Project Management for Oil Tank Renovation in Australia

   

Added on  2023-06-13

13 Pages1884 Words458 Views
 | 
 | 
 | 
Assignment
Project Management
Project Management for Oil Tank Renovation in Australia_1

Project Management
Contents
1. Introduction.........................................................................................................................2
2. Project Goal........................................................................................................................2
3. Project scope statement.......................................................................................................2
4. Problem domain:.................................................................................................................4
5. Stakeholder analysis...........................................................................................................4
6. Resource management plan................................................................................................6
7. Key deliverables.................................................................................................................7
8. Acceptance criteria.............................................................................................................7
9. Project Overview................................................................................................................7
10. Conclusion:...................................................................................................................11
11. References.....................................................................................................................11
1
Project Management for Oil Tank Renovation in Australia_2

Project Management
1. Introduction
The purpose of this paper is to solve the issues and challenges which exist with the site
location of oil tank in Australia. The sites of the oil company are geographically apart which
require renovation in the existing condition of the tanks for managing the distribution of oil
precisely to the destination point (Chang, 2015). The problem of oil leakage is the major
problem which exists with the company and becoming major hurdle in restricting growth of
the firm.
2. Project Goal
The focus of the project proposal is to resolve the issues and challenges which the company
faced in handling of the oil tankers at different location. The environmental issues also have
to settle down to preserve the ecological balance in the society. The eco-friendly project plan
should be developed to manage the operational capabilities of the enterprise. The flammable
vapours can affect the growth of the local people. The project is designed for making a
patching over the leakage point of the tanks so that no harms to the environment happen. The
goal of the project plan is to cover the area of major concern and get the solution regarding it.
The major concerns areas of the project are:
Project scheduling activities in relation with the filling of the tank situation at
different locations: It helps in resolving the problems faced by the local community
members in filling of the tank at different location.
Minimizing the environmental damage due to the release of flammable vapours from
the leakage point of the tanks: It can be done by applying patching process on the
leakage point.
Renovation of the tank by patching on the leakage points of the tank: It can be done
by applying steel patches on the leakage point.
Preparation of the project design and solution: The design of the project include
installation of the main supply valve, anchor pipes, and steel patches
3. Project scope statement
Tank Number In-scope activities Out of Scope activities
2
Project Management for Oil Tank Renovation in Australia_3

Project Management
Tank 1 Storing capacity of the tank 1
should extended to around 1
million litres capacity
2 metres square dimension
steel patching is required all
over the tank leakages point
Balancing the renovation of
the tank at height with the
inclusion of four anchors
Requirement of 4 steel
patches
Arrangement of Tank
Cleanliness program
Exterior painting of the tank
Re-painting of the tank from
inside is not required
Tank 2 Storing capacity of the tank 2
should extended to around 3
million litres capacity
3 metres square dimension
steel patching is required all
over the tank leakages point
Requirement of seven steel
patches
Balancing the renovation of
the tank at height with the
inclusion of four anchors
Re-painting of the tank from
inside is not required
3
Project Management for Oil Tank Renovation in Australia_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management Assignment Sample (Docs)
|10
|1729
|177

Fuel Oil Tank Storage and Handling
|14
|3145
|32

Assignment on Project Management Sample (Doc)
|10
|1772
|40

Project Management Project Management Project Management Project Management Project Management Project Management Project Management Name of the University Author
|10
|1786
|400

Project Management Plan for Improving Health, Safety and Environmental Condition for Storing Unleaded Petrol
|27
|3058
|209

[PDF] Construction Project Management
|10
|1987
|114