Assessment Overview
These assessment tasks will assess the student’s skills and knowledge required to manage
project scope. The Assessment is divided into three (3) Assessment Tasks to assess the
student’s ability to understand the theoretical and then practical skills in managing a
project’s scope.
General Instructions
You are required to answer all questions within each Assessment Task and be
assessed as “Satisfactory” in each to gain competency BSBPMG530 Manage project
scope
Submit the completed Assessment Tasks to your Trainer & Assessor through
MOODLE.
There are three assessment tasks for this unit:
These assessment tasks will assess the student’s skills and knowledge required to manage
project scope. The Assessment is divided into three (3) Assessment Tasks to assess the
student’s ability to understand the theoretical and then practical skills in managing a
project’s scope.
General Instructions
You are required to answer all questions within each Assessment Task and be
assessed as “Satisfactory” in each to gain competency BSBPMG530 Manage project
scope
Submit the completed Assessment Tasks to your Trainer & Assessor through
MOODLE.
There are three assessment tasks for this unit:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Task A – Questioning
Task 2 ‒ Practical: Project
Task 3 ‒ Written
Before you commence your Assessment, ensure that you have good knowledge
of the subject, have thoroughly read your Learner Resource, and clearly
understand the Assessment requirements and the expectations of the Assessor.
You may be required to demonstrate knowledge and skills which Assessor may
need to observe. If so, an Observation sheet is supplied which will allow the
knowledge or skill to be verified by your Assessor.
Explanations are given for each Task. If you have any questions, consult with
your Assessor. The assessment tasks may be answered using your business, the
simulated business or a mixture of both as instructed by your Assessor.
Task 2 ‒ Practical: Project
Task 3 ‒ Written
Before you commence your Assessment, ensure that you have good knowledge
of the subject, have thoroughly read your Learner Resource, and clearly
understand the Assessment requirements and the expectations of the Assessor.
You may be required to demonstrate knowledge and skills which Assessor may
need to observe. If so, an Observation sheet is supplied which will allow the
knowledge or skill to be verified by your Assessor.
Explanations are given for each Task. If you have any questions, consult with
your Assessor. The assessment tasks may be answered using your business, the
simulated business or a mixture of both as instructed by your Assessor.
Task A – Questioning
You are required to respond to a series of short-answer questions to gain the knowledge
to implement and manage a project’s scope. Refer to your learning resources to inform
your answers.
Assessment Task 1 – Questioning
Q1:
1. List the factors that may impact the project scope.
Finance
Employees
Budget
2. Explain why these factors could impact the scope of the project.
There is need of having sufficient funds which will help in managing the work or
project effectively.
Q2:
Outline how work outcomes and progress could be measured.
The outcomes of work will help to manage all project activities properly.
Q3:
a) Describe how the work breakdown structure (WBS) could be segmented and
documented.
WBS is used for managing different project activities.
b) What would be the benefit of segmenting and documenting WBS?
You are required to respond to a series of short-answer questions to gain the knowledge
to implement and manage a project’s scope. Refer to your learning resources to inform
your answers.
Assessment Task 1 – Questioning
Q1:
1. List the factors that may impact the project scope.
Finance
Employees
Budget
2. Explain why these factors could impact the scope of the project.
There is need of having sufficient funds which will help in managing the work or
project effectively.
Q2:
Outline how work outcomes and progress could be measured.
The outcomes of work will help to manage all project activities properly.
Q3:
a) Describe how the work breakdown structure (WBS) could be segmented and
documented.
WBS is used for managing different project activities.
b) What would be the benefit of segmenting and documenting WBS?
It is easy to manage all project activities and monitor them effectively for proper
management by using WBS.
Q4:
a) Explain what formal change-control processes are.
All board members are informed about change needed in the organisation for proper
management of activities.
b) Why is having a formal process for controlling change important?
Having a formal process helps to control and monitor activities more efficiently.
Q5:
List and describe the common components of a scope-management plan.
Scope definition. ...
Budgets and resources. ...
Stakeholders. ...
Requirements management. ...
Scope statement. ...
Deliverables. ...
Informational management.
Q6:
a) What business and project areas should be involved in the project life cycle
Initiation
Maturity
management by using WBS.
Q4:
a) Explain what formal change-control processes are.
All board members are informed about change needed in the organisation for proper
management of activities.
b) Why is having a formal process for controlling change important?
Having a formal process helps to control and monitor activities more efficiently.
Q5:
List and describe the common components of a scope-management plan.
Scope definition. ...
Budgets and resources. ...
Stakeholders. ...
Requirements management. ...
Scope statement. ...
Deliverables. ...
Informational management.
Q6:
a) What business and project areas should be involved in the project life cycle
Initiation
Maturity
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Completion
End of the project
b)
c) Explain why scope management is significant.
It helps to manage the project value
Q7:
Outline the roles and responsibilities of the project manager in relation to project planning.
Properly communicate the project
Implement project activity
Q8:
Identify the types of project initiation documentation (e.g. Feasibility study, etc.) and what
does it contain?.
Feasibility study
Risk management
Scope management
Q9:
a) Explain the procedures used for reporting change to the project scope.
The report change is initiated by informing seniors about the loop holes present in the
organisation for completing the project successfully. Initially, budget is focused upon for
implementing change in the organisation.
b) In which Plan would you find the procedure for reporting the scope change?
Project management plan is successful by managing all the project activities properly.
End of the project
b)
c) Explain why scope management is significant.
It helps to manage the project value
Q7:
Outline the roles and responsibilities of the project manager in relation to project planning.
Properly communicate the project
Implement project activity
Q8:
Identify the types of project initiation documentation (e.g. Feasibility study, etc.) and what
does it contain?.
Feasibility study
Risk management
Scope management
Q9:
a) Explain the procedures used for reporting change to the project scope.
The report change is initiated by informing seniors about the loop holes present in the
organisation for completing the project successfully. Initially, budget is focused upon for
implementing change in the organisation.
b) In which Plan would you find the procedure for reporting the scope change?
Project management plan is successful by managing all the project activities properly.
c) What should be reported when changing the scope of the project?
The scope of project includes enhancing sales and profits. That is why, it is essential to
focus upon this in order to complete succession in project.
Q10:
What tools could be used to manage the project scope?
Work break down structure
Gantt Chart
Quantitative tools
The scope of project includes enhancing sales and profits. That is why, it is essential to
focus upon this in order to complete succession in project.
Q10:
What tools could be used to manage the project scope?
Work break down structure
Gantt Chart
Quantitative tools
Assessment Task 2 – Project
Using the Pedal Power case study, identify the potential issues that could occur when
managing the scope of the project. You are required to create a draft project
authorisation procedure document, gain approval for the procedure and then document a
Simulated Workplace Scenario with the client. In the process, you gain consensus to start
the project and outline the schedule of tasks.
Scenario 1
After a successful time heading up the rectification of a number of major problems with
OzMarket Consulting’s major client, management have finally discovered your potential.
Your direct manager, Robert, has approached you and advised you of your promotion to a
newly created position, a roving project manager. From now on, you are the one they will
rely on. You will be sent in when things aren’t right and won’t come out till they are fixed.
OzMarket has sent you to Pedal Power, a small local gym that up until now has focused on
bike related fitness programs. They now want to widen the services and equipment on offer
to their clients, but aren’t sure what services to include. The management team for Pedal
Power is divided over:
a) Treadmills
b) Elliptical trainers
c) Stair climbers
d) Hula hoops
e) Exercise classes
f) Expansion of the premises
g) All of the above
The management of Pedal Power is unusual in that all five members of the management
team have equal say, rights and power within the business and all five of them are going to
be taking an active role in the development project. The members of the team are Annalise,
Using the Pedal Power case study, identify the potential issues that could occur when
managing the scope of the project. You are required to create a draft project
authorisation procedure document, gain approval for the procedure and then document a
Simulated Workplace Scenario with the client. In the process, you gain consensus to start
the project and outline the schedule of tasks.
Scenario 1
After a successful time heading up the rectification of a number of major problems with
OzMarket Consulting’s major client, management have finally discovered your potential.
Your direct manager, Robert, has approached you and advised you of your promotion to a
newly created position, a roving project manager. From now on, you are the one they will
rely on. You will be sent in when things aren’t right and won’t come out till they are fixed.
OzMarket has sent you to Pedal Power, a small local gym that up until now has focused on
bike related fitness programs. They now want to widen the services and equipment on offer
to their clients, but aren’t sure what services to include. The management team for Pedal
Power is divided over:
a) Treadmills
b) Elliptical trainers
c) Stair climbers
d) Hula hoops
e) Exercise classes
f) Expansion of the premises
g) All of the above
The management of Pedal Power is unusual in that all five members of the management
team have equal say, rights and power within the business and all five of them are going to
be taking an active role in the development project. The members of the team are Annalise,
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Anton, Harold, James and Jessie. When you watch them, you realise they bicker and argue
quite a lot, but seem able to come to reasonable decisions if given the chance to have their
say about everything.
Task 1
Identify the potential problems that may be encountered when managing the scope of this
project (don’t forget the normal everyday problems that can occur on projects).
Once identified, create a short report that you will send to Robert that outlines how these
potential problems could impact the project.
There are different problems which management of pedal power is facing while focusing
upon introducing new equipment’s in the gym. Some of the problems are mentioned below:
Management of different gym equipment: When do equipment’s were less, it was easy to
maintain the premises. As there are increase in number of equipment’s, it is not easy to
manage them effectively.
Conflicts among staff members: In pedal power, there are Different areas where conflict
occurs. It is important for the project manager to take care and focus upon initiating start
there are less conflicts and fights among team members.
Increase in responsibilities: as the gym is expanded, there are more responsible Which
have to be performed in gym premises.
quite a lot, but seem able to come to reasonable decisions if given the chance to have their
say about everything.
Task 1
Identify the potential problems that may be encountered when managing the scope of this
project (don’t forget the normal everyday problems that can occur on projects).
Once identified, create a short report that you will send to Robert that outlines how these
potential problems could impact the project.
There are different problems which management of pedal power is facing while focusing
upon introducing new equipment’s in the gym. Some of the problems are mentioned below:
Management of different gym equipment: When do equipment’s were less, it was easy to
maintain the premises. As there are increase in number of equipment’s, it is not easy to
manage them effectively.
Conflicts among staff members: In pedal power, there are Different areas where conflict
occurs. It is important for the project manager to take care and focus upon initiating start
there are less conflicts and fights among team members.
Increase in responsibilities: as the gym is expanded, there are more responsible Which
have to be performed in gym premises.
Scenario 2
You go looking for a project authorisation template on the OzMarket Intranet but cannot
find one. You send a quick email to Robert asking about its whereabouts and are surprised
when you get the following response, “Hmmm, haven’t been asked about them for a while.
I don’t think we have one. Could you create one for me?”
Task 2
Create a draft project authorisation procedure.
The new project focuses upon enhancement in a small local gym. This gym was having
bike related fitness programmes. Now it is being expanded. It will include elliptical trainers,
treadmills, hula hoops, stair climbers and expansion of premises and exercise classes. There
is requirement of properly managing all these activities under the initiated budget.
Remember to use industry appropriate language and formatting.
You go looking for a project authorisation template on the OzMarket Intranet but cannot
find one. You send a quick email to Robert asking about its whereabouts and are surprised
when you get the following response, “Hmmm, haven’t been asked about them for a while.
I don’t think we have one. Could you create one for me?”
Task 2
Create a draft project authorisation procedure.
The new project focuses upon enhancement in a small local gym. This gym was having
bike related fitness programmes. Now it is being expanded. It will include elliptical trainers,
treadmills, hula hoops, stair climbers and expansion of premises and exercise classes. There
is requirement of properly managing all these activities under the initiated budget.
Remember to use industry appropriate language and formatting.
Scenario 3
Getting this project successfully underway is going to require a collaborative miracle.
Especially with the people you have just met. Good negotiation with the various board
members is going to be crucial. Having all of them able to influence and input into the
project may very well lead to major difficulties, particularly as they aren’t sure of the
project goals and deliverables.
What they have decided are the services and equipment they will be widening. They have
chosen “All of the above” (from Scenario 1).
Task 3 – Simulated Workplace Scenario (Trainer to use the observation sheet)
This activity should be done through a verbal interaction to ensure meeting of oral
communication outcomes from the foundation skills.
Your Trainer & Assessor will play the role of 3 of the board members: Annalise, James and
Jessie. Meet with each one individually and during the meetings, negotiate and agree on:
a) Project goals, objectives and boundaries (e.g. Communication, Financial)
b) Measurable project outcomes (deliverables), outputs and benefits
c) Acceptance and understanding of the project outcomes (deliverables)
Once the negotiations are completed, you will need to document all outcomes
9deliverables) and measures .
The project goal is to maximise the customer satisfaction. There is increment of premises
off gym area. Financial analysis is conducted in order to manage the completion of work in
the given money. The measurable project outcome means the level of satisfaction which is
experienced by customers in the new gym.
Scenario 4
You’ve been working with the management of Pedal Power to determine project
governance roles and responsibilities. It has been decided that:
Getting this project successfully underway is going to require a collaborative miracle.
Especially with the people you have just met. Good negotiation with the various board
members is going to be crucial. Having all of them able to influence and input into the
project may very well lead to major difficulties, particularly as they aren’t sure of the
project goals and deliverables.
What they have decided are the services and equipment they will be widening. They have
chosen “All of the above” (from Scenario 1).
Task 3 – Simulated Workplace Scenario (Trainer to use the observation sheet)
This activity should be done through a verbal interaction to ensure meeting of oral
communication outcomes from the foundation skills.
Your Trainer & Assessor will play the role of 3 of the board members: Annalise, James and
Jessie. Meet with each one individually and during the meetings, negotiate and agree on:
a) Project goals, objectives and boundaries (e.g. Communication, Financial)
b) Measurable project outcomes (deliverables), outputs and benefits
c) Acceptance and understanding of the project outcomes (deliverables)
Once the negotiations are completed, you will need to document all outcomes
9deliverables) and measures .
The project goal is to maximise the customer satisfaction. There is increment of premises
off gym area. Financial analysis is conducted in order to manage the completion of work in
the given money. The measurable project outcome means the level of satisfaction which is
experienced by customers in the new gym.
Scenario 4
You’ve been working with the management of Pedal Power to determine project
governance roles and responsibilities. It has been decided that:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Annalise will be the client-project team liaison and will manage communication between
the other board members of Pedal Power and the project team and attend the project
meetings.
Harold will have final authority and control of the budget and is the person to give final
approval to all requests.
The other three members (Anton, James and Jessie) of the Pedal Power team are not
available to assist the project team at this time, but will attend project meetings as time and
schedules allow.
Task 4
Create a letter for the files that outlines the positions and delegates from Pedal Power.
(Letter will need to be written using formal language, Australian Grammar and
punctuation). Remind the Pedal Power board that deviations from these negotiated roles
could impact the management of the project.
Develop a formal process that will apply when changes (Change control Procedure)
are to be made and include this in the letter so all the board members are aware of it.
To
The board members
It is to inform all the board members that the decision for new gym equipments and
enhancing the premises is very beneficial for the company. On the other hand, there is
requirement of focusing upon communicational channel of the company as there are very
loopholes found in them. There are several staff members who are not performing their job
roles properly. Communication is the key factor for any successful project and in this Jim,
people are not aware about their duties and job roles which they have to perform in order to
have successful projects. That is why it is requested from you to focus upon this issue and
resolve it as soon as possible.
Scenario 5
After much discussion, the Pedal Power team have decided to:
the other board members of Pedal Power and the project team and attend the project
meetings.
Harold will have final authority and control of the budget and is the person to give final
approval to all requests.
The other three members (Anton, James and Jessie) of the Pedal Power team are not
available to assist the project team at this time, but will attend project meetings as time and
schedules allow.
Task 4
Create a letter for the files that outlines the positions and delegates from Pedal Power.
(Letter will need to be written using formal language, Australian Grammar and
punctuation). Remind the Pedal Power board that deviations from these negotiated roles
could impact the management of the project.
Develop a formal process that will apply when changes (Change control Procedure)
are to be made and include this in the letter so all the board members are aware of it.
To
The board members
It is to inform all the board members that the decision for new gym equipments and
enhancing the premises is very beneficial for the company. On the other hand, there is
requirement of focusing upon communicational channel of the company as there are very
loopholes found in them. There are several staff members who are not performing their job
roles properly. Communication is the key factor for any successful project and in this Jim,
people are not aware about their duties and job roles which they have to perform in order to
have successful projects. That is why it is requested from you to focus upon this issue and
resolve it as soon as possible.
Scenario 5
After much discussion, the Pedal Power team have decided to:
a) Expand the premises with a large addition to the back of the premises
b) Purchase and install all suggested equipment
c) Create a schedule of classes and employ staff to run the classes
Task 5
Using these three goals, create an outline and schedule of tasks and activities that will need
to be completed. (HINT: Use a Work Breakdown Structure where possible)
Once you have completed the outline, create a request for authorisation to expend money
and resources to get the project started.
Add the outline and schedule of tasks and request for authorisation to the portfolio.
Finally, after discussing with the management about the new project, there are three
activities which have to be initiated in the gym which includes expanding premises with
addition to back off the premises. There will be purchasing and installing of various
equipment’s of gyms. Proper schedule will be prepared for the training classes and staff
will be hired for this.
b) Purchase and install all suggested equipment
c) Create a schedule of classes and employ staff to run the classes
Task 5
Using these three goals, create an outline and schedule of tasks and activities that will need
to be completed. (HINT: Use a Work Breakdown Structure where possible)
Once you have completed the outline, create a request for authorisation to expend money
and resources to get the project started.
Add the outline and schedule of tasks and request for authorisation to the portfolio.
Finally, after discussing with the management about the new project, there are three
activities which have to be initiated in the gym which includes expanding premises with
addition to back off the premises. There will be purchasing and installing of various
equipment’s of gyms. Proper schedule will be prepared for the training classes and staff
will be hired for this.
Observation Checklist
During the observation, did student satisfactorily demonstrate ability to:
Participate in discussions and negotiations using clear language and appropriate non-
verbal features
Use active listening and questioning to elicit views and opinions of others
Identify and use appropriate conventions and protocols when communicating with
diverse stakeholders
Collaborate with others to achieve joint outcomes, playing an active role in negotiating
and facilitating agreement
Participate to establish and identify project boundaries
Participate to establish measureable project benefits, outcomes and outputs
Ensure a shared understanding of the outcomes is reached
Work collaboratively to achieve goals
During the observation, did student satisfactorily demonstrate ability to:
Participate in discussions and negotiations using clear language and appropriate non-
verbal features
Use active listening and questioning to elicit views and opinions of others
Identify and use appropriate conventions and protocols when communicating with
diverse stakeholders
Collaborate with others to achieve joint outcomes, playing an active role in negotiating
and facilitating agreement
Participate to establish and identify project boundaries
Participate to establish measureable project benefits, outcomes and outputs
Ensure a shared understanding of the outcomes is reached
Work collaboratively to achieve goals
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Assessment Task 3 – Written Tasks
You are required to create a scope management plan for Pedal Power. In the process, you
create documentation for the implementation plan and change control procedures and create
a project schedule with measurable outcomes. Document any changes to the scope
management plan as the project is underway and complete an end of project report
documenting the outcomes of the project’s scope management plan.
Scenario 1:
All your hard work negotiating with the board of Pedal Power has paid off and now you and
the Pedal Power team are ready to start the redevelopment project. All you need to do is
establish the documentation and timelines to ensure everything is going to be achieved on
time and on budget.
Annalise comes into the project office and asks “Do we have anything written down about
the scope and boundaries of the project?”
You tell her you’re currently working on the scope management plan and will get a copy to
her as soon as it is completed.
Task 1
Using the information above and from the previous activities, create a scope management
plan for the development of the Pedal Power Expansion Project. You could use below
template, if required.
Scenario 2
The scope management plan has been accepted by the Pedal Power Board and the project is
ready to commence.
Task 2:
Create the following documents:
You are required to create a scope management plan for Pedal Power. In the process, you
create documentation for the implementation plan and change control procedures and create
a project schedule with measurable outcomes. Document any changes to the scope
management plan as the project is underway and complete an end of project report
documenting the outcomes of the project’s scope management plan.
Scenario 1:
All your hard work negotiating with the board of Pedal Power has paid off and now you and
the Pedal Power team are ready to start the redevelopment project. All you need to do is
establish the documentation and timelines to ensure everything is going to be achieved on
time and on budget.
Annalise comes into the project office and asks “Do we have anything written down about
the scope and boundaries of the project?”
You tell her you’re currently working on the scope management plan and will get a copy to
her as soon as it is completed.
Task 1
Using the information above and from the previous activities, create a scope management
plan for the development of the Pedal Power Expansion Project. You could use below
template, if required.
Scenario 2
The scope management plan has been accepted by the Pedal Power Board and the project is
ready to commence.
Task 2:
Create the following documents:
a) Implementation plan
b) Change control procedures
c) Schedule/timeline for works and activities
d) Measurable outcomes and an explanation of how the outcomes will be measured
The implementation plan for the changes that will be brought on by the Pedal Power as part
of this project are as follows.
Required
actions
Key
performance
indicators
Strategic
objectives
Training and
development
Project
timeline
Premise
expansion
Infrastructural
capabilities,
working
capacity
To make the
gym premises
bigger and
more luxurious
To be provided
using scope and
project
planning
collaterals
4 months
Equipment
purchase
Customer
feedback and
gym quality
To provide a
better
experience to
the customers
with heavy
training options
Gym trainers
and fitness
experts to be
trained for
spotting and
exercising on
new machines
2 weeks
Staff classes Customer
engagement
Providing more
options to the
public for more
engagement
The classes will
include yoga,
Zumba and
boxing and
each will have
two specialists
hired
2 months
b) Change control procedures
c) Schedule/timeline for works and activities
d) Measurable outcomes and an explanation of how the outcomes will be measured
The implementation plan for the changes that will be brought on by the Pedal Power as part
of this project are as follows.
Required
actions
Key
performance
indicators
Strategic
objectives
Training and
development
Project
timeline
Premise
expansion
Infrastructural
capabilities,
working
capacity
To make the
gym premises
bigger and
more luxurious
To be provided
using scope and
project
planning
collaterals
4 months
Equipment
purchase
Customer
feedback and
gym quality
To provide a
better
experience to
the customers
with heavy
training options
Gym trainers
and fitness
experts to be
trained for
spotting and
exercising on
new machines
2 weeks
Staff classes Customer
engagement
Providing more
options to the
public for more
engagement
The classes will
include yoga,
Zumba and
boxing and
each will have
two specialists
hired
2 months
This project scope and implementation plan will feature a lot of different activities which
have been planned accordingly using a scheduling of important activities along with their
associated timelines.
Activities Deliverables Timeline
Back office extension More work floor and
workout space
1 month
Gym area increment More spacious and divers
environment
1 month
Making a list of equipment
purchases
Logistics data 2 days
Installing the equipment on
the gym floor
Better gym experience and
heavy workout utility
5 days
Developing weekday
schedule of classes
A list of which classes will
run on what days
1 week
Hiring and training class
personnel
Assigning two proficient
trainers in their respective
classes
2 months
The project scope statement includes deliverables of project and they work which is
important for creation of the deliverables. The project scope statement consists of following
components in context of pedal power brand:
Product scope: this means completing and accomplishing the project. In context of pedal
power brand, knew gym equipment’s will be initiated in the premises. The area of gym will
be increased in order to make more spacious gym. It will help in attracting a lot of
customers towards the gym.
product acceptance criteria: this means managing the gym equipment’s and providing a
wider section for customers where they can have training sessions as well as gaming area. D
have been planned accordingly using a scheduling of important activities along with their
associated timelines.
Activities Deliverables Timeline
Back office extension More work floor and
workout space
1 month
Gym area increment More spacious and divers
environment
1 month
Making a list of equipment
purchases
Logistics data 2 days
Installing the equipment on
the gym floor
Better gym experience and
heavy workout utility
5 days
Developing weekday
schedule of classes
A list of which classes will
run on what days
1 week
Hiring and training class
personnel
Assigning two proficient
trainers in their respective
classes
2 months
The project scope statement includes deliverables of project and they work which is
important for creation of the deliverables. The project scope statement consists of following
components in context of pedal power brand:
Product scope: this means completing and accomplishing the project. In context of pedal
power brand, knew gym equipment’s will be initiated in the premises. The area of gym will
be increased in order to make more spacious gym. It will help in attracting a lot of
customers towards the gym.
product acceptance criteria: this means managing the gym equipment’s and providing a
wider section for customers where they can have training sessions as well as gaming area. D
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
criteria depends upon the workout time and visibility which a customer requires in a gym.
Project deliverables: these include time, cost, risk, resources
Project exclusion: this gym is providing an attractive premise for people where they can
have training and gym properly. This is the most attractive thing which pedal power is
adopting.
project constraints: these are involved in limiting resources like money, time, equipment,
capital, manpower. Budget is initiated by the board of members and one month is provided
to start the new gym premises. It is also being taken care that manpower and staff involved
in gym are having efficient skills.
Project assumption : there are different stakeholders as well as team members who are
involved in completing the project. It is taken care that they are working efficiently for
completing the project.
Scenario 3
Harold and Annalise come into your office and take a seat.
Harold speaks enthusiastically about a party he and Annalise went to over the weekend and
they both realised having a swimming pool would be a great thing to include in the
development.
“How can we make it happen?” Annalise asks. As you explain the change control
arrangements, Annalise and Harold tell you to make the adjustments. Pedal Power is going
to have a pool!
Task 3:
Create an adjustment to the scope using the change control procedures developed
previously.
Create an outline to be sent to Pedal Power that shows the adjustments to the timeline for
deliverables, the adjustment to the costs (use basic estimates from your local area for the
Project deliverables: these include time, cost, risk, resources
Project exclusion: this gym is providing an attractive premise for people where they can
have training and gym properly. This is the most attractive thing which pedal power is
adopting.
project constraints: these are involved in limiting resources like money, time, equipment,
capital, manpower. Budget is initiated by the board of members and one month is provided
to start the new gym premises. It is also being taken care that manpower and staff involved
in gym are having efficient skills.
Project assumption : there are different stakeholders as well as team members who are
involved in completing the project. It is taken care that they are working efficiently for
completing the project.
Scenario 3
Harold and Annalise come into your office and take a seat.
Harold speaks enthusiastically about a party he and Annalise went to over the weekend and
they both realised having a swimming pool would be a great thing to include in the
development.
“How can we make it happen?” Annalise asks. As you explain the change control
arrangements, Annalise and Harold tell you to make the adjustments. Pedal Power is going
to have a pool!
Task 3:
Create an adjustment to the scope using the change control procedures developed
previously.
Create an outline to be sent to Pedal Power that shows the adjustments to the timeline for
deliverables, the adjustment to the costs (use basic estimates from your local area for the
installation of a pool) and any quality impacts and constraints.
Submit the adjustments and changes to your Trainer & Assessor as they will act as
Harold, the person authorised to approve the change. Once you receive the approval, the
change needs to be communicated and included in the project scope and project timelines.
Ensure you make the changes to the final scoping document and timelines.
The pedal power will initiate running off gym after a month with new equipment’s.
Different staff will be hired for taking care of each equipment and providing support to
clients.
there will be proper schedule in which clients will be provided different time for gaming
formal training and attending sessions.
measuring outcomes Will depend upon the number of happy and satisfied customers.
The scope management plan will be changed in the following manner after the demand for
the project to include a pool has been made and it has been listed herein.
New project
activities
Potential
quality
impacts
Risks involved Budgetary
constraints
Timeline
Inclusion of a
large scale
swimming pool
The project can
get delayed and
it profitability
might decrease
The pool might
cause accidents
and the water
purification
system might
not be adequate
The cost should
come around to
1.5 to 3.0
million
Pakistan rupees
1.5 months
Scenario 4
You have finalised the project and Pedal Power is happy with the results. The following
problems are listed on the issues logs:
Submit the adjustments and changes to your Trainer & Assessor as they will act as
Harold, the person authorised to approve the change. Once you receive the approval, the
change needs to be communicated and included in the project scope and project timelines.
Ensure you make the changes to the final scoping document and timelines.
The pedal power will initiate running off gym after a month with new equipment’s.
Different staff will be hired for taking care of each equipment and providing support to
clients.
there will be proper schedule in which clients will be provided different time for gaming
formal training and attending sessions.
measuring outcomes Will depend upon the number of happy and satisfied customers.
The scope management plan will be changed in the following manner after the demand for
the project to include a pool has been made and it has been listed herein.
New project
activities
Potential
quality
impacts
Risks involved Budgetary
constraints
Timeline
Inclusion of a
large scale
swimming pool
The project can
get delayed and
it profitability
might decrease
The pool might
cause accidents
and the water
purification
system might
not be adequate
The cost should
come around to
1.5 to 3.0
million
Pakistan rupees
1.5 months
Scenario 4
You have finalised the project and Pedal Power is happy with the results. The following
problems are listed on the issues logs:
a) Communication issues with Harold and Annalise giving different information and
instructions
b) WBS not clear
c) Product Scope description changed
d) Constraints on the project not defined
e) Concrete over ordered due to calculation errors
f) Exercise equipment dropped during installation, one injury and equipment damaged
OzMarket Consulting policies and procedures require each project manager to create an end
of project report.
Task 4
Create an end of project report that outlines:
a) Issues, problems and solutions encountered throughout the project that related to the
scope of the project
b) How the project manager (you) contributed to the success of the project?
c) What the project manager (you) would do differently in relation to similar projects
The pedal power will be located in area where there are more health conscious people. It
will help in attracting more number of people towards the gym. The new equipment’s will
be helpful in gaining attention of lot of health conscious individuals.
issues with the project include lack of communication. There were different staff members
who were not associated with managing their job role properly from stop that is why it was
not easy to maintain successful implementation of project activities.
I have always tried to focus upon the issues and solving them properly. It is my duty to
manage working abilities of all these staff members and provide them the right opportunity
on the project so that they can work efficiently
instructions
b) WBS not clear
c) Product Scope description changed
d) Constraints on the project not defined
e) Concrete over ordered due to calculation errors
f) Exercise equipment dropped during installation, one injury and equipment damaged
OzMarket Consulting policies and procedures require each project manager to create an end
of project report.
Task 4
Create an end of project report that outlines:
a) Issues, problems and solutions encountered throughout the project that related to the
scope of the project
b) How the project manager (you) contributed to the success of the project?
c) What the project manager (you) would do differently in relation to similar projects
The pedal power will be located in area where there are more health conscious people. It
will help in attracting more number of people towards the gym. The new equipment’s will
be helpful in gaining attention of lot of health conscious individuals.
issues with the project include lack of communication. There were different staff members
who were not associated with managing their job role properly from stop that is why it was
not easy to maintain successful implementation of project activities.
I have always tried to focus upon the issues and solving them properly. It is my duty to
manage working abilities of all these staff members and provide them the right opportunity
on the project so that they can work efficiently
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
In future projects, I will focus more upon time management as in the pedal power project
there was less time in establishing the success rate.
there was less time in establishing the success rate.
1 out of 20
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.