Table of Contents INTRODUCTION...........................................................................................................................1 PART 1............................................................................................................................................1 1. Introduction to organization....................................................................................................1 2. An explanation of operation vs operations management........................................................1 3. Implementation of operations management principles...........................................................2 4. Analyse the extent to which the operations management of the organization in the case study meets the requirements of the organization.......................................................................2 5. Continuous improvement as a philosophy and describe the Lean principles.........................3 6. Prepare a continuous improvement plan.................................................................................4 7. Recommendation.....................................................................................................................4 PART 2............................................................................................................................................5 I........................................................................................................................................................5 1.An overview of the Portakabin case study...............................................................................5 2. Business case...........................................................................................................................5 3. Project plan..............................................................................................................................5 4. Work Breakdown Structure (WBS) for developing of a new product....................................6 5. Gantt Chart.............................................................................................................................7 6. Provide theoretical and conceptual arguments to justify the use of project methodologies, tools and leadership required within the given project...............................................................8 II.......................................................................................................................................................9 a. Effectiveness of the PLC........................................................................................................9 b. Why designing and implementing PLC is important to execute of the success of Portakabin case study....................................................................................................................................9 c. How cost saving techniques could be incorporated in PLC?................................................10 d. What different techniques could be used to ensure quality, scope and tenure in the project implementation?........................................................................................................................10 e. Critically analyse how different theories, concepts and models could be used between large and small-scale projects............................................................................................................10 f. Critically evaluate the PLC you have prepared within practical and theoretical frameworks. ...................................................................................................................................................10
INTRODUCTION Project management is defined as the overall planning as well as execution of certain project. It is crucial work that allow organisation to maintain its project effectually. Operation management is considered as administration of enterprises activities for developing high level of effectiveness as much as possible into firm(Alias and et. al., 2014). As per the scenario, the selected company for this report is Marks & Spencer and Portkabin. M&S is well known British retailer having headquarter is in London, UK. Portkabin is considered as the leading modular building innovator that run its business in about six countries having headquarters is in UK. This report covers the explanation of operation and operation management, implementation of operation management principles, development of continuous improvement plan and application of project life cycle. Apart from this, business case, project plan, work-break down structure, Gantt chart as wel as critique the effectiveness of PLC are also discussed in this report. PART 1 1. Introduction to organization. Marks & Spencer is considered as the well known British retailer which brings high quality, better value food, clothing as well as home ware to several consumers in approx all over the world. Its headquarters is in London, United Kingdom and established in year 1884. moreover,currently it have about 1463 stores in all over the world. It sells clothing, footwear, home products, food products and also the financial services to customers.Moreover, they has around 80,787 staff across the world. Also, in year 2012 they overtaken the firm named as Next Plc (About M&S. 2019). 2. An explanation of operation vs operations management Operation is considered as that activities as wel as process which are efefctively and particularly performed through companyfor attaining its objectives in appropriate and proper manner(Amiril and et. al., 2014). Where as operation management is defined as the procedures toplan,organise,guideandcontrolfunctionoforganisationatoperativeendssuchas manufacturing, productions and many more. 1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
3. Implementation of operations management principles Case study:Marks & Spencer is planning to explore their business activities with its currentproducts within the another country such as Monaco. For performing this, they has to formulate strategy in resect to marketing as well as promotion of its goods in order to enhance awareness within clients. With this, respective organisation can increase its base of customers and ratio of profitability. In order to formulate plan, they has to assess the whole market area that assists them to understand the requirements of consumers. Operation management principles are refers as the regulations, guidelines and so on that is significant for whole workers in complying this for using many functions and practices(Bahn, 2013). Basically, there are ten kinds of principles like variances, fundamentals and others. Some principle which are crucial for Marks & Spencer are explained below: ï‚·Organisation:For attaining the goals of organisation, it is important for the company to maintainanddeveloprelationswithwholedepartmentsinordertodothework effectually. Marks & Spencer has to form better relation with overall section for positive atmosphere. They has to build relationship with all department as it assists them to accomplish workers satisfaction and profitability ratio. For enhancing the enterprises into Monaco, it is significant for them to considered whole section in order to promote as well as market its offerings.Along with this, this particular principle of operation management is also limitation for respective entity as it is much difficult for them to perform all the business functions at other location into new region. ï‚·Change:For attracting various clients and inspire employees, it is significant for company to adapt the changes in effectual and efficacious way. This renders guidance to its manager for resolving the issues that occurred into firm(Benito and et. al., 2013). For change management, Marks & Spencer can utilise advanced technology as well as system for knowing requirements of its consumers. As respective organisation is extending its enterprises in Monaco, so it is significant to get knowledge regarding their public demands for efficacious outcomes. So, this help them to use new process and techniques for performing the task that leads towards grabbing more customers.Along with this, this principle of operations management is also limitation for respective firm as this incurs more costs which would develop some burden upon firms and also it is difficult for employees to adapt the change as well as work with new technology techniques. 2
4. Analyse the extent to which the operations management of the organization in the case study meets the requirements of the organization. In order to meet the requirements of enterprises,Marks & Spencer has to used the operations management principles for developing the standards for attaining its goals in officious and effective manner. As they has adapted 2 principles such as organisation and change in order to operate its enterprise in smoother way. Marks&Spencerhasconductedmarketevaluationforknowingitspowerand capabilities for accomplishing their decided goals efficaciously. They has the abilities related to research and development that assists them in promoting its enterprises n specific field. Beside this, it has strong brand value and image into market area that help them to attract various consumersinordertobuyitsgoods.Respectiveorganisationcanadoptitsresources, modification as well as technology that is required into enterprises. Therefore, by this way its operation management meets the requirements of business. 5. Continuous improvement as a philosophy and describe the Lean principles Lean principle is considered as the continuous improvement philosophy as well as defined as the tools which have adopted by organisation for enhancing the value of goods to obviate waste while producing products(Burke, 2013). This assists Marks & Spencer to produce their products according to the clients needs with optimal uses of resources at firm. With the aids of this particular principle, they can minimise waste and manufacture effective quality of products effectually.Marks & Spencer have used lean principle for decreasing the cost of manufacturing as well as minimise wastage in order to facilitate goods at specified area efficaciously. In addition to this, in order to develop the procedures there are some principles that are used by Marks & Spencer.Define value:It is refers as the needs of clients for certain goods where they purchase products to attain their requirements. In order understand the customer’s needs, it is essential for them to do market evaluation by using questionnaires, survey and etc. therefore,Marks&Spencerhastodosurveywithinspecificmarketareasfor understanding their consumers.Map value stream:This assists organisation to develop value stream for its goods which is facilitated to its customers. Marks & Spencer has to adopt the modification that add ons 3
the value to their products that will be provided within other areas. They cam decrease its waste and production cost by utilising this principle for their clients requirements.ï‚·Create flow:Marks & Spencer can reduce its wastage in easy way to do the all procedures appropriately. This aids them to provide their goods to customers in Monaco efficaciously in order to satisfy its requirements.ï‚·Establish pull:In this, organisation focused on developing and delivering goods to clients in particular duration for attracting them with their offerings. ï‚·Pursuit perfection:In this, organisation operates their enterprises effectually. This aids Marks & Spencer to extent their business into other location. This aids them to grab the attention of clients for increasing profit and sales. 6. Prepare a continuous improvement plan Continuous improvement plan is also called the continuous improvement process which is a continual efforts to improve goods, procedures and services. This assists them in improving quality, minimising cost, simplified the working procedures, decrease wastage as well as develop consumers satisfaction and profitability(Flemingand Koppelman, 2016). Thus, the continuous improvement plan is formulated by Marks & Spencer in order to explore its businesses at Monaco are mentioned below: BasisCurrent used methodologiesProposed methodologies for use Market analysisMarks&Spencercanmanufacture goods as per the clients requirements. Therefore by doing this, it can know about Monaco people requirements as wellasadoptthemodification accordingly. Marks&Spencercancreatea expertisegroupfortheanalysing marketplaceandrequirementsof Monaco public. This assists them to facilitate goods potential users. CostCompanyisusingpremiumpricing strategywhichresultsinnot affordability of products for everyone. Mark&Spencerhaveto manufacture products for every type ofpeople.Sothat,itwillbein affordanceofeveryoneineasy manner. 4
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7. Recommendation After analysing the above issues, this have been recommended that Marks & Spencer have to conduct market analysis of Monaco for getting knowledge about the requirements of clients. Also, this is suggested that in order to develop the operations functions they have to set effectivestandardsfortheiremployeesinordertodothewholeworkeffectuallyfor accomplishing objectives. Moreover, they has to concentrate upon the promotion for grabbing the attention of various consumers to increase the ratio of profit and market share. PART 2 I. 1.An overview of the Portakabin case study PortakabinisconsideredastheB2Bthatisbusinesstobusinessthatdealsinto construction as well as delivery of modular building for their clients. Moreover, it was developed in year 1961. its headquarters is in Huntington York, UK. Respective organisation operates its business n around 6 countries as well as having about 1300 employees. Presently, it launched a new product called Yorkon Building System(YBS), this is the unique products developed through utilising cutting edge modular building technology. 2. Business caseï‚·ExecutiveSummary:PortakabinLimitedhastoplanforaccomplishingitsgoals appropriately. Therefore, their crucial gaols is to make effective marketing strategy for its newly introduced goods for pricing, promotion and others as well as enhance awareness among clients.ï‚·Objectives:The main goals of respective organisation is to inspire its staff for doing the project work efficaciously in order to accomplish its goals.ï‚·Importance of new product:The new product cut down the modular building technology edge. Also, this is developed for facilitating them advantage of traditional building such as ability to adjust any foot print and external walls without any columns and delivered all those 50% faster then traditional one.ï‚·Target market:Portakabin targeted markets is United Kingdom. ï‚·Cost benefit analysis:For executing its plan effectively and efficiently, respective organisation required 50000 within a year. 5
3. Project plan Product life cycle This is defined as the procedures through which certain project is performed form starting to ending(Garel, 2013). In addition to this, it is the standard tools through which group can complete its project effectively. Respective organisation has adapted this to accomplish its goals. Project life cycle is discussed below:ï‚·Project initiation:It is the beginning stage which assists in explaining the requirements of projects for starting new work. This aids organisation to present project ideas which authorisesseveraldocumentsneededforwork.Thisincludesrespectivecompany objectives, vision etc. it assists them to achieve and accomplish the project objective. Therefore, its project manager can invest more funds upon promotion in order t develop awareness into market.Portakabin will understand requirement of their new product within market area because with the assistance of this respective company will able to find which customer they have to reach in effective manner. Also, Initially the respective entity have to initiate their new project as well as attain project goals.ï‚·Project planning:Within this, project are identified and how they are working into organisation are described. In this little objective integration with big project which is applied to attain goals at certain time period.Portakabin has to do research of market for understanding clients preferences so that project related planning will conduct within effective manner as well as goals related to the same will accomplish. Moreover, planning to promote their new goods by utilising few techniques like websites, social media and etc.ï‚·Project execution:In this the activities of project are implement efficaciously for accomplishing goals. This involves several person capital and time in order to accomplish project work(Kowang and et. al., 2014). For instance, project manager ofPortakabin will design budget for bringing their newproduct within market area i.e., Yorkon Building System(YBS) with the aids of analysis as well as investigation of overall clients and workers requirements. ï‚·Project closure:When work have been completed then they has to close it is known as closure phase.There are many activities which is required to be obey in this step. This provide advantage to Portakabin in achieving their goals and objectives related to Yorkon 6
Building System(YBS).After attainment of overall activities, project manager develops work break down structure for doing many activities. Therefore, some of the limitation of product life cycle for Yorkon Building System(YBS). The product lifestyles cycle is simply too smooth a pictures, now and again a product’s income would possibly in no way upward push past the creation degree, or it may input right into a decline simply before going right into a subsequent upward push. Therefore, this may purpose managers to be too rigid of their techniques, as they anticipate the sales volumes in their merchandise to comply with a script written in stone. Product existence cycles can be self-pleasing. Every degree has a fixed of endorsed moves. Therefore, while a product starts off evolved to act as though it's far in a decline, managers might determine to discontinue that product, because this is the protocol. in the meantime, it could be that the product turned into simply dipping in sales, as a result of financial externalizations, so that you can in the end raise. 4. Work Breakdown Structure (WBS) for developing of a new product Work break down structure is defined as the structure where task of project are divided in small units and work are distributed to whole person so that they can perform its task effectually. So,thisassistsPortakabintodividetheirtaskintosmallerpartssuchasdesignbrief, specification, testing alternative solution, realisation and product testing so that products can be developed efficaciously and appropriately.With the assistance of this Portakabin divide each and every activity related to their new product in effective manner. Through WBS respective company will able to conduct operations of their work in effective manner as well as objectives related to the same will accomplished. In addition this, work break down formed the task in much simpler manner and also helpful for accomplishing it on time. 7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
5. Gantt Chart This is defined as graphical presentation of bar diagram which represents beginning and ending dates of given project work, position as well as persons accountability for project(Mubin and Mubin, 2016). So, this assists Portakabin to show overall activities and its time period. Portakabin will allot proper time duration to their new product such as design brief (2 months), specification (2 months), testing of alternative solution (3 months), realisation and product testing (2 months).Therefore, for developing the new product the various activities and also the times allotted for them. Also, the task is categorised for respective product are develop brief, specifications, alternative solution testing, realise as well as product testing. 8
6. Provide theoretical and conceptual arguments to justify the use of project methodologies, tools and leadership required within the given project. There are many methodologies of project, tools and leadership that is needed to perform project task efficaciously. The project methodologies like lean production, six sigma aids to minimise cost as well as increase manufacturing properly for profitable results. Likewise. Respective project needs style of leader like democratic, autocratic etc. for formulating further plans in accomplishing goals effectually so that profitable results is attained. II. a. Effectiveness of the PLC The application of several techniques, action plan and system during doing their project task which is promoting and marketing its YBS products which provides benefits to them. The effectiveness of PLC can be explained by using models that are explained below: Water fall model: It is established for ensuring Portakabin results. This help them to has control over that operation as well as activities which are associated to project and its task. This have few steps:ï‚·Requirements:In this, Portakabin describe and plan the task for particular project.ï‚·Analysis:In this, Portakabin examine the business ideas and model of goods to scrutinize financial and technical feasibility.ï‚·Design:In this, Portakabin designed the project document effectively through using programming languages, data source etc.ï‚·Coding:In this, Portakabin formulate the code with the aids of models, logic and others through which the starting step is described.ï‚·Testing:In this, Portakabin has to determine system and project quality are to be performed as well as examined issues for solving it. 9
Operations:Portakabin has to maintain and support project for keeping this upgraded and arranged. Maintenance:In this, Portakabin has to do its work for modifying, improving and increasing final products. There are several benefits of implementing PLC within working of organisation because it will define the strategies which based on life cycle stage. b. Why designing and implementing PLC is important to execute of the success of Portakabin case study. As PLC assists to facilitate effective guidelines for project for performing all activities in systematised manner. It can aids enterprise to attain outcomes(Nicholasand Steyn, 2017). The designing assistsPortakabin to understand phases needed for effective projects as well as implementation helps respective organisation to attain project objectives. There are many steps of PLC which aids them to accomplish project by attaining objectives effectually for profitable results.There are several performance measurement tools which Portakabin can implement within their working such as:- Benchmarks – It is an point by which Portakabin can measure performance of their new product i.e., Yorkon Building system. For company it is essential to measure performance of their product within market area so that if any changes required then will implement in effective manner. Key performance indicators – It is an critical indicator which progress toward an intended result as well as KPI focus on strategic and operational movement. Along with this, KPI will create analytical basis for Portakabin in relation of their decision making in terms of their new product. c. How cost saving techniques could be incorporated in PLC? There are various kinds of costs saving techniques like total quality control, market research and others, through executing these techniques in PLC procedures assists Portakabin to formulate efficacious planning for cost in order to get optimistic results. For introducing goods several cost should beard through company in order to examine all cost for profitable results. 10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
d. What different techniques could be used to ensure quality, scope and tenure in the project implementation? There are many techniques that may be utilised for assuring scope, quality, time into project execution(Oti and et. al., 2016). All these techniques aids Portakabin to facilitates profitable results. In order to evaluate quality lean manufacturing and total quality management techniques are used. Moreover, the scope is evaluated through observing as well as time period is measures by Gantt Chart. e. Critically analyse how different theories, concepts and models could be used between large and small-scale projects. ModelSmall projectLarge project Total quality managementTQM is applied in small scale projectssuchasestablishing websites for marketing will be limitedforclearingthe utilisationaswellas interactingthroughsitesand assuring efficacious interface. In large project such as YBS in Portakabin, TQM will be used for judging the raw material, proceduresandmachinery quality. Also, on final goods by inspection as well as quality control. f. Critically evaluate the PLC you have prepared within practical and theoretical frameworks. PLC is so much helpful for Portakabin as this assists them to introduce new product in market area(Wang Wei and Sun, 2013). The main advantage of PLC are aids in sales forecasting, making decisions, maximising competitive edge and others. Likewise, this have few drawbacks in context of late as well as fluctuation into sales information, changing market circumstances etc.With the assistance of PLC company able to bring their new product within market area in effective manner. Along with this, goals related to the same will accomplish in better manner. CONCLUSION As per the above report, it have been concluded that operation as well as project management should be adapted into firm for assuring efficacious operations and various projects. 11
Adherence to operations management principle aids firm to accomplish their needs. Also, continuous improvement plan aids to assure appropriate as well as regular maximisation in cost, quality and many more. In addition to this implementation as well as critique of project life cycle will enable firm to examine, plan, execute and close the project effectively and efficiently with the help of some methodologies such as Six sigma, lean principle and other so that task can be accomplished on time in effective and efficient manner. 12
REFERENCES Books and Journals Alias, Z. and et. al., 2014. Determining critical success factors of project management practice: A conceptual framework.Procedia-Social and Behavioral Sciences.153. pp.61-69. Amiril, A. and et. al., 2014. Transportation infrastructure project sustainability factors and performance.Procedia-Social and Behavioral Sciences. 153.pp.90-98. Bahn, S., 2013. Workplace hazard identification and management: The case of an underground mining operation.Safety science.57. pp.129-137. Benito,G.R.andet.al.,2013.Offshoreoutsourcing:Adynamic,operationmode perspective.Industrial Marketing Management.42(2). pp.211-222. Burke, R., 2013. Project management: planning and control techniques.New Jersey, USA,26. Fleming, Q. W. and Koppelman, J. M., 2016, December. Earned value project management. Project Management Institute. Garel, G., 2013. A history of project management models: From pre-models to the standard models.International Journal of Project Management.31(5). pp.663-669. Kowang, T. O. and et. al., 2014. Operation management: project management in jig and fixture industries. InAdvanced Materials Research(Vol. 931, pp. 1621-1625). Trans Tech Publications. Mubin, S. and Mubin, G., 2016. Risk analysis for construction and operation of gas pipeline projects in Pakistan.Pakistan Journal of Engineering and Applied Sciences. Nicholas, J. M. and Steyn, H., 2017.Project management for engineering, business and technology. Routledge. Oti, A. H. and et. al., 2016. A framework for the utilization of Building Management System data in building information models for building design and operation.Automation in Construction.72. pp.195-210. Wang,N.,Wei,K.andSun,H.,2013.Wholelifeprojectmanagementapproachto sustainability.Journal of Management in Engineering. 30(2). pp.246-255. Online AboutM&S.2019.[Online].Available Through:<https://corporate.marksandspencer.com/aboutus> 13