Establishing a New Computer Lab for Technological Innovation at Dallas Park Elementary Institution
VerifiedAdded on 2023/06/05
|14
|1862
|160
AI Summary
This grant proposal aims to establish a new computer lab at Dallas Park Elementary Institution to improve technological integration and increase student utilization. The proposal includes budget planning, equipment table, implementation timetable, and performance metrics.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: DRAFTING GRANT PROPOSALS
Drafting Grant Proposals
Student’s Name
University Name
Author’s Note
Drafting Grant Proposals
Student’s Name
University Name
Author’s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
2DRAFTING GRANT PROPOSALS
Executive Summary
The committee of Technological assistance at Dallas Park intended to improve technological
integration as well as increasing student’s utilization by means of establishing new computer
lab which would consist of 25 new desktop model of computers along with internet access as
well as appropriate computer applications. The reason is that the current computer resources
are not sufficient for the increased enrolment in the schools. The general vision is that each
student in Dallas Park Elementary Foundation should be provided with excellent Technology
related information. The technological assistance committee have a conception that for the
success of the students now as well as in future, institutions should tend to grow more
professionally and consider the incorporation of technology in almost all aspects of
curriculum, rather than treating as a separate entity. Through establishment of latest computer
lab inclusive of challenging software as well as internet connectivity, the students at the
institution would improve in national level assessments and attain exemplary status in
education.
Executive Summary
The committee of Technological assistance at Dallas Park intended to improve technological
integration as well as increasing student’s utilization by means of establishing new computer
lab which would consist of 25 new desktop model of computers along with internet access as
well as appropriate computer applications. The reason is that the current computer resources
are not sufficient for the increased enrolment in the schools. The general vision is that each
student in Dallas Park Elementary Foundation should be provided with excellent Technology
related information. The technological assistance committee have a conception that for the
success of the students now as well as in future, institutions should tend to grow more
professionally and consider the incorporation of technology in almost all aspects of
curriculum, rather than treating as a separate entity. Through establishment of latest computer
lab inclusive of challenging software as well as internet connectivity, the students at the
institution would improve in national level assessments and attain exemplary status in
education.
3DRAFTING GRANT PROPOSALS
Table of Contents
1. Introduction............................................................................................................................3
2. The Grant Funding Source.....................................................................................................3
3. Justification of this project.....................................................................................................3
4. Target Population...................................................................................................................4
5. Duration of the Project...........................................................................................................4
5.1 The Implementation Timetable........................................................................................4
5.2 Equipment’s Table............................................................................................................5
6. Budget Planning.....................................................................................................................5
7. Administration of the Project.................................................................................................8
8. Personnel Support..................................................................................................................8
9. Performance metrics...............................................................................................................8
References and Bibliography...................................................................................................10
Appendix 1: System Specifications.........................................................................................11
Appendix 2: GO SOLVE word problems assembly................................................................13
Table of Contents
1. Introduction............................................................................................................................3
2. The Grant Funding Source.....................................................................................................3
3. Justification of this project.....................................................................................................3
4. Target Population...................................................................................................................4
5. Duration of the Project...........................................................................................................4
5.1 The Implementation Timetable........................................................................................4
5.2 Equipment’s Table............................................................................................................5
6. Budget Planning.....................................................................................................................5
7. Administration of the Project.................................................................................................8
8. Personnel Support..................................................................................................................8
9. Performance metrics...............................................................................................................8
References and Bibliography...................................................................................................10
Appendix 1: System Specifications.........................................................................................11
Appendix 2: GO SOLVE word problems assembly................................................................13
4DRAFTING GRANT PROPOSALS
1. Introduction
This Grant proposal undertakes an initiative to make a proposal to establish a new
computer lab in the Dallas Park Elementary institution for technological innovation at
education. As a member of the welfare and development committee of the institution, the
researcher have prepared this grants proposal defining the general outline, specific goals and
objectives of the grant. The estimated basic budget of the program have been also indicated.
This grant proposal have been primarily addressed to the Head of the Technological
assistance committee of the institution who is chief supervisor of this project also.
2. The Grant Funding Source
This Grants proposal would initiate the potential agencies to render financial access to
the organisation. The project can acquire partial funding from the Government’s Fund for the
elementary foundations. Another corporate agency, the Corning Incorporation is going to
fund the project partially, as a part of their CSR activities. This Pre-proposal for the grant
would also be helpful for convincing the investors in this project. Another agency under the
radar is Ed-Tech, which promotes education through technology. As per Barton (2017), Ed-
Tech have the experience of many district level school projects of computer set-up. This
agency would be responsible for the technological assistance in setting up the technological
fit in the institution. The primary goal of this set up is to ensure the academic achievement of
students by means of using technology in the institution. This technological enhancement in
the school would also be helpful in dissolving the digital divide and make students become
equally technologically literate.
3. Justification of this project
The institution shares the perception of the educational department of the district
which proposes the secondary schools, higher learning institutions and the community
1. Introduction
This Grant proposal undertakes an initiative to make a proposal to establish a new
computer lab in the Dallas Park Elementary institution for technological innovation at
education. As a member of the welfare and development committee of the institution, the
researcher have prepared this grants proposal defining the general outline, specific goals and
objectives of the grant. The estimated basic budget of the program have been also indicated.
This grant proposal have been primarily addressed to the Head of the Technological
assistance committee of the institution who is chief supervisor of this project also.
2. The Grant Funding Source
This Grants proposal would initiate the potential agencies to render financial access to
the organisation. The project can acquire partial funding from the Government’s Fund for the
elementary foundations. Another corporate agency, the Corning Incorporation is going to
fund the project partially, as a part of their CSR activities. This Pre-proposal for the grant
would also be helpful for convincing the investors in this project. Another agency under the
radar is Ed-Tech, which promotes education through technology. As per Barton (2017), Ed-
Tech have the experience of many district level school projects of computer set-up. This
agency would be responsible for the technological assistance in setting up the technological
fit in the institution. The primary goal of this set up is to ensure the academic achievement of
students by means of using technology in the institution. This technological enhancement in
the school would also be helpful in dissolving the digital divide and make students become
equally technologically literate.
3. Justification of this project
The institution shares the perception of the educational department of the district
which proposes the secondary schools, higher learning institutions and the community
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
5DRAFTING GRANT PROPOSALS
colleges to prepare the today’s institutions to become successful in technology-driven
business environment of tomorrow’s world. In order to ensure that students at the
Dallas Park institution are exposed to technology based instruction method and this set-up
should be readily accessible to students as well as teachers. Phenomenal growth in the district
have led to an emergent need for an extra computer lab setup at the institution. According to
the views of Hubwieser, Armoni and Giannakos (2015), students require exposure towards
inquiry based technology, internet connectivity as well as stimulating software so that the
students can readily develop research and analytical skills. A set up of an additional computer
laboratory along with internet accessibility as well as exposure to online libraries and
databases would ensure that the students receive the advantage of the technology required to
make them equipped for the future.
4. Target Population
This institution serves 976 elementary school students up to grade 6. There are 85
administrative staff including professional, para-professional as well as support staff. In the
district assessment, this institution have a higher grade rating and as an outcome the
government have selected this institution for its technological assistance funding scheme. It is
the perception of the faculty as well as the students at the institution that they can reach
exemplary standard with the projected technological support. The faculty at the institution
would also require professional development, which they would achieve through integrated
technological innovation.
5. Duration of the Project
The project would make a mock launch in 2019 and it would take 3 academic sessions
for the full implementation of the facility would occur in 2022 school year.
5.1 The Implementation Timetable
colleges to prepare the today’s institutions to become successful in technology-driven
business environment of tomorrow’s world. In order to ensure that students at the
Dallas Park institution are exposed to technology based instruction method and this set-up
should be readily accessible to students as well as teachers. Phenomenal growth in the district
have led to an emergent need for an extra computer lab setup at the institution. According to
the views of Hubwieser, Armoni and Giannakos (2015), students require exposure towards
inquiry based technology, internet connectivity as well as stimulating software so that the
students can readily develop research and analytical skills. A set up of an additional computer
laboratory along with internet accessibility as well as exposure to online libraries and
databases would ensure that the students receive the advantage of the technology required to
make them equipped for the future.
4. Target Population
This institution serves 976 elementary school students up to grade 6. There are 85
administrative staff including professional, para-professional as well as support staff. In the
district assessment, this institution have a higher grade rating and as an outcome the
government have selected this institution for its technological assistance funding scheme. It is
the perception of the faculty as well as the students at the institution that they can reach
exemplary standard with the projected technological support. The faculty at the institution
would also require professional development, which they would achieve through integrated
technological innovation.
5. Duration of the Project
The project would make a mock launch in 2019 and it would take 3 academic sessions
for the full implementation of the facility would occur in 2022 school year.
5.1 The Implementation Timetable
6DRAFTING GRANT PROPOSALS
This computer lab school project would be implemented throughout a three year time
period (2018-2021). The yearly goals are described herein:
Year 1 Purchasing PCs
Procuring Software
Provision of In lab professional up-gradation
Year 2 Updating and maintenance of the PCs
Updating the software licenses
Carrying on professional development through the
assessment of needs
Year 3 Updating and maintaining the computers
Updating the licenses of the software
Accomplishing the final stages of professional development
through assessment of needs
5.2 Equipment’s Table
1st Year Purchasing 30 Dell Desktop computers
Procuring Reading 200 software
Purchase of “GO SOLVE” Word Problems
2nd Year No other new equipment would be purchased
3rd Year NI new equipment would be procured in this year
6. Budget Planning
Timeframe Components Per Unit Price Total Cost
Year 1 30 Dell Desktop $1249.00 $37,470.00
This computer lab school project would be implemented throughout a three year time
period (2018-2021). The yearly goals are described herein:
Year 1 Purchasing PCs
Procuring Software
Provision of In lab professional up-gradation
Year 2 Updating and maintenance of the PCs
Updating the software licenses
Carrying on professional development through the
assessment of needs
Year 3 Updating and maintaining the computers
Updating the licenses of the software
Accomplishing the final stages of professional development
through assessment of needs
5.2 Equipment’s Table
1st Year Purchasing 30 Dell Desktop computers
Procuring Reading 200 software
Purchase of “GO SOLVE” Word Problems
2nd Year No other new equipment would be purchased
3rd Year NI new equipment would be procured in this year
6. Budget Planning
Timeframe Components Per Unit Price Total Cost
Year 1 30 Dell Desktop $1249.00 $37,470.00
7DRAFTING GRANT PROPOSALS
computers minimum
Intel i7 desktop
processors, 2.0 GB
memory 100 GB
Boot external Hard
Drive, 15.6 inches
monitor along with
DVD drives and
Keyboard
Reading 200
software
Site License $2000.00
“GO SOLVE” Math
Problem solving
software
Site License $2000.00
Professional up-
gradation
No additional cost:
provided by the
administration as
well as faculty
$0
Year 2 Maintenance No added Cost:
Given by the
Technological
Development board
of the district
$0
computers minimum
Intel i7 desktop
processors, 2.0 GB
memory 100 GB
Boot external Hard
Drive, 15.6 inches
monitor along with
DVD drives and
Keyboard
Reading 200
software
Site License $2000.00
“GO SOLVE” Math
Problem solving
software
Site License $2000.00
Professional up-
gradation
No additional cost:
provided by the
administration as
well as faculty
$0
Year 2 Maintenance No added Cost:
Given by the
Technological
Development board
of the district
$0
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
8DRAFTING GRANT PROPOSALS
Updating the
software and
licenses
$1200 $1200
Professional
Empowerment
No additional
charges: the faculty
and administration
board is liable to
provide this based
on assessment of
needs.
$0
Year 3 Professional Up-
gradation
No added charges:
This would
internally pr0vided
through faculty
department of
administration
$0
Maintenance No additional cost:
This would be
accomplished by the
Technological
advancement branch
of the district
$0
Software updating $ 1500 $1500
Professional up-
gradation (final)
No extra charges:
would be given by
Updating the
software and
licenses
$1200 $1200
Professional
Empowerment
No additional
charges: the faculty
and administration
board is liable to
provide this based
on assessment of
needs.
$0
Year 3 Professional Up-
gradation
No added charges:
This would
internally pr0vided
through faculty
department of
administration
$0
Maintenance No additional cost:
This would be
accomplished by the
Technological
advancement branch
of the district
$0
Software updating $ 1500 $1500
Professional up-
gradation (final)
No extra charges:
would be given by
9DRAFTING GRANT PROPOSALS
administration as
well as faculty
Total $44,170
PTA matching funds
of the institution
$10,000
Total projected
amount requested
$34,170
7. Administration of the Project
The teacher in computer lab in companion with Technology advisory committee (in
house) would be chiefly liable for the implementation as well as administration of this
project. The project Director, the head of the computer faculty department, will assure the
final budget and will look after professional development of the stakeholders as well as the
yearly progression of this grant. In the implementation program, assistance would also be
provided by the members of the advisory body like the Principal and 1 teacher of each grade.
8. Personnel Support
Personnel Support in this venture is expected out of The Technology advisory
committee, teachers at computer lab and selected members from faculty of Dallas Park. The
technological assistance committee of the district would also provide support.
9. Performance metrics
Evaluation would take place on a yearly basis. The teachers as well as the students
would fill out survey forms which would highlight areas of strength and weaknesses that
requires mention. As informed by Hubwieser et al. (2015), a district level exam would take
place every year to test the computer knowledge and skills gained by the faculty as well as
administration as
well as faculty
Total $44,170
PTA matching funds
of the institution
$10,000
Total projected
amount requested
$34,170
7. Administration of the Project
The teacher in computer lab in companion with Technology advisory committee (in
house) would be chiefly liable for the implementation as well as administration of this
project. The project Director, the head of the computer faculty department, will assure the
final budget and will look after professional development of the stakeholders as well as the
yearly progression of this grant. In the implementation program, assistance would also be
provided by the members of the advisory body like the Principal and 1 teacher of each grade.
8. Personnel Support
Personnel Support in this venture is expected out of The Technology advisory
committee, teachers at computer lab and selected members from faculty of Dallas Park. The
technological assistance committee of the district would also provide support.
9. Performance metrics
Evaluation would take place on a yearly basis. The teachers as well as the students
would fill out survey forms which would highlight areas of strength and weaknesses that
requires mention. As informed by Hubwieser et al. (2015), a district level exam would take
place every year to test the computer knowledge and skills gained by the faculty as well as
10DRAFTING GRANT PROPOSALS
the students. It is estimated that Dallas Park would achieve the status “exemplary” in the
district level test.
the students. It is estimated that Dallas Park would achieve the status “exemplary” in the
district level test.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
11DRAFTING GRANT PROPOSALS
References and Bibliography
Barton, D. (2017). Literacy: An introduction to the ecology of written language. John Wiley
& Sons.
Hubwieser, P., Armoni, M., & Giannakos, M. N. (2015). How to implement rigorous
computer science education in K-12 schools? Some answers and many
questions. ACM Transactions on Computing Education (TOCE), 15(2), 5.
Hubwieser, P., Giannakos, M. N., Berges, M., Brinda, T., Diethelm, I., Magenheim, J., ... &
Jasute, E. (2015, July). A global snapshot of computer science education in K-12
schools. In Proceedings of the 2015 ITiCSE on Working Group Reports (pp. 65-83).
ACM.
Islam, M. S., & Grönlund, Å. (2016). An international literature review of 1: 1 computing in
schools. Journal of educational change, 17(2), 191-222.
Kordaki, M., Papastergiou, M., & Psomos, P. (2016). Student perceptions in the design of a
computer card game for learning computer literacy issues: a case study. Education
and Information Technologies, 21(4), 837-862.
Repenning, A., Webb, D. C., Koh, K. H., Nickerson, H., Miller, S. B., Brand, C., ... &
Repenning, N. (2015). Scalable game design: A strategy to bring systemic computer
science education to schools through game design and simulation creation. ACM
Transactions on Computing Education (TOCE), 15(2), 11.
References and Bibliography
Barton, D. (2017). Literacy: An introduction to the ecology of written language. John Wiley
& Sons.
Hubwieser, P., Armoni, M., & Giannakos, M. N. (2015). How to implement rigorous
computer science education in K-12 schools? Some answers and many
questions. ACM Transactions on Computing Education (TOCE), 15(2), 5.
Hubwieser, P., Giannakos, M. N., Berges, M., Brinda, T., Diethelm, I., Magenheim, J., ... &
Jasute, E. (2015, July). A global snapshot of computer science education in K-12
schools. In Proceedings of the 2015 ITiCSE on Working Group Reports (pp. 65-83).
ACM.
Islam, M. S., & Grönlund, Å. (2016). An international literature review of 1: 1 computing in
schools. Journal of educational change, 17(2), 191-222.
Kordaki, M., Papastergiou, M., & Psomos, P. (2016). Student perceptions in the design of a
computer card game for learning computer literacy issues: a case study. Education
and Information Technologies, 21(4), 837-862.
Repenning, A., Webb, D. C., Koh, K. H., Nickerson, H., Miller, S. B., Brand, C., ... &
Repenning, N. (2015). Scalable game design: A strategy to bring systemic computer
science education to schools through game design and simulation creation. ACM
Transactions on Computing Education (TOCE), 15(2), 11.
12DRAFTING GRANT PROPOSALS
Appendix 1: System Specifications
Appendix 1: System Specifications
13DRAFTING GRANT PROPOSALS
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
14DRAFTING GRANT PROPOSALS
Appendix 2: GO SOLVE word problems assembly
Appendix 2: GO SOLVE word problems assembly
1 out of 14
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.