Running head: PROJECT FORMULATION AND BUSINESS PLANNING
Part B
Project formulation and Business Planning: Design and construction of Office Complex for the
School of Environmental Design Technology
Name of the student:
Name of the university:
Design and construction of Office Complex for the School of Environmental Design Technology_1

1PROJECT FORMULATION AND BUSINESS PLANNING
Table of Contents
Introduction......................................................................................................................................2
1. Comprehensive summary on Design and construction of Office Complex for the School of
Environmental Design Technology.................................................................................................3
2. Methodology or methods of development used for the construction project..............................6
3. Methodology analysis................................................................................................................12
4. Result analysis...........................................................................................................................14
Conclusion.....................................................................................................................................16
References......................................................................................................................................18
Design and construction of Office Complex for the School of Environmental Design Technology_2

2PROJECT FORMULATION AND BUSINESS PLANNING
Introduction
In terms of the economic facilities the strategic crucial necessity of either construction or
development of any buildings the total potential of investment are referred to as certain attributes
that may attract all industry operators under their project rays (Simatupang & Sridharan, 2016).
While constructing an office complex for the school of design and technology, the contractors,
subcontractors and the project managers may serious challenges or issues. This is mandatory for
the project manager to design and identify the most suitable constriction methodology for the
successful completion of the office complex. A comprehensive summary on the design and
construction of an office complex for the school of design and technology is illustrated in this
paper. In addition to this, the detail of the methodology that has been followed for the successful
accomplishment of the project is also illustrated in this paper. Not only but also after analyzing
the construction methodology the generated results also demonstrated in this paper.
During the design and development of the office building project different issues or
construction level challenges are identified initially. It is the role of the developer to consider
some critical components through which this sort of issues can be minimized. In addition to this,
the accurate project formulation principle including project plan, roles of the project managers
and the considered business planning framework for the design if this office building before are
also analyzed in this paper. Based upon the mission, vision and key success strategies of the
project it is found that, the members associated to the project are requires serving serious role
play for the project. After evaluating the necessary key assumption criteria the different aspects
that may negatively impact or interrupt the success of the office complex construction project are
also being illustrated in this paper. It is expected that if all the necessary assumptions are
Design and construction of Office Complex for the School of Environmental Design Technology_3

3PROJECT FORMULATION AND BUSINESS PLANNING
properly followed by the developers then the construction project related issues will be
completely mitigated.
1. Comprehensive summary on Design and construction of Office Complex for
the School of Environmental Design Technology
Professional construction or building facility always acts as a catalyst which just not
serves the role of an engine but also provides momentum for the rating of developments. This
engine also has the ability to energize all the economic sectors successfully. According to Presa
(2017), the business activities regardless of its type such as public or private are all housed in the
structure which is known as production activities, building, medical healthcare etc. Few numbers
of people cannot just operate effectively without the indirect and direct requirement for the
housing. The building production facility is referred to as a building construction or a
developmental approach which attract the professionals from each and every field of non
professionals. Not only this but also, the housing develop employment can cut across all the
categories for the human attempt.
According to Zhang et al., (2018) materials, marketing, distribution, supply, storage all
has strong and long term success chain such as impact on the economy that is known in
commerce. The rate of total production is somewhere dependent on the salary, buying, selling
approaches and also the internal relationship between the service providers and the consumers.
The contribution from the sponsors and the commercial support from the government will help
the team members to become more familiar to their allocated job roles and responsibilities. For
the estate valuer and surveyor, it is found that more than seventy percent of the activities
delivered by the professionals can revolve around the facilities associated to the buildings.
Design and construction of Office Complex for the School of Environmental Design Technology_4

4PROJECT FORMULATION AND BUSINESS PLANNING
According to Yeom et al., (2017) in order to encourage the investment mainly for facilitating the
buildings can be seen as a step towards correct direction of success in case of this specific
construction project. The design outline or the construction blueprint of the building is the initial
phase of development. From this phase the developers should identify all the necessary
components and critical success factors. However, many construction challenges are faced by the
contractors and the sub contractors.
Therefore, proper construction methodology should be adopted by the designer and the
developers to avoid project failure. Smith (2014), stated that the rate at which the project fails,
abandoned and even collapsed each and every associate concentrate on the engineers. Moreover,
it can be said that most of the project success, failure, abandonment are lies within the efficient
project management. The construction of any building is required to be successful because their
executions are always includes substantial investment or the loss that may generate through the
failure of the construction project. As the future scopes of the project are completely dependent
on roles played by the clients therefore, proper development of economic structure is very much
crucial from the development end.
For this specific construction project the main issue that is identified is overrunning cost
and over time allocation. As much time will increase that much cost will also increase
simultaneously (Simatupang & Sridharan, 2016). In order to avoid overrunning cist and budget
at the project initiation phase the project manager should have conducted a feasibility study to
ensure that the project is successful from the business end. In order to implement the
construction project, proper control over the project changes and economic standard should have
to be considered by the construction project head.
Design and construction of Office Complex for the School of Environmental Design Technology_5

5PROJECT FORMULATION AND BUSINESS PLANNING
During the design and implementation of any building the concept on which the
construction manager should have to concentrate on include comfortable as well as inviting
ambiance, conserve energy, conserved water, reduction of construction wastages etc. At the
initial phase the building site should be analyzed accurately. The project owner should check that
whether it can provide access to the public transportation, restore habitats, filter of the storm
water runoff. Again any new building should focus on maximizing the open space for the
employees who will work for the company, facilitating proper community connectivity, reducing
the pollution associated to lights. Again the constructors should also focus on either planting
native or adaptive landscape that never needs any kind of irrigation. Apart from this, volatile
organic compounds are to be used while designing the “Office Complex for the School of
Environmental Design Technology”.
During the time of construction the HVAC system should have to be utilized for
protecting the environment from moist a harmful dust. The sources of chemical exploitation and
other pollutants should be controlled by the designers to make sure that the construction work is
going accurately. From the landfills more than 50 percent to seventy percent of construction
wastes should be diverted. After the detail analysis of the approaches it has been found that the
designers and the construction heads are require to focus of energy efficiency also to make sure
that all the aspects of building construction are properly utilized by the project managers.
In this case the building is an “Office Complex for the School of Environmental Design
Technology” therefore different technology addition is another thing that has to be approached
for making it more employees focused and attractive at the same time. For the construction
project the resources that are used are comprises of money, labours, equipments, construction
materials etc. Proper project scheduling is another important thing on which the project manager
Design and construction of Office Complex for the School of Environmental Design Technology_6

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Formulation and Business Planning for Design and Construction of Office Complex for School of Environmental Design Technology
|28
|7296
|195

Building Design and Building Science: A Comprehensive Report on Tower 42
|12
|3792
|58

Concept of System Engineering Design Assignment
|9
|2546
|352

Sustainable Construction Project 2022
|14
|2486
|23

Construction Practice and Management Assignment
|14
|4461
|467

Sustainable Technologies for Building and Infrastructure
|8
|1977
|251