Case Study Project Management

   

Added on  2019-11-29

6 Pages970 Words150 Views
Running head: PROJECT MANAGEMENTCase study: Our language mattersName of the StudentName of the UniversityAuthor’s Note
Case Study Project Management_1
PROJECT MANAGEMENT1Table of ContentsWork package..................................................................................................................................2Work package 1: Find proper theme...........................................................................................2Bibliography................................................................................................................................5
Case Study Project Management_2
PROJECT MANAGEMENT2Work packageWork package 1: Find proper theme Project Installation of signage board in CQU campusAssociated work packageID2.1Work package nameFinding proper themeWorkpackageDescription The theme is generally selected for the project in order to installsignage board in CQU campus. The SET indigenous committeewants to promote the various indigenous languages for reflectingthe significance of the language and for creating culturalawareness by properly installing the signage board within the CQUcampus. Person authorized for thework package The project manager is the authorized personWork package team leader is found as the authorized person in thiswork package.Techniques, proceduresas well as processesassociated with workpackageI.It is identified that various types of decision-makingprocesses as well as methods are generally utilized in thisspecific work packages.II.The procedure that is utilized for collecting requirement isuse case. It is found that use cases play an important rolein gathering various types of information that areassociated with translational services.III.The technique that is applied is “MoSCoW prioritizingtechnique” Development of properinterface Interface user Interface associated withoperation as well asmaintenanceI.The idea that is associated with the operation as well asmaintenance of the project is to align the project withappropriate theme in order to promote the language and forreflecting its significance.II.Making the student quite capable of speaking the varioustypes of indigenous languageIII.Every individual must engage in the research desk so thatthe importance of the language can be analyzed properly Requirement ofmanagementconfiguration The theme that is mainly selected installing the signage boardwithin the CQU campus and it is identified that the theme is keptquite secured from other staff as well as individuals.Joint agreements Estimated budget: $2900Initiation date: 9/5/17Closure date: 9/16/17Milestone: End of printing sign board phase
Case Study Project Management_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Importance of Languages in CQU University Campus ID
|6
|904
|223

PPMP20008 Work Breakdown Structure docx.
|6
|998
|34

Project Documentation Work Package Assignment
|7
|1461
|154

Assignment | Project Management Concepts
|11
|2330
|160

WORK PACKAGE 1 WORK PACKAGE: Our Language is Important
|6
|680
|141

PPMP20008 Work Breakdown Structure and Work Package Assignment
|7
|967
|132