Operational and Project Management

   

Added on  2022-12-26

15 Pages3138 Words63 Views
 | 
 | 
 | 
OPERATIONAL AND
PROJECT MANAGEMENT
1
Operational and Project Management_1

Contents
Contents...........................................................................................................................................2
Introduction......................................................................................................................................3
MAIN BODY..................................................................................................................................3
Project Task 1: Planning and Critical Path Analysis Riverside Multi-Storey Car Park..............3
Project Task 2: Planning, Budgets and Optimisation Riverside NHS Practice and Walk-in
Centre...........................................................................................................................................6
Project Task 3: Resource management and smoothing Security and Surveillance Environments
CCTV.........................................................................................................................................11
CONCLUSION..............................................................................................................................14
REFERENCES..............................................................................................................................15
2
Operational and Project Management_2

Introduction
The details process or methods which are used in controlling, completing and managing useful
task as well as operations of a project is regarded as project management
(Ashraf, et. al., 2020). The report is based on a project “Riverside shopping mall” and different task
are made to complete the project. The report includes refurbishment programs and systems
which defines the process of PLC as per the requirement to complete the work on time. Three
different project tasks are discussed related with operation and planning system, budget planning
and resource management and security system installation which ease in proper
MAIN BODY
Project Task 1: Planning and Critical Path Analysis Riverside Multi-Storey Car Park
Scenarios of task: The respective scenario is related with developing of new-multi storey
car parking for the mall customer. In order to complete this project various activities, programs
are being involved which ease the refurbishment of parking in riverside mall. All there is demand
of customer for modern parking system which is the main aim behind this construction.
1. Network diagram:
One of the most crucial tool of project management which is helpful for the investigator or
the project manager in marking the actual map for the schedule of project is known as network
diagram. It is a diagram which help to convey important related with project operations as well
as crucial task and also define the method that support in reaching the main goal of project. The
respective project related to car parking a detailed study is executed wherein various activities
related with controlling and monitoring are included for better advancement. Multi-storey car
parking includes different 15 activities which are presented below:
2. Critical path and planned duration of the project
3
Operational and Project Management_3

The Path which is longest in series that is being used by the manager of project in order to
complete the work from first to last is known as critical path. All is required the proper attention
of manager to all the project activities from start to end (Awangga, Pane and Tunnisa, 2019).
The actual time period which is required to complete a project is defined as project
duration. This mainly include the total days, weeks or month whatever is the time needed to
complete the project. The proper duration of project helps in better managing of activities and
reduce any of disparities which can reduce the performance.
3. Gantt Chart
The project management tool which is helpful in aiming and assisting the chart format for plans
and schedule of project is known as Gantt chart. The main importance of this chart is that it
supports in simplifying the difficult project planning operations in a series. In the context of
multi storey parking of car the respective Gantt chart is displayed below:
4
Operational and Project Management_4