COMPETENCYDEMONSTRATION REPORTCareer Episode 2NAME
Competency Demonstration Report: Development of Security_1
CE 2.1 Project InformationName of the project: King Abdullah Bin Abdul-Aziz Development of Security HeadQuarters KAP-1(In KSA)Location of the project: Saudi Arabia, RiyadhProject Duration: August 2013 to June 2015Organization: Saudi OGER CompanyRole and Designation during the time: Electrical EngineerCE 2.2 Project BackgroundCE 2.2.1 Characteristics of the projectThe project was based on the development procedures of the Security Head Quarters inthe Riyadh location of Saudi Arabia. There are total number of 304 sites all around the kingdomof Saudi Arabia. I was provided with the task of looking after the development procedure of twoof the sites of the project. I was in charge of site number 182 and site number 304. The two sitesconsisted of the Deportation Administration, male and female tank, Forensics Laboratory, watertreatment plant, main kitchen and laundry, male and female clinic, finger print building,generator room, fuel oil pump system, fire suppression system. For the completion of thecomplete project I was provided with a team of 5 foreman and 25 labours. The team was anexpert in the management of the electromechanical procedures of the working environment.
Competency Demonstration Report: Development of Security_2
CE 2.2.2 Objectives developed for the projectWhile I was working for the development of the report I had developed the followingobjectives for the completion of the project:To design and calculate the different systems that are to be implemented in the sites.To issue different drawing mechanism for all the electrical works.To estimate and assign different tools in different department of the electrical workingTo overview all the electrical and telecommunication works at the sites. To ensure the compliance to the company safety rules and regulations are strictly observedthrough proper supervision.To ensure that the job is completed within the budgeted time and cost.CE 2.2.3 My area of workI was responsible for the upgrading all the different electrical systems and the poweringsystem of the sites. I had followed the ARC and ID drawing for the process of implementing theelectrical systems. The electrical systems consisted of Earthing, lighting and power calculationand short circuit calculation for the implementation of the correct procedure for the electricalsystem to be completed. I was responsible for the modification of electrical drawings as per thesite conditions and following the client’s requirements. I had taken into consideration the costs,safety and time constraints for the completion of the project. I had studied and revised theelectrical drawing to ensure the installation and operations confirm to NEC, SBC and SASO.
Competency Demonstration Report: Development of Security_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Competency Demonstration Report - PDF
|9
|1791
|116

Assignment on Competency Element
|6
|1669
|236

Competency Demonstration Report- Career Episode 2
|8
|1621
|200

Competency Demonstration Report- Episode 3
|7
|1519
|154

Construction of Abu Baker Siddiq Road Phase
|7
|1612
|310

Project Information Assignment PDF
|7
|1778
|20