Running head: NETWORKING PROJECT
Networking Project
Name of the Student:
Name of the University:
Author Note
Networking Project_1
1NETWORKING PROJECT
Task 8: Hardware Evaluation
Hardware Evaluation Sheet
Evaluation Date:
Document Version
Control
Evaluated By: Dated:
General Description
of Item
Descriptons Supplier 1 Supplier 2 Supplier 3
Supplier Name Hp Lenovo Dell
Website Amazaon Amzaon Amazon
Equipment Name /
Model
Laptops HP Stream 14-
inch Laptop,
Intel Celeron
N4000
Processor, 4
GB RAM, 64
GB eMMC,
Windows 10 S
with Office
365 Personal
for one Year
Lenovo
Chromebook
C330 2-in-1
Convertible
Laptop, 11.6-
Inch HD (1366
x 768) IPS
Display,
MediaTek
MT8173C
Processor,
2017 Dell Inspiron 7000
13.3" 2-in-1 Full HD
Touchscreen Convertible
Laptop, 7th Intel Core i5-
7200u, 8GB DDR4 RAM,
256GB SSD, Backlit
Keyboard, Bluetooth, HDMI,
802.11AC, Windows 10-
Silver
Networking Project_2
2NETWORKING PROJECT
(14-cb190nr,
Gray)
4GB LPDDR3,
64 GB eMMC,
Chrome OS,
81HY0000US,
Blizzard White
Criterion / Features
Mandato
ry /
Rating
Guide
Relative
Importan
ce
Comme
nt
Scor
e
(0 to
10)
Comme
nt
Scor
e
(0 to
10)
Comment Scor
e
(0 to
10)
Cost
Cost of
the
device 10 More 7.00 Cheap 8.00 Costly 2.00
Delivery 5 Free 9.00
Not
Free 5.00 free 9.00
Efficiency 20 High 9.00
Modera
te 8.00 High
10.0
0
Maintainance 15 High 5.00 Low 8.00 low 9.00
Total 50 30 29 30
Task 9: Evaluate Methodology
The purpose of the research is to evaluate a wide range of traditional and nontraditional
methodologies. This can be used for the purpose of developing the new computerized system
Networking Project_3
3NETWORKING PROJECT
that will help in the working of company and will ensure proper way of maintaining the
documents. Moreover with the use of evaluation and requirements methodology the project
specification can be done efficiently.
Task 10: Infrastructure Implementation Plan
Network Installation Plan
Task Days Start Date Finish Date Predecessor
Network Installation for Diamond
Video rentals 41 days
6/3/2019
8:00
7/29/2019
17:00
Initiation Phase 13 days
6/3/2019
8:00
6/19/2019
17:00
Client Meeting 1 day
6/3/2019
8:00
6/3/2019
17:00
Budget Allocations 2 days
6/4/2019
8:00
6/5/2019
17:00 3
Requirement Gathering 10 days
6/6/2019
8:00
6/19/2019
17:00
Current Network Analysis 4 days
6/6/2019
8:00
6/11/2019
17:00 4
Hardware Requirement 4 days 6/12/2019 6/17/2019 6
Networking Project_4