Case Study of Perth Stadium Construction Project Management
VerifiedAdded on 2023/06/03
|12
|827
|313
AI Summary
This presentation is a case study of the construction project management of Perth Stadium, a multi-purpose sports and indoor entertainment venue in Perth, Western Australia. It covers the scope, cost, issues, and lessons learned from the project. The project aimed to provide better comfort and view for the audiences, manage the space for 14000 audiences without hampering comfort, keep smooth entry and exit, and manage the entire construction of the project. The presentation is relevant to the subject of Project Management and the course code 8427 Post Graduate.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project Management
8427 Post Graduate
1
Students will research, analyses and present a case study of a documented
project of their choice, identifying the scope, cost and issues experienced by
the project. Students will distil lessons to be learned from the case study and
share these with the class in a presentation of approximately 8-12 mins. A
template, examples and guidance will be provided on UCLearn. Students will
need to nominate a class in which to present by week 2 or a slot will be
allocated.
8427 Post Graduate
1
Students will research, analyses and present a case study of a documented
project of their choice, identifying the scope, cost and issues experienced by
the project. Students will distil lessons to be learned from the case study and
share these with the class in a presentation of approximately 8-12 mins. A
template, examples and guidance will be provided on UCLearn. Students will
need to nominate a class in which to present by week 2 or a slot will be
allocated.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
[Case Study]
Brief Description: It is a multi-purpose and under
construction sports and indoor entertainment venue
that has been started in 2012. This project will allow to
have some distance gap between the seating
arrangements and facilities for the audience ranging
between 5000 and 14000 people. The DHW
(Department of Housing) is responsible for planning,
scoping, and delivery of a sophisticated plan that is
feasible and effective enough for the management and
delivery of the entire project.
2
Brief Description: It is a multi-purpose and under
construction sports and indoor entertainment venue
that has been started in 2012. This project will allow to
have some distance gap between the seating
arrangements and facilities for the audience ranging
between 5000 and 14000 people. The DHW
(Department of Housing) is responsible for planning,
scoping, and delivery of a sophisticated plan that is
feasible and effective enough for the management and
delivery of the entire project.
2
Objective/Driver/Problem
To allow better comforts
To allow audiences having better view
To manage the space for 14000 audiences
without hampering comfort
Keep smooth entry and exit
Manage the entire construction of the project
3
To allow better comforts
To allow audiences having better view
To manage the space for 14000 audiences
without hampering comfort
Keep smooth entry and exit
Manage the entire construction of the project
3
Background
• The Perth stadium is a multipurpose stadium
in Perth, Western Australia
• Estimated capacity for the stadium will be
60,000
• It will allow the audiences to have better and
comfortable space
• Better and sophisticated entry and exit
4
• The Perth stadium is a multipurpose stadium
in Perth, Western Australia
• Estimated capacity for the stadium will be
60,000
• It will allow the audiences to have better and
comfortable space
• Better and sophisticated entry and exit
4
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Scope / Product
• A description of the work or product
– Perth will allow accommodation of about 60,000 people
that can also be extended to 65,000 audiences in single
time
– It will be applicable for the football and cricket grounds
– Seating arrangements will be comfortable
• Where there options for a solution?
– A wide stadium or biggest stadium will allow more
audiences to have benefit of viewing the arena from a
single platform
5
• A description of the work or product
– Perth will allow accommodation of about 60,000 people
that can also be extended to 65,000 audiences in single
time
– It will be applicable for the football and cricket grounds
– Seating arrangements will be comfortable
• Where there options for a solution?
– A wide stadium or biggest stadium will allow more
audiences to have benefit of viewing the arena from a
single platform
5
Requirements / Products
• Architecture and Design – The design of the stadium
is oval but it is able to accommodate around 70,000
people seating in rectangular mode.
• Food and amenities – There are over 50 food and
beverage outlets serving all over the stadium along
with 650 CCTV cameras for surveillance.
• Transport – Six platform railway station and 22 stand
bus station that are located nearby helps the visitors
to easily travel from any place.
6
• Architecture and Design – The design of the stadium
is oval but it is able to accommodate around 70,000
people seating in rectangular mode.
• Food and amenities – There are over 50 food and
beverage outlets serving all over the stadium along
with 650 CCTV cameras for surveillance.
• Transport – Six platform railway station and 22 stand
bus station that are located nearby helps the visitors
to easily travel from any place.
6
Project details
• Cost: The proposed cost for the stadium construction
was around 700 Million dollars and 300 Million
dollars was allocated for public transport works.
However, in an inquiry by the state government it
was found that the actual cost of the project was
$1.8 billion.
• Timeframe: The timeframe for project was from
December 2013 to January 2018.
• Constraints: As identified from the reports, budget
was the major constraint in this project as it
exceeded far more than the estimated budget. 7
• Cost: The proposed cost for the stadium construction
was around 700 Million dollars and 300 Million
dollars was allocated for public transport works.
However, in an inquiry by the state government it
was found that the actual cost of the project was
$1.8 billion.
• Timeframe: The timeframe for project was from
December 2013 to January 2018.
• Constraints: As identified from the reports, budget
was the major constraint in this project as it
exceeded far more than the estimated budget. 7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Process/Activities
• The budget exceeded far more than the
estimate of 700 Million dollar as it took $1.8
billion to complete the project.
• The project was completed well within
estimated time and it was opened in the
desired time of January 2018.
8
• The budget exceeded far more than the
estimate of 700 Million dollar as it took $1.8
billion to complete the project.
• The project was completed well within
estimated time and it was opened in the
desired time of January 2018.
8
Lessons to Learn
From the project, the following points has been
learnt:
• Proper budgeting has to be done before
progressing.
• Constant monitoring have to be done for
budget and time in terms of progress.
• Proper allocation of resources is required to
ensure successful completion of project.
9
From the project, the following points has been
learnt:
• Proper budgeting has to be done before
progressing.
• Constant monitoring have to be done for
budget and time in terms of progress.
• Proper allocation of resources is required to
ensure successful completion of project.
9
Result
• The completed stadium arena with a capacity
of 60,000 people was being delivered from
this project.
• The project was on time and met the
requirements but it was unable to meet the
budget as it exceeded from $700 Million to
$1.8 billion.
10
• The completed stadium arena with a capacity
of 60,000 people was being delivered from
this project.
• The project was on time and met the
requirements but it was unable to meet the
budget as it exceeded from $700 Million to
$1.8 billion.
10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Bibliography/Further reading
• Banihashemi, S., Hosseini, M.R., Golizadeh, H. and Sankaran, S., 2017.
Critical success factors (CSFs) for integration of sustainability into
construction project management practices in developing
countries. International Journal of Project Management, 35(6), pp.1103-
1119.
• Ibrahim, S. and ShaNantu, W.M., 2016. A Conceptual FrameworN and a
Mathematical Equation for Managing Construction-Material Waste and
Cost Overruns. International Journal of Social, Behavioral, Education,
Economic, Business and Industrial Engineering, 10(2), pp.587-593.
• Lock, D., 2016. Project management in construction. Routledge.
• Zhou, Z., Irizarry, J. and Lu, Y., 2018. A Multidimensional Framework for
Unmanned Aerial System Applications in Construction Project
Management. Journal of Management in Engineering, 34(3), p.04018004.
11
• Banihashemi, S., Hosseini, M.R., Golizadeh, H. and Sankaran, S., 2017.
Critical success factors (CSFs) for integration of sustainability into
construction project management practices in developing
countries. International Journal of Project Management, 35(6), pp.1103-
1119.
• Ibrahim, S. and ShaNantu, W.M., 2016. A Conceptual FrameworN and a
Mathematical Equation for Managing Construction-Material Waste and
Cost Overruns. International Journal of Social, Behavioral, Education,
Economic, Business and Industrial Engineering, 10(2), pp.587-593.
• Lock, D., 2016. Project management in construction. Routledge.
• Zhou, Z., Irizarry, J. and Lu, Y., 2018. A Multidimensional Framework for
Unmanned Aerial System Applications in Construction Project
Management. Journal of Management in Engineering, 34(3), p.04018004.
11
Questions 12
1 out of 12
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.