for the Standard definition andAbout7.0MbpsfortheHigh Definition. WhenvideostreamingFoxtelis unmetered. Internet speed is premium Subscriptionfee ofabout200$ whichreduces up to $0 after 3 years 90It is flexible and scalable. Vodafone commits about 99.5 % of its uptime with respectto the Customer’s service each time. There is port freedom in Vodafone unlike in Foxtel. It has a 3rdparty router which uses PPPoE. Once can be able to forward the router ports to a computer on the network. Easy to establish a wireless connection to theinternetsandthushelpingoneto optimize the WI-FI signals. Figure10ISP providers Activity Five CAC can apply some services which will help in increasing the productivity of the organisation internally. Some of the services are explained below. Application Management This is a service that uses the application server device in offering the management and centralization of the application in the administration 17|P a g e
Email Services. Thisservice uses the mail server in sending and receiving of emails in CAC Company. The idea that CAC has sales, marketing and advertising departments there is expectation of emails to be sent and received across all the departments. File Storage Thisis a service that uses the file server which has centralized storage which is used for sharing the files and ensuring all the staff having access in completing and updating the files at all times. Internet Protocol Allocation Thisis a service that uses a dynamic host configuration protocol in allocation of IP addresses to the users thus dynamically enabling them in accessing the internet and other resources used in the network. 18|P a g e
Activity Six Requirement QuestionThe Number and reason Justifying that AnyneedforWired connections? There is need of wired connections in about 200 in number shared between the two regions so that the workstations, printers and laptops used by the users can easily share resources and communicate easily.(Gorges, 2017). Arewirelessconnections required? Wireless connections will guarantee the people can connect to the network using their smartphones, laptops etc. there will be 160 connections needed for each and every Wireless Access Point. What are the recommended Wirelessstandardforthe WAP to be applied? 802.11ac is the recommended security standard as it is very stable, reliable and thus very secure. Isthereaneedfora firewall? Yes it will be needed as it will be protecting the network from the traffic attacks and any malicious(Kuipers, 2016). WillISPberequiredin connections of the internet?For providing the connections of the internet to the company. Are there any types of ISP connectivity’s? DSL connection is the recommended because of its stability, speed, and minimal downtime. Isthereneedforany internal or even an external modem? External and internal modems will be used in improving the network performance and connectivity. Are cables required? Recommended cable is Cat6e which is used for internet connections and network connections. WilltherebeneedforaYes as it will help in preventing the power surge that damages the network 19|P a g e
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
backup battery? devices which are connected to the power surge and thus this may help them in completing their work and save(Shin, 2010). Figure11Form of Network Planning Activity Seven Figure12Network subnet 20|P a g e
Figure13Internet Protocol Addressing table Activity Eight There are so many situations when the company may opt to use both the public and the private IP as it enhances the security of the network as it shields the private access of the IP from the outsiders. People will only see the public Ip when devices are connected to the internet and cannot use it to trace the private IP thus making the network more secure(Yang, 2014). This will help CAC maintain data security and ensure that they are not accessed by unauthorized users from external networks. Thus, CAC should use both private and public IPs in order to make the network more secure and prevent external attackers such as hackers from gaining access to the internal network. Budget Summary 21|P a g e
NoItemQuantityBudget ($ dollars) 1Personal Computers10014000 2GraphicsProductionPersonal computers64000 3FilmProductionPersonal Computers44500 4Servers84800 5Wireless Access points104000 5Cisco Routers33500 7Kyocera and HP Printers36000 8Cisco Switches84000 9Vodafone ISP1600 Total Estimated Cost45,400 Dollars Figure14Budget summary Future Plans The growth of CAC in the next 10 years is expected be rapid in the next five years and thus the expected network design is required to cater for the concept of flexibility that will help in allowing future extensibility and scalability. As the network will be increasing thus the proposed network design should be set in a manner where it will accommodate all the users without affecting the network infrastructure and the performance. If CAC would consider the proposed design, then it will have a benefit of extending its network in an easy way if there is need be. Conclusions 22|P a g e
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
On the basis of the justifications given and provided, it will suitable for CAC to adopt the design which has been proposed and the network infrastructure to the Brisbane New building. The performance of the network will entirely depend on the network choice, cables used and the ISP vendor. There are some several key network determinants which help in designing a quality network with good performance overall such as the reliability, Extensibility, availability and security. On the basis of the mentioned determinants the discussed and proposed network devices will help in ensuring that the requirements of CAC are met. List of References Bird, H., 2010. ICT pearson Introduction. Network components and the associated devices,3(1), pp. 12- 19. Cisco, 2016. Cisco Network Convergence System 5500 Series.[Online] Available at:https://www.cisco.com/c/en/us/products/routers/network-convergence-system-5500- series/index.html [Accessed 16 October 2018]. Cisco, 2018. Cloud scale for metro aggregation and data center networks.[Online] Available at:https://www.cisco.com/c/en/us/products/routers/network-convergence-system-5000- series/index.html [Accessed 16 october 2018]. Gorges, l., 2017. communications and Networking. Algorithms of Network survival,1(1), pp. 2-16. 23|P a g e
Kuipers, H., 2016. computer applications Journal. designing and implementing the firewall system,4(1), pp. 12-18. kyocera, 2017. ECOSYS M8124cidn.[Online] Available at:https://www.kyoceradocumentsolutions.co.za/index/products/product/ ecosysm8124cidn.html [Accessed 16 October 2018]. kyocera, 2018. TASKalfa 8052ci.[Online] Available at:https://www.kyoceradocumentsolutions.co.za/index/products/product/ taskalfa8052ci.html [Accessed 16 October 2018]. Merisa, B., 2017. Puget Systems.[Online] Available at:www.pugetsystems.com/labs/articles/Specs-Explained-Video-Card-463 [Accessed 16 October 2018]. Shin, Z., 2010. IEEE/ACM Transactions on Networking,. Cooperative Carrier Signaling: Harmonizing Coexisting WPAN and WLAN Devices.,20(3), pp. 400-429. Yang, W., 2014. Technology Analysis & Strategic Management. Technological position in alliances network.,26(6), pp. 26-29. Appendix A. Subnet Calculations Address:192.168.0.011000000.10101000.00000000 .00000000 Netmask:255.255.255.0 = 2411111111.11111111.11111111 .00000000 Wildcard:0.0.0.25500000000.00000000.00000000 .11111111 => Network:192.168.0.0/2411000000.10101000.00000000 .00000000 Broadcast: 192.168.0.25511000000.10101000.00000000 .11111111 HostMin:192.168.0.111000000.10101000.00000000 .00000001 HostMax:192.168.0.25411000000.10101000.00000000 .11111110 Hosts/Net: 254(Private Internet) Subnets Netmask:255.255.255.224 = 2711111111.11111111.11111111.111 00000 Wildcard:0.0.0.3100000000.00000000.00000000.000 11111 24|P a g e
Network:192.168.0.224/2711000000.10101000.00000000.111 00000 (Class C) Broadcast: 192.168.0.25511000000.10101000.00000000.111 11111 HostMin:192.168.0.22511000000.10101000.00000000.111 00001 HostMax:192.168.0.25411000000.10101000.00000000.111 11110 Hosts/Net: 30(Private Internet) Subnets:8 Hosts:240 26|P a g e