logo

Nuclear Rules and Regulations - Assignment

   

Added on  2021-04-21

10 Pages2259 Words68 Views
Running head: NUCLEAR RULES AND REGULATIONS COURSE 1Nuclear Rules and Regulations CourseStudent NameInstitutional Affiliation
Nuclear Rules and Regulations - Assignment_1
NUCLEAR RULES AND REGULATIONS COURSE 2Question #1 Use the NRC website for a reference and answer the following:What information is required in the environmental report required as part of a 10 CFR 50 license application?What is the driver for the NRC to conduct an environmental review (i.e., what responsibility is the NRC fulfilling by requiring applicants to submit an Environmental Report) How long is the review process expected to take?Environmental Reports The essential information required in developing the environmental report for the license application entails the reactor operators’ data. Moreover, the information on the nuclear reactors,SNM, process facilities as well as waste and medical isotopes can also be incorporated in the process. Some of the information which one need to incorporate in the environmental report include controls for the effluent, construction issuance permits, technical specifications and environmental conditions, application for the public inspection, technical and general information. NRC Drivers Furthermore, the critical driver to the environmental reviews mainly aims at depicting the imminent impacts and effects which the proposed project may cause on the environment. In fact, the vital aspects appraised in the environmental assessment include reviewing the technical elements, safety as well as the overall situation (Hamilton, 2018).The process is essential in developing the mitigation plan for curbing all the related effects which the project and the operations might cause on the environment. Additionally, the appraisal and assessment helps in attaining the relevant criteria and plan activities and regulation
Nuclear Rules and Regulations - Assignment_2
NUCLEAR RULES AND REGULATIONS COURSE 3which must be adhered to ensure that the processes adequately managed. The reviewing process does not have the set time for the overall process. However, it is expected that upon the completion of submission of all the relevant and required documents, a review and appraisal is carried out. Once, the process is completed, and all the set criteria are satisfactory, the license will be issued for the commencement of the activities and project process ("Defense Nuclear Facilities Safety Board", 2018).Question #2 What is the DNFSB? What do they do? Why was the DNFSB conceived? Pick a DOE site and investigate and summarize a recent event currently discussed in one of the monthly reports. In your opinion, is the existence of an independent organization like the DNFSB needed and why or why not?According to Defense Nuclear Facilities Safety Board (2018) DNFSB refers to the Defense Nuclear Facilities Safety Board and, essentially mandated to coordinate all the related activities at the plant with the aim of ensuring that there proper and adequate safety in the site. The DNFFSB was mainly conceived to deal with all the issues related to human healthcare and report all the viable and safety risks to the state. In essence, the mandate on the protection mainlyconsidered and taken into account with the aim of ensuring that both the workers and the overall people living within the site proximity are protected decisively. Thus, the organ functions to ensure that the overall health care of the people living within the proximity is protected from the hazardous risks which might come from the nuclear materials. Monthly summary Report
Nuclear Rules and Regulations - Assignment_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Nuclear Rules and Regulations for Northwest Medical Isotopes
|12
|3499
|95

Nuclear Rules and Regulations Course
|9
|2053
|185