Review and Critique of Operations Management (Part 1) Project Life Cycle (Part 2)
Verified
Added on 2023/06/07
|24
|5592
|164
AI Summary
This report evaluates the implementation of operations management principles within H&M and discusses the continuous improvement philosophy and lean principles. A continuous improvement plan is recommended for H&M, including the need for staff training and creating a better work environment.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
ID Unit Number and TitleUnit 187 – Operations and Project Management TitleReview and Critique of Operations Management (Part 1) Project Life Cycle (Part 2) 0
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Content Part 1: Business Report 1. An introduction to chosen organizationp 2. An explanation of operation vs operations managementp 3.Areviewandcritiqueoftheimplementationofoperations management principles within the chosen organizationp 4. An analysis of the extent to which the operations management of the organisation in the case study meets the requirements of the organizationp 5. Discussion of continuous improvement as a philosophy and describe the Lean principlesp 6.Acontinuousimprovementplan,includingyourjustified recommendationsforimprovement,basedonyourreviewand critiqueofoperationsmanagementprincipleswithinyour organizationp 7. Conclusionp Referencesp 1
INTRODUCTION Operation management is defined as a process which will helps businesses to deal on day to day business related issues with the specific strategy. Whereas, the project management simply uses some kind of tools, skills and such techniques. The report will include the overview about the organization which is H&M. More, the report will discuss the operations and the operation management function as well. It will also include the basic principles of lean and identifies its application to the business. Furthermore, it will include the explanation on the operational management as which helps the company to properly analysis the present requirements of the operations. 1. An introduction to chosen organization H&M is the multinational brand of clothing, it is the biggest retailer. It is continuing on expanding their business into Europe and counted as the largest online retailer. It is also known as the fastest growing in fashion brand for the clothing of the children, teenagers, men and women as well. It has its biggest competition Zara, H&M relies on with the higher value of sales as well as the inexpensive cloths (Bamana, Lehoux and Cloutier, 2019). It shows that the brand is making its profits by having a proper merchandise turnover which are supplying the products as well. Aims- To improving quality of their store in next two years. To have more job availability within another year. To spread the range of the online store in upcoming years. Objectives- To producing the better quality of goods and services which are at the fair price. To offering such better and objective environment. To become a one of the best Britain's retailer which helps to satisfy the needs of the customers. 2. An explanation of operation vs operations management Definition of operations Operations defined as a process for functioning and the working activity, which simply refers to that managing some different kind of tasks as well as activities which are operated inside the company. Operation function It is basically defined as the process who are the handler of all the activities and several types of things which includes the production, manufacturing and selling of such goods and services. Operation management It is defined as a tool which use for organization, staffing, planning as well as controlling and supervisor of the particular team which are working together in the same 2
production house and maintain the process which are in relation with the other management services. Apply to the H&M with specific example Every department has its own manager likewise, operations department has its operation manager which monitors all the activities which are conducting within the organization. The business is taking a step ahead with the many new technologies which are implementation in their business and proper use for the data related problems which are helping for running the proper operational management activities. 3.Areviewandcritiqueoftheimplementationof operations management principles within the chosen organization H&M's operation department are specialized with handling such king of marketing related issues and formulate some benefits which are having a positive impact on the sales of the brand as well. The company offers the better range of products which having a proper quality and the performance as well (Bonilla and et.al., 2019). The business would know the better quality of clothing and the other products which may attract many customer base which are in a favor of the organization. There are the 10 operation management principles which are weakened by the organization but this may still make it more profitable for the business and implemented by H&M. Organization-it clearly shows that all the principles are interrelated with each other whereas, it shows a necessity to having a more consistency on to the process which are attempting by the organization for having a proper and positive outcome as well. With the operation's management H&M are specifically needs to undertake the production of which helps in the planning and controlling the proper consistency into the different type of processes. Reality-in H&M the operation manager also be focused on such issues which instead of just know about the problems and needs to be faced accordingly.' Accountability- it basically shows that the people who are working with the organization or within in the organization it will need to put the specif roles and responsibilities which should be maintained by the operation manager and increases the profitability through making every employee a part of particular duties as well. Humility-it shows that the company needs to be understands the situation and respect for the employees must be allowed which leads to avoid any kind of cost related errors as well as the trial. It refers to the both time and money as well which are simply be saved form the positive outcome in the future. Quality control-it refers to the process which are appropriate for maintain the quality related to the management which are at the place of such products and the other services which ensuring about the control over the quality as well (Chawla and et.al., 2021). It is basically involves the monitoring the facilities which are related to the raw materials and to helps in the logistics which are related to the supply chain as well. 3
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Success-for the better success it is necessary to have a most achievable operation in which it helps the customer to be more specified with their choice as well. Know the competition-it is basically optimized the operation for the important operations which are mostly happy with their products and services which are received by the customers. Causality-it shows the report which helps to identify the proper status of the reports which are properly helps to identify such problems which are related to the business and creating the issue between the work. Consumer collaboration-in the next principle it shows that the organization is more willing to understand the customer's satisfaction level which shows that it is within the organization and how it is showing to the company. 4.Ananalysisoftheextenttowhichtheoperations management of the organisation in the case study meets the requirements of the organization There are some objectives which are used in such cost reduction and in the productivity as well. To reduce the unnecessary cost of the production within some months. To increase a proper quality in the next year. To increase the business productivity within this year. Operation management helps to fulfilling the current requirement of the business It shows that the operation management always helps the businesses to fulfil its requirements related to the resources or equipments which are probably in the use of such services as well. There is a different kind of operations functions which are probably counted as the focussed factor of the business for the perfect marketing strategies (de Oliveira and et.al., 2020). When it usually helps to measure the technologies which helps to figuring out such situations and decreases the costs as well as the helps to increases such kind of productivity as well. It is specifically helps to identify that the operations' management of H&M always allows to get the basic requirements which will help such stakeholders to make and effective decision regarding the requirements and increases the better quality. It shows that the another aspect will easily help to determine such developing and selling needs of the customers in the market. There are some essential parts which helps to create a better environment through the operations' management. It shows that this management is necessary for the improvement which are having with the proper taste and preferences of the customers as well. 5. Discussion of continuous improvement as a philosophy and describe the Lean principles The continuous improvement helps to identifying many opportunities which are always helps to reducing the waste which helps in a continuity of the work as well. It is also basically known as the continuing process which are simply helps to have a proper 4
improvement in the product as well as the quality of their service as well. There are five lean principles: Identify value- it is a must needed function which helps to identify the value of the team work of the company. Mapvaluestream- it helps to visualize the correct part in which it helps to create a proper customer base. Createflow- this includes the task which are properly and systematically completing by the employees. Establishpull- it always ensures that the tasks assignments are completing on its given time. Seekconstantimprovement- it shows that there is a continuous plan in which it helps to relate with the proper management as well. Methods used in a lean production kaizen- it is called as a simple approach which used to help in a continuous improvement in which it basically shows the different type of ideas as well. Justintime- it shows that the inventory system which are in the use of the management strategy for aligning such raw materials which are ordered directly by the retailers. Kanban- it is basically as inventory control system which used to have in a just in time for tracking out the production as well as the shipments as well. Andon- It is called as a system in which it helps to alert the operators by which if they see any kind of issues or problems with their operations. H&M is using the and applying the Kaizen model which helps them in their operation management for having a proper continuous improvement in their organization (Fettermann and et.al., 2018). It basically shows to applying the for reducing such wastes and helps to enhance the productivity level which are not interrupted as well and helps for the continuous improvement as well. Stockcontrol- it is basically refers to the marketing in which it helps to know about the process for measuring the stock which are basically helps to know the exact amount of the stock left and which is going to be use in effective manner. SIXSIGMA Define-it refers to the problems which are always related to the requirements on such expectations which helps to fulfil with the customer's need as well. Measure- it is simply used to help the H&M to measures the process which helps in a collection of data. Analyse- it is basically called that such process which is using by the H&M and identify the problems. Improve- it is basically used for the elimination of such problems which are analysed. Control- this shows to correct the mistake and assure to not repeated the same. Continuous development plan 5
Kaizen- it is used by the H&M to make such improvements which helps to have more beneficialor the employees and organization as well. 6
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Pros- To improve the quality of team work.To ensure about the group who are performing their task in effective manner. Cons- It may create a difficulty sometimes.It may basically need a trained staff. Qualitycircle- it shows that the team members are working on the same task with the better quality of assignments. Pros- to promote team work.To develop better attitude in the members. Cons- Employees did not get the proper training.Management is not supportive. Benchmarking- basically helps to improve and helps to establishing such baselines in the H&M. Pros- Helps to set up the high performance level.To monitors the proper performance. Cons- Not have a proper training as well (Singh and et.al., 2021).Do not have any support from any department. TQM- it has a clear objective which are involved in the H&M's improvement. Pros- To providing the better customer satisfaction.To increasing the market which helps to increase the market image as well. Cons- Sometimes it may create a problem which decreases the customer satisfaction.It consumes more time. SCM- it counted as to know the proper process for the raw material as well as the production. Pros- To increase the revenue.Have a proper control over the costs. Cons- 7
To increase the revenue.It creates an unnecessary issue. ERP- it may create many opportunities for the increasing up the proper resource planning for having a proper profit. Pros- It has a proper management.To offer the better quality. Cons- It is not worthy some times. Not have a proper quality as well. 6. A continuous improvement plan, including your justified recommendations forimprovement,basedonyourreviewandcritiqueofoperations management principles within your organization ProsConsRecommendation Taylor's scientific management It helps to enhancing the production (Javed and et.al., 2020). It has an ability to making the quick decisions It needs a very huge capital. It may create a loss and sometimes unemployment as well. It can only be adopted by H&M which needs to improve the productivity. MasscustomizationIt starts the responsive process which are use in such productions as well. To increase the costs as per maintains the varied things (Rosin, F. and et.al., 2020). To having a difficulty into measuring the stock before time. H&M needs to train their staff for the better and effective environment at work 7. Conclusion From the above discussion, it has been concluded that operation management helps organization to achieve its aims and objectives. Furthermore, the report has been evaluated such management principles who help the business to make a proper improvement. Also, it 8
has been discussed the lean principles which helps to know the methods as well as its advantages and disadvantages. References Bamana, F., Lehoux, N. and Cloutier, C., 2019. Simulation of a construction project: assessing impact of just-in-time and lean principles.Journal of Construction Engineering and Management.145(5). p.05019005. Bonilla, M.D.R. And et.al., 2019. The interaction of Instagram followers in the fast fashion sector: The case of Hennes and Mauritz (H&M).Journal of Global Fashion Marketing.10(4). pp.342-357. Chawla, V.K. and et.al., 2021. Evaluation of green operations management by fuzzy analytical hierarchy process.Materials Today: Proceedings.38.pp.274-279. de Oliveira, F.B. and et.al., 2020. Lean principles in vertical farming: A case study.Procedia CIRP.93.pp.712-717. Fettermann, D.C. and et.al., 2018. How does Industry 4.0 contribute to operations management?.Journal of Industrial and Production Engineering.35(4). pp.255- 268. Javed, T. and et.al., 2020. The sustainability claims' impact on the consumer's green perception and behavioral intention: A case study of H&M.Advances in Management and Applied Economics.10(2). pp.1-22. Rosin, F. and et.al., 2020. Impacts of Industry 4.0 technologies on Lean principles.International Journal of Production Research.58(6). pp.1644-1661. Singh, A.K. and et.al., 2021. AstroSat mission operations management.Journal of Astrophysics and Astronomy.42(2). pp.1-7. 9
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Project Titlep An overview of the case study you have been givenp AnexplanationofeachstageofthePLCthatappliestoyour selectedproject,includingsupportingdocumentationforeach stage (e.g., business case, the project plan, cost-benefit analysis and work breakdown structure): Project initiationp Project planningp Project executionp Project closurep Analysis of the project methodologies and tools usedp ReviewandcriticallyevaluatetheeffectivenessofthePLCin application to your project using the appropriate theories models and conceptsp 11
Project Title Cooking food at workplace for employees An overview of the case study you have been given In the provided case study there is large manufacturing unit located in midlands, there are overall 1250 staff members as they willingly work for office and factory. In present situation there is no catering service as concerned to this change program is being implemented. The program drive the significant purpose related to healthy well- being of individuals. The title of project is cooking food at workplace for employees and all relevant structure and norms will be covered. An explanation of each stage of the PLC that applies to your selected project, including supporting documentation for each stage (e.g., business case, the project plan, cost- benefit analysis and work breakdown structure): Project initiation Title – Detailed description -Cooking food for all at workplace, this topic is selected and scheduled to reflect over major concern related with food service to staff members and developing various possibilities to serve them with quality range of food options. Overview –the main purpose of this study is to allocate several healthy food options for employee and restrict their movement from going out of premise and minimize the possible chances of absenteeism. Aim–thedesiredaiminthisprojectistocoverthecorporatesocial responsibility of firm by getting in touch with competent process. Significance –to get maximum amount of employee whereby 1250 working staff members are considered for this project. Impact over business practices –the business standards have majority of chance to develop an internal business environment to get influence of higher number of employee and enhance retention of employee. 12
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Duties and accountability –the role and accountability in this project is to servefairandvaluablepracticesandseekingattentiontowardsequal opportunities for employees. KeyStakeholders–employee,localcommunity,membersofboard, management etc. are stakeholders in this project (Ika and et.al., 2020). All of them have access over decision making phase and influencing others. Expected Budget –the expenses incur in this project will be calculated in budget in terms of executing real cost which is fundamental for effective practices in this project. Thus, overall expenses will be calculated in this segment and monitored as well. Milestones –there are certain milestones regarding to this project which are stated below: To undertake proficient quality of food product and services which will be served to number of employees. To restrict movement of employee from going out of premises as serving them with variety of food options. To handle balance of staff absenteeism as considering to efficacious aspects. Assumptions –the assumptions could be certain amount of changes ranging over price of product or service and it can be various kind of negative concerns. Success criteria –there are several criteria or measurements that would be covered as encouraging chance of employee absenteeism and retention rate as well. Whereas amount of employee satisfaction is measured limitation aspectthatwouldbeconsideredforfurtherimprovementcompilingwith quality standards of this project. Project planning Scope planning –in this part of project it will cover 1250 working employee and catering fruitful service as serving healthy food options to them and minimize their chances of paying attention towards going out of premises (Armenia and et.al., 2019). This will be helpful for employee retention as forming up suitable standards for them to get along with opportunities. 13
Formation of WBS (work breakdown structure) –all type of task which has been taken into consideration will be covered in this table listed below: 14 Project executionProject planningProject Closure Project initiation Detailed description Overview Aim Significance Impact over business practices Duties and accountability Key Stakeholders Expected Budget Milestones Assumptions Success criteria Scope planning Formation of WBS Project development plan Resource planning Budget plan Procurement plan Risk management Communicati on plan Quality plan Project deliverables Change request Documentatio n updates Issue log Performance data Deliverablesto the stakeholders Documentation tothe organization Cancelling supplier contracts Releasingstaff and equipment’s Informing stakeholders about closure Cooking food at workplace for employee
Project development plan– in this phase time table would be developed for completion of various task to be completed in particular duration. These activities will be elaborated in depth with the help of Gantt chart. Resource planning –for this project there are some essential planned resources that would be taken into consideration by experts in systematic manner to achieve quality of output into their practices. PerformerRoleArea of Specialism Project plannerApplicableforplanning several tasks in the project Strategic management Project initiator Implementation of project Basicstandardsofproject management Budget managerFormingbudgets accordinglytominimize expenses Financial Expert Other team membersForminguptheproject completioninsystematic order Havingsignificant knowledge of management Budget plan –All kind of expenses will be covered in the budget and these are mandatory terms which is required to conduct the project. ParticularsBudgeted fee (amount in£) Research and development90000 Fixed and planning costs60000 Procurement of experts640000 Raw material100000 Salary of chefs and other staff members550000 Miscellaneous expenses100000 Kitchen equipment’s250000 15
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Data managerial cost10000 Project managerial cost180000 TOTAL£1980000 Procurement plan –For this process vendors and raw materials will be considered throughquotationsandrelevantpoliciesformakingbetterexperienceinthis procedure (Flyvbjerg, 2021). For preparation of healthy food higher quality of chef will be hired and further their food quality will be tested accordingly. Risk management –there can be several risk barriers which might occur in this project whereas quality plan is essential that would be verbalized and some suitable precautions will be taken in order to minimize hazards. For irregularities of this project contingency plan will be executed. Communication plan – Most of the suitable communication practices will be followed in this process to facilitateproceduresofprojectmanagement.Staffmemberhasabilitytoform effective communication through digital tools. Quality plan – Food preparation will be surveilled on day to day basis to reduce negative impact to be appeared at workplace. The fundamental standards will be adopted that would drive better efficiency in preparation of food. Project execution Project deliverables – Most of tangible outcomes of project will be monitored in terms of getting actual understanding related to negative concerns with overall growth of project. Food quality will be specially considered as it is being served to staff members. Change request - Some of the changes will take place in the case when some of differentiations are carried out with the help of structure and considerations (Hair and Sarstedt, 2021). Whereas most of changes implemented with gauging of each and every policies and norms. 16
Documentation updates – The changes which take place will be covered in this phase reflecting over using fundamental documents for adapting with relevant data sources. Issue log – This will aid in maintaining record for various issues which can take place in this part and it will be assist to mitigate risk factors. Performance data – The progress of project would be assessed to build changes in systematic order. Project closure It is final stage of this whole project life cycle in which it ends with due concerns for each and every individual factor of this project. There are some effective activities which will be considered after ending of project in financial year as it is stated in brief below: Stakeholder deliverables – Dissolution of contract with suppliers Project documentation Discontinuity with various staff members and required equipment’s Procuringnecessitateinformationregardingprojectclosuretokey stakeholders of this project Post implementation assessment – All successful concerns of this project are briefly scrutinized having great assistance of gauging influential terms involved in the overall process. by the help of key performance indicators all relevant terms are used to safeguard progress of project life cycle maintaining the quality output. CASE FORMATION Project label – Goal –To accomplish better outcomes by this project as maintaining better efficiency in terms of serving food to staff members. Also, seeking attention 17
further related to employee health and safety and decreasing possibilities of absenteeism at workplace. Opportunity – There is major chance for organization to level up corporate social responsibility wants by adopting to various strategies in order to develop project management fruitful. Resources required – Equipment for food making, chef, raw materials, suppliers. Innovative concern – All items related to healthy well- being of people would be served in systematic manner as focusing over aspects for going out of premises. Gantt chart and Work breakdown structure will reflect over essential terms used in this project. Risks and benefit – Prices in higher extent for resources is major associated risk factor. Subsidies by governmental bodies can be major would benefit the project. Cost and advantage – The cost estimated for this project will revert benefits to organization in terms of reducing absenteeism and increasing employee retention. Cash flow – It will be surveilling in most effective way by finance department and they will cover essential expenses and other cost factors. Business strategy – Assessment of supreme opportunities and risk factors of this project will covered to make further improvement in positive way. Cost advantageous analysis of project life cycle – In this project overall estimated cost was£1980000, it will favor potential chances to make completion of project fruitfully (Tereso and et.al., 2019). In futuristic terms or 18
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
upcoming year several benefits seem to be occurred which will maximize employee work efficiency and productivity. The benefits and limitations of this could be: Merit – It supports for interpreting project value Easier for decision making Demerit – It is costlier process which business have to initiate Time consuming Gantt Chart - 19
20
Conclusion and recommendation – At the end of this project it can be stated that all task and activities of this project has been performed in systematic order. The only factor which needs to be improved is time as it will serve better accuracy in project and major improvements as well. Analysis of the project methodologies and tools used Project management tool – Work breakdown structure is effective tool which has been used in this project in order to elaborate task completion in detail reflecting over fundamental activities of this project. The are some merit and demerits of this tool which is been stated below: Merit – Competent for allocating task and activities into heads and subheads It enhances gauging ability for teams It clearly specifies dates for completion of task Demerit – 21
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Stubborn structure and mismanagement are major negative concerns Project leadership – Leaders of this project captured efficacious terms to motivate several members within project to increase their work ability reflecting to improved performance. On positive ide it is one of the most lucrative process which aids to get positive outcome in completion of project (Copola Azenha and et.al., 2021). Also, it reduces chance of various loss which might negatively impact over this project and organization as well. In contrastive terms, there is higher amount of pressure over team members working for the project and there could be various other errors which can interrupt efficiency. Review and critically evaluate the effectiveness of the PLC inapplicationtoyourprojectusingtheappropriate theories models and concepts Performance management – Performance managements indicates bunch of activities concerned with immense performance of task completion. Similarly, there are some ways in which common activities are performed in order as having accountability in the project. Whereas the major advantage of this would be promoting influential use of resources, forming lucrative methods to make project completion extremely well (Stanitsas and et.al., 2021). On the other hand, it can impact badly on financial outcomes and it is highly dependable on broad assumptions which creates bad image in the project. Moreover, from the above measures it can be concluded that all type of considerationsaregatheredinthisprojectlifecyclelikelytobetermedas benchmark, milestones, and targets. Whereas internal and external factors like employeeretentionandsatisfactionlevelaretakenintoconsideration.Some essential terms in this project like key performance indicators (KPIs) and corporate social responsibility (CSR) of entity reflects to the valuable proposition. Apart from that in the study key tools have been used such as Gantt Chart and word breakdown structure (WBS) that reflects to fundamental aspects and conclusive phase of overall project. The project is performed in systematic term as seeking attention to significant aspects which makes it competent. The main aim of 22
this project was having mutual understanding and essential aspect which comprises with growth and all the above are performed extremely well. References Armenia, S., and et.al., 2019. Sustainable project management: A conceptualization- orientedreviewandaframeworkproposalforfuture studies.Sustainability.11(9). p.2664. CopolaAzenha,F.,andet.al.,2021.Theroleandcharacteristicsofhybrid approaches to project management in the development of technology-based products and services.Project Management Journal.52(1). pp.90-110. Flyvbjerg,B.,2021.Toptenbehavioralbiasesinprojectmanagement:An overview.Project Management Journal.52(6). pp.531-546. Hair, J.F. and Sarstedt, M., 2021. Explanation plus prediction—The logical focus of project management research.Project Management Journal.52(4). pp.319- 322. Ika,L.A.,andet.al.,2020.Cross-learningbetweenprojectmanagementand internationaldevelopment:Analysisandresearchagenda.International Journal of Project Management.38(8). pp.548-558. Stanitsas,M.,andet.al.,2021.Integratingsustainabilityindicatorsintoproject management:Thecaseofconstructionindustry.JournalofCleaner Production.279. p.123774. Tereso,A.,andet.al.,2019.Projectmanagementpracticesinprivate organizations.Project Management Journal.50(1). pp.6-22. 23