Operations and Project Management: A Review of Marks and Spencer
VerifiedAdded on 2023/06/15
|26
|6866
|186
AI Summary
This report reviews the implementation of operations management principles within Marks and Spencer, including a critique of the principles, the extent to which they meet the organization's requirements, and a continuous improvement plan. It also includes a project management case study on on-site catering for BMW Group.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Operations and Project
Management
Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Contents
PART 1.........................................................................................................................................................3
INTRODUCTION...........................................................................................................................................3
MAIN BODY..................................................................................................................................................3
An introduction to chosen organization .................................................................................................3
Explanation of operation vs operations management.............................................................................4
A review and critique of the implementation of operations management principles within the chosen
organization.............................................................................................................................................4
The extent to which the operations management of the organsiation meets the requirements of the
organization.............................................................................................................................................6
Discussion of continuous improvement as a philosophy and the Lean principles...................................7
A continuous improvement plan, including recommendations for improvement, based on the review
and critique of operations management principles within the organization...........................................8
Prepare a Continuous improvement plan................................................................................................8
CONCLUSION.............................................................................................................................................11
REFERENCES..............................................................................................................................................12
PART 2.......................................................................................................................................................13
Project Title: “On site catering for BMW Group to provide heathy food options to the staff.”.................13
An overview of the case study you have been given.............................................................................13
Explanation of each stage of the PLC that applies to the project, including supporting documentation
for each stage .......................................................................................................................................13
Building a case ......................................................................................................................................17
Work Breakdown Structure...................................................................................................................18
Gantt Chart............................................................................................................................................19
Analysis of the project methodologies and tools used..........................................................................21
Review and critically evaluate the effectiveness of the PLC in application to your project using the
appropriate theories models and concepts...........................................................................................21
Conclusion.................................................................................................................................................22
REFERENCES..............................................................................................................................................24
PART 1.........................................................................................................................................................3
INTRODUCTION...........................................................................................................................................3
MAIN BODY..................................................................................................................................................3
An introduction to chosen organization .................................................................................................3
Explanation of operation vs operations management.............................................................................4
A review and critique of the implementation of operations management principles within the chosen
organization.............................................................................................................................................4
The extent to which the operations management of the organsiation meets the requirements of the
organization.............................................................................................................................................6
Discussion of continuous improvement as a philosophy and the Lean principles...................................7
A continuous improvement plan, including recommendations for improvement, based on the review
and critique of operations management principles within the organization...........................................8
Prepare a Continuous improvement plan................................................................................................8
CONCLUSION.............................................................................................................................................11
REFERENCES..............................................................................................................................................12
PART 2.......................................................................................................................................................13
Project Title: “On site catering for BMW Group to provide heathy food options to the staff.”.................13
An overview of the case study you have been given.............................................................................13
Explanation of each stage of the PLC that applies to the project, including supporting documentation
for each stage .......................................................................................................................................13
Building a case ......................................................................................................................................17
Work Breakdown Structure...................................................................................................................18
Gantt Chart............................................................................................................................................19
Analysis of the project methodologies and tools used..........................................................................21
Review and critically evaluate the effectiveness of the PLC in application to your project using the
appropriate theories models and concepts...........................................................................................21
Conclusion.................................................................................................................................................22
REFERENCES..............................................................................................................................................24
PART 1
INTRODUCTION
Project management can be referred to as the use of specific tools, knowledge a s well as
techniques in order to deliver something of value to the customers. It is known that each project
is different and their respective requirements are also different (Barbosa and de Ávila Rodrigues,
2020). Project management is an important aspect of any project because it ensures that every
part of the business runs smoothly. Also, there are many benefits of project management such as
there is an improvement in the level of team collaboration as the plans and goals are clearly
defined. Apart from this, it also defines the goals and ensures that all the team members are
focused on their respective jobs. Organization chosen for the respective report is Marks and
Spencer, which is a leading retailer of household as well as clothing products. The company was
founded in the year 1884 by Michael Marks and Thomas Spencer. The respective report provides
an explanation of the chosen organization, as well as the implementation of operations
management principles.
MAIN BODY
An introduction to chosen organization
Marks and Spencer is a widely known retailer that offers a wide range of high quality
clothing as well as household products to the customers. The company was founded by Michael
Marks and Thomas Spencer in the year 1884 and is headquartered in London, United Kingdom.
The company specializes in selling home products, clothing as well as food products (Barrad and
Valverde, 2020). The organization also own a variety of brands under its name such as
Autograph, Classic, Indigo etc. Marks and Spencer derives most of its sales from the United
Kingdom, although it also operates across different geographic locations across the world. The
company has been able to stay relevant as well as competitive in the market by constantly
revising as well as innovating its strategies and products. Although the company was founded
many years ago, it still has a strong social media presence across different platforms such as
Facebook, Twitter as well as Instagram. This has also helped it in attracting a greater number of
customers as well as retaining the existing ones. Operations management can be referred to as an
area of management that is concerned with designing as well as controlling the process of
INTRODUCTION
Project management can be referred to as the use of specific tools, knowledge a s well as
techniques in order to deliver something of value to the customers. It is known that each project
is different and their respective requirements are also different (Barbosa and de Ávila Rodrigues,
2020). Project management is an important aspect of any project because it ensures that every
part of the business runs smoothly. Also, there are many benefits of project management such as
there is an improvement in the level of team collaboration as the plans and goals are clearly
defined. Apart from this, it also defines the goals and ensures that all the team members are
focused on their respective jobs. Organization chosen for the respective report is Marks and
Spencer, which is a leading retailer of household as well as clothing products. The company was
founded in the year 1884 by Michael Marks and Thomas Spencer. The respective report provides
an explanation of the chosen organization, as well as the implementation of operations
management principles.
MAIN BODY
An introduction to chosen organization
Marks and Spencer is a widely known retailer that offers a wide range of high quality
clothing as well as household products to the customers. The company was founded by Michael
Marks and Thomas Spencer in the year 1884 and is headquartered in London, United Kingdom.
The company specializes in selling home products, clothing as well as food products (Barrad and
Valverde, 2020). The organization also own a variety of brands under its name such as
Autograph, Classic, Indigo etc. Marks and Spencer derives most of its sales from the United
Kingdom, although it also operates across different geographic locations across the world. The
company has been able to stay relevant as well as competitive in the market by constantly
revising as well as innovating its strategies and products. Although the company was founded
many years ago, it still has a strong social media presence across different platforms such as
Facebook, Twitter as well as Instagram. This has also helped it in attracting a greater number of
customers as well as retaining the existing ones. Operations management can be referred to as an
area of management that is concerned with designing as well as controlling the process of
production as well as redesigning the business operations. Marks and Spencer has strong
operations function which ensures that the different business processes are carried out in an
effective manner and that they are planned properly so that overall outcomes are not affected.
Explanation of operation vs operations management
Operations within an organization can be referred to as the different activities that are
undertaken by a business on a daily basis in order to increase the value of the business as well as
generate profits (Caraos, 2021). The management of the respective firm is very focused on the
operations of the firm and hence, the operations function is responsible for ensuring that the
operations strategy is achieved (Dangerfield, 2020). Apart from this, operations management is
important because it ensures that the planning as well as implementation of manufacturing plants
is done in an effective manner. It can be said that there are various benefits of operations
management such as management of different projects that are undertaken by the company. In
case of Marks and Spencer, effective implementation of operations management has helped the
company in enhancing its overall efficiency as well as the processes that are used for
manufacturing the goods as well as services. On the other hand, operations help in improving the
quality of the product and ensures that there is balanced production and that the delivery is done
on the right time.
A review and critique of the implementation of operations management principles within the
chosen organization
There are different principles of operations management and a review and critique of the
implementation of operations management principles is as follows –
Reality – This is the first principle of operations management which states that
operations management should focus on the problem instead of focusing on the techniques
(Operations Management: Definition, Principles, Activities, Trends, 2021). This is because no
tool will present solutions to all the problems.
Organization – This is the second principle of operations management which states that
different processes in manufacturing are interconnected and it is important all elements have to
be consistent and predictable (Gelot, 2021). This helps in achieving a similar outcome in profits
as well. There are various processes that are conducted by Marks and Spencer in order to ensure
that the products reach the customers on time.
operations function which ensures that the different business processes are carried out in an
effective manner and that they are planned properly so that overall outcomes are not affected.
Explanation of operation vs operations management
Operations within an organization can be referred to as the different activities that are
undertaken by a business on a daily basis in order to increase the value of the business as well as
generate profits (Caraos, 2021). The management of the respective firm is very focused on the
operations of the firm and hence, the operations function is responsible for ensuring that the
operations strategy is achieved (Dangerfield, 2020). Apart from this, operations management is
important because it ensures that the planning as well as implementation of manufacturing plants
is done in an effective manner. It can be said that there are various benefits of operations
management such as management of different projects that are undertaken by the company. In
case of Marks and Spencer, effective implementation of operations management has helped the
company in enhancing its overall efficiency as well as the processes that are used for
manufacturing the goods as well as services. On the other hand, operations help in improving the
quality of the product and ensures that there is balanced production and that the delivery is done
on the right time.
A review and critique of the implementation of operations management principles within the
chosen organization
There are different principles of operations management and a review and critique of the
implementation of operations management principles is as follows –
Reality – This is the first principle of operations management which states that
operations management should focus on the problem instead of focusing on the techniques
(Operations Management: Definition, Principles, Activities, Trends, 2021). This is because no
tool will present solutions to all the problems.
Organization – This is the second principle of operations management which states that
different processes in manufacturing are interconnected and it is important all elements have to
be consistent and predictable (Gelot, 2021). This helps in achieving a similar outcome in profits
as well. There are various processes that are conducted by Marks and Spencer in order to ensure
that the products reach the customers on time.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Accountability – The third principle of operations management states that managers
within Marks and Spencer are expected to set the rules as well as the metrics. Not only this, they
also define the responsibilities of their subordinates or team members and check that the goals
are met regularly.
Strengths of Marks and Spencer operations process
Managers of organization focuses on making process effective and ensure that information in
organization should be effectively communicated.
Limitations of Marks and Spencer operations process
Organization have to ensure that quality of products should satisfy consumer expectations and
should provide products at affordable prices. The operations management comprises of different
stages such as planning, organizing, supervising processes etc. It is important to ensure that the
different processes are conducted in an effective manner. The project manager in Marks and
Spencer oversees as well as takes into account the individual performance of the workers
(Mansourimoayyed, Colabi and Semiari, 2020). Apart from this, there are also certain limitations
of the same such as there is a multi-level dependency of the different processes on each other.
And if even one of them processes is affected, the whole operations of the company are
impacted.
Lean Production – it can be defined as an approach to management that is primarily
focused on ensuring that the wastage during the manufacturing process is eliminated while there
is no compromise on the quality. It can be said that this particular approach can be applied to the
different aspects of the business. As a result, the business becomes much more efficient and is
responsive of the market needs. Lean production is an important approach because it helps in
improving the overall efficiency as well as productivity of the business. This further leads to
improvement in the quality of the processes.
Mass Communication – Mass communication can be referred to as the process which
involves imparting as well as exchanging information with the help of mass media to a large
population (Martin, Elg and Gremyr, 2020). There are different types of mass media that can be
used for the purpose of communicating with a large audience such as newspapers, books etc.
within Marks and Spencer are expected to set the rules as well as the metrics. Not only this, they
also define the responsibilities of their subordinates or team members and check that the goals
are met regularly.
Strengths of Marks and Spencer operations process
Managers of organization focuses on making process effective and ensure that information in
organization should be effectively communicated.
Limitations of Marks and Spencer operations process
Organization have to ensure that quality of products should satisfy consumer expectations and
should provide products at affordable prices. The operations management comprises of different
stages such as planning, organizing, supervising processes etc. It is important to ensure that the
different processes are conducted in an effective manner. The project manager in Marks and
Spencer oversees as well as takes into account the individual performance of the workers
(Mansourimoayyed, Colabi and Semiari, 2020). Apart from this, there are also certain limitations
of the same such as there is a multi-level dependency of the different processes on each other.
And if even one of them processes is affected, the whole operations of the company are
impacted.
Lean Production – it can be defined as an approach to management that is primarily
focused on ensuring that the wastage during the manufacturing process is eliminated while there
is no compromise on the quality. It can be said that this particular approach can be applied to the
different aspects of the business. As a result, the business becomes much more efficient and is
responsive of the market needs. Lean production is an important approach because it helps in
improving the overall efficiency as well as productivity of the business. This further leads to
improvement in the quality of the processes.
Mass Communication – Mass communication can be referred to as the process which
involves imparting as well as exchanging information with the help of mass media to a large
population (Martin, Elg and Gremyr, 2020). There are different types of mass media that can be
used for the purpose of communicating with a large audience such as newspapers, books etc.
Agile Manufacturing – Agile manufacturing is an important aspect of the operations
management and can be referred to as a term that is used by manufacturers in order to respond to
the changing customers’ needs in the market in an effective manner. And at the same time, the
different costs are also controlled. It can be said that there are different advantages of agile
manufacturing, for instance, the respective organization, Marks and Spencer, has been able to
reduce its production costs as well as increase overall satisfaction of the customers. Therefore, it
can be said that agile manufacturing helps in increasing the overall output of the company.
Thus, it can be concluded that effective operations management helps in enhancing the
overall efficiency as well as productivity of the firm.
The extent to which the operations management of the organsiation meets the requirements of
the organization
Operations management is an important component which ensures that the
organization needs are met and hence, the goals as well as objectives are achieved. For instance,
the objectives of the respective firm, Marks and Spencer is to build a sustainable business with
the help of consistent as well as profitable growth (Park and Yi, 2021). Apart from this, the
company is also focused on acting in a responsible manner and for this, the firm has taken into
account the needs as well as preferences of the customers. Marks and Spencer has launched
sustainable products that do not cause any harm to the environment. It can be said that the
company practices corporate governance wherein the different products are marketed as well as
manufactured in such a way that there is a cost reduction and no extra amount is wasted
unnecessarily.
Besides this, the company is also focused on enhancing its overall productivity as well as
the quality of its products. In order to ensure this, the employees are provided effective training
so that they are able to put in their best efforts for the completion of the tasks that are assigned to
them. It can be said that in context to Marks and Spencer, operations management significantly
meets the requirements. This is because the operations manager takes into account the different
activities that are a part of the operations function. Not only this, they also ensure that the
products and services that are manufactured, are of high quality and deliver value to the
customers.
management and can be referred to as a term that is used by manufacturers in order to respond to
the changing customers’ needs in the market in an effective manner. And at the same time, the
different costs are also controlled. It can be said that there are different advantages of agile
manufacturing, for instance, the respective organization, Marks and Spencer, has been able to
reduce its production costs as well as increase overall satisfaction of the customers. Therefore, it
can be said that agile manufacturing helps in increasing the overall output of the company.
Thus, it can be concluded that effective operations management helps in enhancing the
overall efficiency as well as productivity of the firm.
The extent to which the operations management of the organsiation meets the requirements of
the organization
Operations management is an important component which ensures that the
organization needs are met and hence, the goals as well as objectives are achieved. For instance,
the objectives of the respective firm, Marks and Spencer is to build a sustainable business with
the help of consistent as well as profitable growth (Park and Yi, 2021). Apart from this, the
company is also focused on acting in a responsible manner and for this, the firm has taken into
account the needs as well as preferences of the customers. Marks and Spencer has launched
sustainable products that do not cause any harm to the environment. It can be said that the
company practices corporate governance wherein the different products are marketed as well as
manufactured in such a way that there is a cost reduction and no extra amount is wasted
unnecessarily.
Besides this, the company is also focused on enhancing its overall productivity as well as
the quality of its products. In order to ensure this, the employees are provided effective training
so that they are able to put in their best efforts for the completion of the tasks that are assigned to
them. It can be said that in context to Marks and Spencer, operations management significantly
meets the requirements. This is because the operations manager takes into account the different
activities that are a part of the operations function. Not only this, they also ensure that the
products and services that are manufactured, are of high quality and deliver value to the
customers.
Discussion of continuous improvement as a philosophy and the Lean principles
Continuous improvement is one of the aspects of operations management that the
respective firm, Marks and Spencer is focused on. This refers to the ongoing improvement of
products and services with the help of breakthrough improvements (Spearman and Hopp, 2021).
Also, there are different principles of lean management such as Kaizen, JIT or Just in Time,
Kanban and Andon which any organization can apply based on their system. The company has
implemented six-sigma as well as continuous improvement principles of operations
management. It can be said that six-sigma has helped the company in improving its overall
efficiency as well as productivity.
Lean principles
These principles focuses on reducing the wastage of resources during production of
products and services in an organization. This part focuses on principles which are used by
Marks and Spencer and these principles are mentioned below:
Value Defining – Marks and Spencer focuses on providing quality products to its consumers
which helps in creating value among consumers. Marks and Spencer focuses on providing
products and services according to need of consumers.
Mapping of value stream – This principle focuses on understanding various points and factors
which helps in boosting the value of business among consumers. Marks and Spencer focuses on
understanding about factors which are helpful in creating value and eliminating factors which are
not useful to them.
Creating flow – Marks and Spencer focuses on utilizing their resources, material and labor in
such a way that it helps in achieving desired goals and objectives of organization. It would also
help in managing the performance of employees and developing their skill and knowledge by
providing them appropriate training.
Pull Establishment – This principles focuses on effective management of resources which helps
Marks and Spencer in production. Organization focuses on managing its inventory effectively
and ensuring that products provided to consumers should possess good quality.
Continuous improvement is one of the aspects of operations management that the
respective firm, Marks and Spencer is focused on. This refers to the ongoing improvement of
products and services with the help of breakthrough improvements (Spearman and Hopp, 2021).
Also, there are different principles of lean management such as Kaizen, JIT or Just in Time,
Kanban and Andon which any organization can apply based on their system. The company has
implemented six-sigma as well as continuous improvement principles of operations
management. It can be said that six-sigma has helped the company in improving its overall
efficiency as well as productivity.
Lean principles
These principles focuses on reducing the wastage of resources during production of
products and services in an organization. This part focuses on principles which are used by
Marks and Spencer and these principles are mentioned below:
Value Defining – Marks and Spencer focuses on providing quality products to its consumers
which helps in creating value among consumers. Marks and Spencer focuses on providing
products and services according to need of consumers.
Mapping of value stream – This principle focuses on understanding various points and factors
which helps in boosting the value of business among consumers. Marks and Spencer focuses on
understanding about factors which are helpful in creating value and eliminating factors which are
not useful to them.
Creating flow – Marks and Spencer focuses on utilizing their resources, material and labor in
such a way that it helps in achieving desired goals and objectives of organization. It would also
help in managing the performance of employees and developing their skill and knowledge by
providing them appropriate training.
Pull Establishment – This principles focuses on effective management of resources which helps
Marks and Spencer in production. Organization focuses on managing its inventory effectively
and ensuring that products provided to consumers should possess good quality.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Organization focuses on following the standards which are set by the top management.
Marks and Spencer focuses on operating in such a way that it helps them in achieving desired
goals and objectives (Orgut and et. al., 2020). It also seems that the principles mentioned above
help organization in maintaining quality of its products and ensure that organization should
perform effectively according to expectation of consumers.
Effectiveness and efficiency of operations management at M&S
There is a greater efficiency of operations management and their relative effectiveness in
context of operational working at M&S. This can be stated that coordinated efforts can be
produced with accordance to operational working at the business firm. Following are some
elements for which effectiveness and efficiency at M&S are being benefited; Leads to success of plans: Through effectiveness of operational management at M&S,
managers of the firm are able to derive better standards of workings in the business firm
for which organizational plans can be achieved. Under this completion of business tasks
can be ensured with their relative understandings for success of desired plans within the
operational firm.
Engagement with employees: By taking effective derivative of operational management
planning at M&S, managers of the corporate firm are able to derive better engagement
with employees of the business firm. This will allow positive working attitude and better
functioning of business activities within the workforce.
A continuous improvement plan, including recommendations for improvement, based on the
review and critique of operations management principles within the organization
Continuous Improvement Plan
Benchmarking – It can be referred to as the process of measuring key business metrics
and comparing them with each other. Marks and Spencer has set a benchmark for its products as
well as services.
TQM – It can be said that Marks and Spencer is focused in improving the overall
satisfaction among its customers by constantly improving the overall quality of its products
through innovation.
Marks and Spencer focuses on operating in such a way that it helps them in achieving desired
goals and objectives (Orgut and et. al., 2020). It also seems that the principles mentioned above
help organization in maintaining quality of its products and ensure that organization should
perform effectively according to expectation of consumers.
Effectiveness and efficiency of operations management at M&S
There is a greater efficiency of operations management and their relative effectiveness in
context of operational working at M&S. This can be stated that coordinated efforts can be
produced with accordance to operational working at the business firm. Following are some
elements for which effectiveness and efficiency at M&S are being benefited; Leads to success of plans: Through effectiveness of operational management at M&S,
managers of the firm are able to derive better standards of workings in the business firm
for which organizational plans can be achieved. Under this completion of business tasks
can be ensured with their relative understandings for success of desired plans within the
operational firm.
Engagement with employees: By taking effective derivative of operational management
planning at M&S, managers of the corporate firm are able to derive better engagement
with employees of the business firm. This will allow positive working attitude and better
functioning of business activities within the workforce.
A continuous improvement plan, including recommendations for improvement, based on the
review and critique of operations management principles within the organization
Continuous Improvement Plan
Benchmarking – It can be referred to as the process of measuring key business metrics
and comparing them with each other. Marks and Spencer has set a benchmark for its products as
well as services.
TQM – It can be said that Marks and Spencer is focused in improving the overall
satisfaction among its customers by constantly improving the overall quality of its products
through innovation.
Value Engineering – It can be defined as a systematic as well as organized approach that
includes providing important functions in a project, at the lowest costs. Marks and Spencer
ensures that any kind of unwanted costs are eliminated.
Therefore, it can be said that the respective continuous improvement plan can be
implemented by Marks and Spencer to ensure that its business operations are conducted in an
effective manner and hence, improve the overall efficiency of the different business processes.
As a result, the business goals and objectives are achieved in an effective manner.
Prepare a Continuous improvement plan
Marks and Spencer should make sure that they will formulate a continuous improvement
plan. Plan should be focused on continuous improvement as it is not possible for an organization
that one time plan is accomplishing goals and objectives (Bochtis, Sorensen and Kateris, 2018).
Everyday organisation need to improve something so that they are achieving their desired results.
This is an ongoing process as Unilever believes that quality is not maintained in short time.
Important steps of continuous improvement plan are mentioned below:
Plan: This is the first step in which Unilever needs to plan that what they should change
in organisation after analysing the market trends.
Do: In this step, an organisation should implement changes in the business practices.
Check: It is necessary for an organisation that they should check the plan. That means
they need to monitor the plan in an appropriate way so that they are able to find out all
variations in the organisations due to changes.
Act: It is the activity in which an organisation takes an action in order to implement the
change.
The Kaizen Approach
This techniques is very helpful for Unilever as they can implement change for better. It is
necessary for an organisation that they need to implement continuous improvement. It has six
important steps that are mentioned in below figure.
includes providing important functions in a project, at the lowest costs. Marks and Spencer
ensures that any kind of unwanted costs are eliminated.
Therefore, it can be said that the respective continuous improvement plan can be
implemented by Marks and Spencer to ensure that its business operations are conducted in an
effective manner and hence, improve the overall efficiency of the different business processes.
As a result, the business goals and objectives are achieved in an effective manner.
Prepare a Continuous improvement plan
Marks and Spencer should make sure that they will formulate a continuous improvement
plan. Plan should be focused on continuous improvement as it is not possible for an organization
that one time plan is accomplishing goals and objectives (Bochtis, Sorensen and Kateris, 2018).
Everyday organisation need to improve something so that they are achieving their desired results.
This is an ongoing process as Unilever believes that quality is not maintained in short time.
Important steps of continuous improvement plan are mentioned below:
Plan: This is the first step in which Unilever needs to plan that what they should change
in organisation after analysing the market trends.
Do: In this step, an organisation should implement changes in the business practices.
Check: It is necessary for an organisation that they should check the plan. That means
they need to monitor the plan in an appropriate way so that they are able to find out all
variations in the organisations due to changes.
Act: It is the activity in which an organisation takes an action in order to implement the
change.
The Kaizen Approach
This techniques is very helpful for Unilever as they can implement change for better. It is
necessary for an organisation that they need to implement continuous improvement. It has six
important steps that are mentioned in below figure.
Advantage
It assists in effective teamwork and leadership style.
Disadvantage
It requires more and more training program that increase cost.
TQM
It is the other techniques or theory which is effective in order to reduce the wastage and
improve quality. Unilever can achieve their objective with the help of managing quality.
Advantage
Unilever can easily reduce their cost of production.
Disadvantage
It requires effective leadership which is necessary and if it will not then Unilever is not
able to achieve their goals and objectives.
It assists in effective teamwork and leadership style.
Disadvantage
It requires more and more training program that increase cost.
TQM
It is the other techniques or theory which is effective in order to reduce the wastage and
improve quality. Unilever can achieve their objective with the help of managing quality.
Advantage
Unilever can easily reduce their cost of production.
Disadvantage
It requires effective leadership which is necessary and if it will not then Unilever is not
able to achieve their goals and objectives.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Application of theories, concepts and models to justify strategies of a continuous improvement
plan
Taking instance of above theories and models when being applied within operational
working at M&S, it can be stated that better terms of performing actions can be derived through
use of TQM technique. Being under the technique effective basis of working in the business firm
can be developed. This will be in accordance to pulling effective quality of products and services
being produced at the workforce. Therefore, through application of theories of TQM and The
Kaizen Approach, managers at the respective firm can deliver better standards of working in the
corporate firm. For the reason being this will allow corporate firm to derive better initiatives
towards attainment of their desired objectives and goals.
plan
Taking instance of above theories and models when being applied within operational
working at M&S, it can be stated that better terms of performing actions can be derived through
use of TQM technique. Being under the technique effective basis of working in the business firm
can be developed. This will be in accordance to pulling effective quality of products and services
being produced at the workforce. Therefore, through application of theories of TQM and The
Kaizen Approach, managers at the respective firm can deliver better standards of working in the
corporate firm. For the reason being this will allow corporate firm to derive better initiatives
towards attainment of their desired objectives and goals.
CONCLUSION
From the above report, it can be concluded that project management is an important
aspect for any firm because it ensures that the different business processes are carried out in an
effective manner. Not only this, effective project management ensures that the project is
completed efficiently and that the goals as well as objectives are achieved. There are different
principles of project management such as Kaizen, Kanban, JIT etc. Different organizations
implement project management in different ways in order to improve their overall efficiency as
well as effectiveness.
From the above report, it can be concluded that project management is an important
aspect for any firm because it ensures that the different business processes are carried out in an
effective manner. Not only this, effective project management ensures that the project is
completed efficiently and that the goals as well as objectives are achieved. There are different
principles of project management such as Kaizen, Kanban, JIT etc. Different organizations
implement project management in different ways in order to improve their overall efficiency as
well as effectiveness.
REFERENCES
Books & Journals
Barbosa, M.W. and de Ávila Rodrigues, C., 2020. Project Portfolio Management teaching:
Contributions of a gamified approach. The International Journal of Management
Education, 18(2), p.100388.
Barrad, S. and Valverde, R., 2020. The Impact of e-Supply Chain Management Systems on
Procurement Operations and Cost Reduction in the Electronics Manufacturing Services
Industry. Journal of Media Management and Entrepreneurship (JMME), 2(1), pp.1-27.
Caraos, M.C., 2021. Partnership Programs of the School Governance and Operations Division in
Batangas Province. International Journal of Research in Engineering, Science and
Management, 4(7), pp.442-447.
Dangerfield, B., 2020. System Dynamics. Springer.
Gelot, L., 2021. Adapting a Governmental Training Platform to Simulate Peace Operations in the
Classroom. Journal of Political Science Education, 17(2), pp.269-284.
Mansourimoayyed, F., Colabi, A. and Semiari, M., 2020. Explaining the Competencies of
Project Managers According To PMCDF Model. International Journal of Supply and
Operations Management, 7(4), pp.322-343.
Martin, J., Elg, M. and Gremyr, I., 2020. The Many Meanings of Quality: Towards a Definition
in Support of Sustainable Operations. Total Quality Management & Business
Excellence, pp.1-14.
Park, Y.J. and Yi, C.Y., 2021. Resource-Based Quality Performance Estimation Method for
Construction Operations. Applied Sciences, 11(9), p.4122.
Spearman, M.L. and Hopp, W.J., 2021. The case for a unified science of operations. Production
and Operations Management, 30(3), pp.802-814.
Yusof, N.A., Tabassi, A.A. and Esa, M., 2020. Going beyond environmental regulations—The
influence of firm size on the effect of green practices on corporate financial
performance. Corporate social responsibility and Environmental Management, 27(1),
pp.32-42.
Online
Operations Management: Definition, Principles, Activities, Trends. 2021. [Online]. Available
through:< https://www.cleverism.com/operations-management-definition-principles-
activities-trends/ >.
Books & Journals
Barbosa, M.W. and de Ávila Rodrigues, C., 2020. Project Portfolio Management teaching:
Contributions of a gamified approach. The International Journal of Management
Education, 18(2), p.100388.
Barrad, S. and Valverde, R., 2020. The Impact of e-Supply Chain Management Systems on
Procurement Operations and Cost Reduction in the Electronics Manufacturing Services
Industry. Journal of Media Management and Entrepreneurship (JMME), 2(1), pp.1-27.
Caraos, M.C., 2021. Partnership Programs of the School Governance and Operations Division in
Batangas Province. International Journal of Research in Engineering, Science and
Management, 4(7), pp.442-447.
Dangerfield, B., 2020. System Dynamics. Springer.
Gelot, L., 2021. Adapting a Governmental Training Platform to Simulate Peace Operations in the
Classroom. Journal of Political Science Education, 17(2), pp.269-284.
Mansourimoayyed, F., Colabi, A. and Semiari, M., 2020. Explaining the Competencies of
Project Managers According To PMCDF Model. International Journal of Supply and
Operations Management, 7(4), pp.322-343.
Martin, J., Elg, M. and Gremyr, I., 2020. The Many Meanings of Quality: Towards a Definition
in Support of Sustainable Operations. Total Quality Management & Business
Excellence, pp.1-14.
Park, Y.J. and Yi, C.Y., 2021. Resource-Based Quality Performance Estimation Method for
Construction Operations. Applied Sciences, 11(9), p.4122.
Spearman, M.L. and Hopp, W.J., 2021. The case for a unified science of operations. Production
and Operations Management, 30(3), pp.802-814.
Yusof, N.A., Tabassi, A.A. and Esa, M., 2020. Going beyond environmental regulations—The
influence of firm size on the effect of green practices on corporate financial
performance. Corporate social responsibility and Environmental Management, 27(1),
pp.32-42.
Online
Operations Management: Definition, Principles, Activities, Trends. 2021. [Online]. Available
through:< https://www.cleverism.com/operations-management-definition-principles-
activities-trends/ >.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
PART 2
Project Title: “On site catering for BMW Group to provide heathy food options to the staff.”
An overview of the case study you have been given
As of now, there is no onsite catering available for the staff members of BMW Group,
which is one of the leading manufacturers of transportation equipment (Berrada, Emrani and
Ameur, 2021). The respective company is facing issues because there is a lot of movement
among the staff members from the premises during the lunch break. Due to this, there is
congestion issues within the local area. As a member of the Project and Program Office, it is the
responsibility to deliver the change program for the organization. As per the case study, the
company has two primary objectives. Firstly, the company wants to reduce the movement of the
staff from the premises during the lunch break which is currently creating congestion issues in
the local area. Apart from this, it also wants to help the staff to develop a healthy lifestyle which
the organsiation believes is part of their CSR and will also reduce staff absenteeism. Thus, the
project will focus on providing healthy food to the staff such as getting catered from somewhere,
either cooking food in-house or booking it outside at an eatery.
Explanation of each stage of the PLC that applies to the project, including supporting
documentation for each stage
Product lifecycle management refers to the process of handling a good as it moves
through the different stages such as development and introduction, growth, maturity as well as
decline (Ham, Kim and Kim, 2020). There are many benefits of product lifecycle management
such as it ensures that the product reaches the customers faster and any additional costs are
eliminated. The project lifecycle for the respective catering project that is being undertaken by
BMW Group is explained as follows –
Project Initiation
This is the initial stage of the project wherein the business or the project needs, key
stakeholders, project goals as well as relevant information about the project. This is the first
stage of a project and it is important to ensure that effective planning is done so as to attain the
desired results. In context of the respective project, some of the items that will be prepared
during this stage, are as follows –
Project Title: “On site catering for BMW Group to provide heathy food options to the staff.”
An overview of the case study you have been given
As of now, there is no onsite catering available for the staff members of BMW Group,
which is one of the leading manufacturers of transportation equipment (Berrada, Emrani and
Ameur, 2021). The respective company is facing issues because there is a lot of movement
among the staff members from the premises during the lunch break. Due to this, there is
congestion issues within the local area. As a member of the Project and Program Office, it is the
responsibility to deliver the change program for the organization. As per the case study, the
company has two primary objectives. Firstly, the company wants to reduce the movement of the
staff from the premises during the lunch break which is currently creating congestion issues in
the local area. Apart from this, it also wants to help the staff to develop a healthy lifestyle which
the organsiation believes is part of their CSR and will also reduce staff absenteeism. Thus, the
project will focus on providing healthy food to the staff such as getting catered from somewhere,
either cooking food in-house or booking it outside at an eatery.
Explanation of each stage of the PLC that applies to the project, including supporting
documentation for each stage
Product lifecycle management refers to the process of handling a good as it moves
through the different stages such as development and introduction, growth, maturity as well as
decline (Ham, Kim and Kim, 2020). There are many benefits of product lifecycle management
such as it ensures that the product reaches the customers faster and any additional costs are
eliminated. The project lifecycle for the respective catering project that is being undertaken by
BMW Group is explained as follows –
Project Initiation
This is the initial stage of the project wherein the business or the project needs, key
stakeholders, project goals as well as relevant information about the project. This is the first
stage of a project and it is important to ensure that effective planning is done so as to attain the
desired results. In context of the respective project, some of the items that will be prepared
during this stage, are as follows –
Goals – The goal of the project is to help the staff to develop a healthy lifestyle which the
organsiation believes is part of their CSR. The project will focus on providing healthy food to the
staff such as getting catered from somewhere.
Scope – This is the second item that will be covered as a part of project initiation and in
context to the respective project, the scope is to provide the staff members with healthy food or
get it catered from somewhere.
Stakeholders – The different stakeholders that will be involved in the respective project
will include management, the project manager, employees, workers etc.
Roles and Responsibilities – Since there are different people who will be involved in the
project, each of them will have their own role as well as responsibility (Jiang and et.al., 2020).
For instance, the role of the project manager will be to overlook the progress of the project as
well as the performances of individual team members. Apart from this, the catering company
also has different roles as well as responsibilities such as to ensure that healthy meals are
available to the staff members and maintain healthy relationships with them.
Budget - The budget for the respective project will be as follows -
Particulars Amount (In pounds)
Special meal 19458
Transportation 14889
Special in premise delegation 108820
Marketing and promotion 66815
Total 209982
Constraints and Risks – When a project is undertaken, there can be various constraints
as well as risks that can have an impact on the various project activities to a great extent. As far
as the respective project is concerned, the different constraints can include unrealistic
expectations of the customers, risks related to marketing, operational as well as management
risks.
organsiation believes is part of their CSR. The project will focus on providing healthy food to the
staff such as getting catered from somewhere.
Scope – This is the second item that will be covered as a part of project initiation and in
context to the respective project, the scope is to provide the staff members with healthy food or
get it catered from somewhere.
Stakeholders – The different stakeholders that will be involved in the respective project
will include management, the project manager, employees, workers etc.
Roles and Responsibilities – Since there are different people who will be involved in the
project, each of them will have their own role as well as responsibility (Jiang and et.al., 2020).
For instance, the role of the project manager will be to overlook the progress of the project as
well as the performances of individual team members. Apart from this, the catering company
also has different roles as well as responsibilities such as to ensure that healthy meals are
available to the staff members and maintain healthy relationships with them.
Budget - The budget for the respective project will be as follows -
Particulars Amount (In pounds)
Special meal 19458
Transportation 14889
Special in premise delegation 108820
Marketing and promotion 66815
Total 209982
Constraints and Risks – When a project is undertaken, there can be various constraints
as well as risks that can have an impact on the various project activities to a great extent. As far
as the respective project is concerned, the different constraints can include unrealistic
expectations of the customers, risks related to marketing, operational as well as management
risks.
Project Approval – This is the most important element of the project initiation process
that involves obtaining approval on the project from the high authorities as well as the owner of
the project. When the approval is obtained, the project can be initiated effectively.
Project Planning
Project planning can be referred to as the second stage of the project management
lifecycle, that involves developing plans for the different activities as well as tasks of the project
to ensure that the team members have a clarity about their respective roles and responsibility
(Morera and et.al., 2020). For the respective project, in order to set up onsite catering for the staff
of BMW Group, the project manager will have to undertake effective planning to ensure that the
project is conducted in an effective manner. The different items to be considered in the planning
process are explained below-
Scope Planning – This is the first element of the project planning process and includes
specifications about the requirements to carry out the project. This ensures that the work
breakdown structure or WBS for the project is created in an effective manner. In order to
develop onsite catering for BMW Group, it is important to establish a specific baseline for the
project to make sure that it is conducted in an effective manner.
Resource Planning – Resource planning is important and involves defining which
stakeholders will be responsible for what tasks (Petryk and et.al., 2020). Apart from this, in
context to the respective project, it will be specified the skills that will be required for
undertaking the project effectively such as problem solving as well as decision making.
Schedule Development – This will include the list of the entire schedule, including the
different activities as well as their sequence.
Procurement Planning – This particular type of planning will involve putting emphasis
on vendors as well as suppliers of the company. Not only this, in context to the respective
project, a caterer will be contacted for delivering the healthy food to the company premises
during the lunch time.
that involves obtaining approval on the project from the high authorities as well as the owner of
the project. When the approval is obtained, the project can be initiated effectively.
Project Planning
Project planning can be referred to as the second stage of the project management
lifecycle, that involves developing plans for the different activities as well as tasks of the project
to ensure that the team members have a clarity about their respective roles and responsibility
(Morera and et.al., 2020). For the respective project, in order to set up onsite catering for the staff
of BMW Group, the project manager will have to undertake effective planning to ensure that the
project is conducted in an effective manner. The different items to be considered in the planning
process are explained below-
Scope Planning – This is the first element of the project planning process and includes
specifications about the requirements to carry out the project. This ensures that the work
breakdown structure or WBS for the project is created in an effective manner. In order to
develop onsite catering for BMW Group, it is important to establish a specific baseline for the
project to make sure that it is conducted in an effective manner.
Resource Planning – Resource planning is important and involves defining which
stakeholders will be responsible for what tasks (Petryk and et.al., 2020). Apart from this, in
context to the respective project, it will be specified the skills that will be required for
undertaking the project effectively such as problem solving as well as decision making.
Schedule Development – This will include the list of the entire schedule, including the
different activities as well as their sequence.
Procurement Planning – This particular type of planning will involve putting emphasis
on vendors as well as suppliers of the company. Not only this, in context to the respective
project, a caterer will be contacted for delivering the healthy food to the company premises
during the lunch time.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Communication Planning – It can be referred to a s the communication strategy that is
designed for exchanging information with all the project stakeholders. For the respective project,
the key communication strategies that will be used, will include effective verbal communication.
Project Execution
This is an important stage wherein the different plans as well as activities of the project
are executed. The project manager will ensure that the resources as well as task responsibilities
are assigned (Become an expert at project execution, 2021). In context to the respective project
of onsite catering, the project manager will ensure that the project tasks are completed in an
effective manner. The different elements of project execution are explained below –
Project Deliverables – It is referred to as the output of the project and in context to the
respective project, the deliverables will include reviewing the food that the caterer will serve to
the employees (Praticò and et.al., 2020). It will be assessed if the food is healthy or not.
Change Requests – This will include all of the information about any change that takes
pace during the project such as there can be changes that are specified from the client’s side and
so on. The change requests have to be reviewed as well as approved.
Updated Documents – It is important to document any change that takes place during
the project should be documented in an effective manner so that the team members can refer
back to the same as and when required.
Project Closure
This is the last phase of the project lifecycle wherein the project is officially closed by the
project manager. The different elements of the respective project will include –
Releasing staff and Equipment – It is important for the project manager to release the staff as
well as the equipment once the project is closed (Sun and Ertz, 2021). This will ensure that the
project is conducted in an effective manner.
Handing over the deliverables – This element will involve handing over the final
project or the project deliverables to the client. Such as the healthy meals will be provided to the
staff members of the company.
designed for exchanging information with all the project stakeholders. For the respective project,
the key communication strategies that will be used, will include effective verbal communication.
Project Execution
This is an important stage wherein the different plans as well as activities of the project
are executed. The project manager will ensure that the resources as well as task responsibilities
are assigned (Become an expert at project execution, 2021). In context to the respective project
of onsite catering, the project manager will ensure that the project tasks are completed in an
effective manner. The different elements of project execution are explained below –
Project Deliverables – It is referred to as the output of the project and in context to the
respective project, the deliverables will include reviewing the food that the caterer will serve to
the employees (Praticò and et.al., 2020). It will be assessed if the food is healthy or not.
Change Requests – This will include all of the information about any change that takes
pace during the project such as there can be changes that are specified from the client’s side and
so on. The change requests have to be reviewed as well as approved.
Updated Documents – It is important to document any change that takes place during
the project should be documented in an effective manner so that the team members can refer
back to the same as and when required.
Project Closure
This is the last phase of the project lifecycle wherein the project is officially closed by the
project manager. The different elements of the respective project will include –
Releasing staff and Equipment – It is important for the project manager to release the staff as
well as the equipment once the project is closed (Sun and Ertz, 2021). This will ensure that the
project is conducted in an effective manner.
Handing over the deliverables – This element will involve handing over the final
project or the project deliverables to the client. Such as the healthy meals will be provided to the
staff members of the company.
Informing the Stakeholders – This is the last step wherein the project manager will
inform the stakeholders about the completion of the project.
Building a case
Particulars Description
Name of project On-site catering for BMW Group
Vision and Mission Vision – To be profitable and to enhance long-term value.
Mission – To become the world’s leading manufacturer and provider
of premium products and services.
Executive Summary An on-site catering project will be undertaken so as to provide healthy
food meals to the staff members as well as ensure that there is no
congestion in the local area.
New Idea The taste preference of the customers will be taken into account along
with their respective lifestyles.
Impact on existing
situation
This will be beneficial for the respective company, BMW Group and
ensure that the employees are able to live a healthy lifestyle and
perform productively.
Required Resources A well-experienced caterer, qualified team members, required funds,
delivery of food meals.
Project Plan Refer to Gantt Chart;
Strategy Proper marketing will be done for the project to ensure that the project
is completed successfully.
Conclusion It can be concluded that a business case helps in enhancing the project
deliverables. This is because it also helps in determining the costs as
well as benefits in an effective manner.
inform the stakeholders about the completion of the project.
Building a case
Particulars Description
Name of project On-site catering for BMW Group
Vision and Mission Vision – To be profitable and to enhance long-term value.
Mission – To become the world’s leading manufacturer and provider
of premium products and services.
Executive Summary An on-site catering project will be undertaken so as to provide healthy
food meals to the staff members as well as ensure that there is no
congestion in the local area.
New Idea The taste preference of the customers will be taken into account along
with their respective lifestyles.
Impact on existing
situation
This will be beneficial for the respective company, BMW Group and
ensure that the employees are able to live a healthy lifestyle and
perform productively.
Required Resources A well-experienced caterer, qualified team members, required funds,
delivery of food meals.
Project Plan Refer to Gantt Chart;
Strategy Proper marketing will be done for the project to ensure that the project
is completed successfully.
Conclusion It can be concluded that a business case helps in enhancing the project
deliverables. This is because it also helps in determining the costs as
well as benefits in an effective manner.
Work Breakdown Structure
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Gantt Chart
Analysis of the project methodologies and tools used
The various project methodologies will include –
Project Leadership – It can be referred to as a term that involves the project leader to
make sure that the team members are motivated as well as engaged to their respective jobs
(Willems and et.al., 2021). In context to the respective project, the project manager will ensure
that the team members are engaged to their work and work in a productive manner. One of the
advantage of project leadership is that it boosts the overall morale of the employees as well as
task coordination.
Agile Methodologies – Agile can be referred to as a set of practices that are primarily
intended to improve the overall effectiveness of an organization. In context of the respective
project, the advantages will include delivery of high-quality products and services, improved
productivity of the project as well as enhanced flexibility.
Review and critically evaluate the effectiveness of the PLC in application to your project using
the appropriate theories models and concepts
It can be said that the respective firm, BMW Group is undertaking a project to ensure that
there is no congestion during the lunch time as well as the employees have access to high quality
healthy products. There are different stages in project life cycle and while undertaking the
project, the project manager will ensure that the effective goals and objectives are set (Zang and
et.al., 2020). Besides this, effective project management will help in tracking the progress of the
report. Project mentoring will help in providing the project members about the overall activities
that will be undertaken. Apart from this, program theory is another model that can be
implemented by the project manager of BMW Group to support a review of the overall project.
As a result, the expected outcomes can be achieved and the project will be completed in an
effective manner. Thus, it can be said that the implementation of the different models should be
done in a proper way. this will help in achieving the expected results and making sure that the
estimated goals the objectives are achieved. Also, the employees, processes as well as resources
The various project methodologies will include –
Project Leadership – It can be referred to as a term that involves the project leader to
make sure that the team members are motivated as well as engaged to their respective jobs
(Willems and et.al., 2021). In context to the respective project, the project manager will ensure
that the team members are engaged to their work and work in a productive manner. One of the
advantage of project leadership is that it boosts the overall morale of the employees as well as
task coordination.
Agile Methodologies – Agile can be referred to as a set of practices that are primarily
intended to improve the overall effectiveness of an organization. In context of the respective
project, the advantages will include delivery of high-quality products and services, improved
productivity of the project as well as enhanced flexibility.
Review and critically evaluate the effectiveness of the PLC in application to your project using
the appropriate theories models and concepts
It can be said that the respective firm, BMW Group is undertaking a project to ensure that
there is no congestion during the lunch time as well as the employees have access to high quality
healthy products. There are different stages in project life cycle and while undertaking the
project, the project manager will ensure that the effective goals and objectives are set (Zang and
et.al., 2020). Besides this, effective project management will help in tracking the progress of the
report. Project mentoring will help in providing the project members about the overall activities
that will be undertaken. Apart from this, program theory is another model that can be
implemented by the project manager of BMW Group to support a review of the overall project.
As a result, the expected outcomes can be achieved and the project will be completed in an
effective manner. Thus, it can be said that the implementation of the different models should be
done in a proper way. this will help in achieving the expected results and making sure that the
estimated goals the objectives are achieved. Also, the employees, processes as well as resources
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
can be aligned to ensure that the objectives are attained. Following are respective stages of PLC
that can be followed in respect organizational firm.
Project Initiation
This is the initial stage of the project wherein the business or the project needs, key
stakeholders, project goals as well as relevant information about the project. This is the first
stage of a project and it is important to ensure that effective planning is done so as to attain the
desired results.
Project Planning
Project planning can be referred to as the second stage of the project management
lifecycle, that involves developing plans for the different activities as well as tasks of the project
to ensure that the team members have a clarity about their respective roles and responsibility. For
the respective project, in order to set up onsite catering for the staff of BMW Group, the project
manager will have to undertake effective planning to ensure that the project is conducted in an
effective manner. The different items to be considered in the planning process are explained
below-
Project Execution
This is an important stage wherein the different plans as well as activities of the project
are executed. The project manager will ensure that the resources as well as task responsibilities
are assigned. In context to the respective project of onsite catering, the project manager will
ensure that the project tasks are completed in an effective manner.
Project Closure
This is the last phase of the project lifecycle wherein the project is officially closed by the
project manager. Under this stage better standards are being set that are in accordance to
delivering better efforts of an individual firm while taking greeting with project stakeholders
Effectiveness of PLC
The provided stages of PLC derived coordinated efforts with the workplace for which
business operations were being shaped. This covers significant detailing on operations of the
that can be followed in respect organizational firm.
Project Initiation
This is the initial stage of the project wherein the business or the project needs, key
stakeholders, project goals as well as relevant information about the project. This is the first
stage of a project and it is important to ensure that effective planning is done so as to attain the
desired results.
Project Planning
Project planning can be referred to as the second stage of the project management
lifecycle, that involves developing plans for the different activities as well as tasks of the project
to ensure that the team members have a clarity about their respective roles and responsibility. For
the respective project, in order to set up onsite catering for the staff of BMW Group, the project
manager will have to undertake effective planning to ensure that the project is conducted in an
effective manner. The different items to be considered in the planning process are explained
below-
Project Execution
This is an important stage wherein the different plans as well as activities of the project
are executed. The project manager will ensure that the resources as well as task responsibilities
are assigned. In context to the respective project of onsite catering, the project manager will
ensure that the project tasks are completed in an effective manner.
Project Closure
This is the last phase of the project lifecycle wherein the project is officially closed by the
project manager. Under this stage better standards are being set that are in accordance to
delivering better efforts of an individual firm while taking greeting with project stakeholders
Effectiveness of PLC
The provided stages of PLC derived coordinated efforts with the workplace for which
business operations were being shaped. This covers significant detailing on operations of the
business firm for which better strategy can be adopted by the business firm to deliver effective
standards of working when being engaged in business operations. This allows corporate firm to
derive effective terms on the basis of which qualitative standards of production in the business
firm can be set. In addition to this, brand image of the company can also be maintained.
Use of appropriate theories, concepts and models in the PLC will differentiate between large and
small-scale projects.
Through the use of appropriate concepts, theories and models in PLC significant
difference between large and small-scale projects can be formulated. Being under the term
effective standards will be derived for which coordinated terms can be defined under which
better terms of working in the business firm can be derived. Apart from this, program theory is
another model that can be implemented by the project manager of BMW Group to support a
review of the overall project. As a result, the expected outcomes can be achieved and the project
will be completed in an effective manner. Thus, it can be said that the implementation of the
different models should be done in a proper way. this will help in achieving the expected results
and making sure that the estimated goals the objectives are achieved.
Evaluate the PLC through a practical and theoretical exploration of its effectiveness to
draw valid conclusions and recommendations for improvement.
Exploring PLC through its effectiveness to draw valid recommendations and conclusion
for improvements can be stated under variety of business functions. Under the term better
working in the business firm can be ensured that will enable coordinated efforts taking guidance
of proper resource allocation. In addition to this, it also aid towards developing engagement with
employees of the business firm.
Managers at the respective firm are recommended to perform frequent market researches.
In addition to this, provided business firm will develop better arrangement for the working
effectively when being operating in competitive business environment. Therefore, through such
recommendations significant improvements can be made taking guidance of effective working in
the corporate firm.
Conclusion
From the analysis of above report, it can be concluded that operations and management
plays a vital role in developing effective standards of working in the business firm. This delivers
effective outcomes for which better standards of operational firm were being delivered. It
standards of working when being engaged in business operations. This allows corporate firm to
derive effective terms on the basis of which qualitative standards of production in the business
firm can be set. In addition to this, brand image of the company can also be maintained.
Use of appropriate theories, concepts and models in the PLC will differentiate between large and
small-scale projects.
Through the use of appropriate concepts, theories and models in PLC significant
difference between large and small-scale projects can be formulated. Being under the term
effective standards will be derived for which coordinated terms can be defined under which
better terms of working in the business firm can be derived. Apart from this, program theory is
another model that can be implemented by the project manager of BMW Group to support a
review of the overall project. As a result, the expected outcomes can be achieved and the project
will be completed in an effective manner. Thus, it can be said that the implementation of the
different models should be done in a proper way. this will help in achieving the expected results
and making sure that the estimated goals the objectives are achieved.
Evaluate the PLC through a practical and theoretical exploration of its effectiveness to
draw valid conclusions and recommendations for improvement.
Exploring PLC through its effectiveness to draw valid recommendations and conclusion
for improvements can be stated under variety of business functions. Under the term better
working in the business firm can be ensured that will enable coordinated efforts taking guidance
of proper resource allocation. In addition to this, it also aid towards developing engagement with
employees of the business firm.
Managers at the respective firm are recommended to perform frequent market researches.
In addition to this, provided business firm will develop better arrangement for the working
effectively when being operating in competitive business environment. Therefore, through such
recommendations significant improvements can be made taking guidance of effective working in
the corporate firm.
Conclusion
From the analysis of above report, it can be concluded that operations and management
plays a vital role in developing effective standards of working in the business firm. This delivers
effective outcomes for which better standards of operational firm were being delivered. It
includes deriving effective terms on the basis of which better operational tasks can be produced
in the business firm and productive working in competitive business market.
in the business firm and productive working in competitive business market.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
REFERENCES
Books & Journals
Berrada, A., Emrani, A. and Ameur, A., 2021. Life-cycle assessment of gravity energy storage
systems for large-scale application. Journal of Energy Storage, 40, p.102825.
Ham, N.H., Kim, W.G. and Kim, J.J., 2020. BIM based Construction Project Case Analysis for
Facility Life Cycle Management from the Perspective of the Client. Journal of
KIBIM, 10(3), pp.12-21.
Jiang, L. and et.al., 2020. Seismic life-cycle cost assessment of steel frames equipped with steel
panel walls. Engineering Structures, 211, p.110399.
Morera, S. and et.al., 2020. Evaluation of different practices to estimate construction inventories
for life cycle assessment of small to medium wastewater treatment plants. Journal of
Cleaner Production, 245, p.118768.
Petryk, O. and et.al., 2020. Conceptual model for assessing the investment attractiveness of
innovative projects of industrial enterprises. Accounting, 6(7), pp.1345-1350.
Praticò, F.G. and et.al., 2020. Energy and environmental life cycle assessment of sustainable
pavement materials and technologies for urban roads. Sustainability, 12(2), p.704.
Sun, S. and Ertz, M., 2021. Environmental impact of mutualized mobility: Evidence from a life
cycle perspective. Science of The Total Environment, 772, p.145014.
Willems, J.J. and et.al., 2021. The lifecycle of public value creation: eroding public values in the
Dutch Marker Wadden project. Public Money & Management, pp.1-10.
Zang, G. and et.al., 2020. Life cycle assessment of power-generation systems based on biomass
integrated gasification combined cycles. Renewable Energy, 149, pp.336-346.
Online
Become an expert at project execution. 2021. [Online]. Available through:<
https://www.atlassian.com/work-management/project-management/project-execution>.
Books & Journals
Berrada, A., Emrani, A. and Ameur, A., 2021. Life-cycle assessment of gravity energy storage
systems for large-scale application. Journal of Energy Storage, 40, p.102825.
Ham, N.H., Kim, W.G. and Kim, J.J., 2020. BIM based Construction Project Case Analysis for
Facility Life Cycle Management from the Perspective of the Client. Journal of
KIBIM, 10(3), pp.12-21.
Jiang, L. and et.al., 2020. Seismic life-cycle cost assessment of steel frames equipped with steel
panel walls. Engineering Structures, 211, p.110399.
Morera, S. and et.al., 2020. Evaluation of different practices to estimate construction inventories
for life cycle assessment of small to medium wastewater treatment plants. Journal of
Cleaner Production, 245, p.118768.
Petryk, O. and et.al., 2020. Conceptual model for assessing the investment attractiveness of
innovative projects of industrial enterprises. Accounting, 6(7), pp.1345-1350.
Praticò, F.G. and et.al., 2020. Energy and environmental life cycle assessment of sustainable
pavement materials and technologies for urban roads. Sustainability, 12(2), p.704.
Sun, S. and Ertz, M., 2021. Environmental impact of mutualized mobility: Evidence from a life
cycle perspective. Science of The Total Environment, 772, p.145014.
Willems, J.J. and et.al., 2021. The lifecycle of public value creation: eroding public values in the
Dutch Marker Wadden project. Public Money & Management, pp.1-10.
Zang, G. and et.al., 2020. Life cycle assessment of power-generation systems based on biomass
integrated gasification combined cycles. Renewable Energy, 149, pp.336-346.
Online
Become an expert at project execution. 2021. [Online]. Available through:<
https://www.atlassian.com/work-management/project-management/project-execution>.
1 out of 26
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.