logo

Professional Engineering Assignment

13 Pages2683 Words254 Views
   

Added on  2019-10-31

Professional Engineering Assignment

   Added on 2019-10-31

ShareRelated Documents
SUMMARY STATEMENTAHMAD SEYER
Professional Engineering Assignment_1
Professional Engineering: Summary StatementCompetency ElementA brief summary of how you have applied the elementParagraph number in the career episode(s) where the element is addressedPE 1 KNOWLEDGE AND SKILL BASEPE1.1 Comprehensive, theory based understanding of the underpinning natural and physical sciences and the engineering fundamentals applicable to the engineering discipline.I) The Sorptivity is a sample parameter which is recently being used in the measurement of the concrete resistance to the exposure to the environmental factors.II)During the development of the project study I found that most of the bridge piers accidents had been caused due to the large shear force along with the bending of the piers.III)The modern form of elliptical cellular beam has the web openings in the form of Career Episode 1: CE 1.2.1, CE1.3.1 and CE 1.3.2Career Episode 2: CE 2.3.1 andCE 2.3.3Career Episode 3: CE 3.2.1, CE3.3.1 and CE 3.3.2
Professional Engineering Assignment_2
elliptical configurationsPE1.2 Conceptual understanding of the mathematics, numerical analysis, statistics, and computer and information sciences which underpin the engineering discipline.I) The materials which had been used for the development of the project are fly ash which is the main supplementary product, cement, coarse aggregate, fine aggregate, and water.II)The capacities were based ontwo different failure planes based on resisting forces.III), I had performed the nonlinear finite element analysiswith the help of the commercial software package, ANSYS ver.R14.5 program with the inclusion of both the geometric and material nonlinearitiesCareer Episode 1: CE 1.3.1Career Episode 2: CE 2.3.2, CE2.3.3 and CE 2.3.4Career Episode 3: CE 3.3.1PE1.3 In-depth understanding of specialistbodies of knowledge withinthe engineering disciplineI) These are produced from Basalt rocks and the elongation factors of the particles are maintained below the level of 15%.Career Episode 1: CE 1.3.1Career Episode 2: CE 2.3.1, CE
Professional Engineering Assignment_3
II)The major problem arises when the shear capacity of the pier get exceeded by the force ofthe collision from the trucks.III) I found the Young’s modulus, Poisson ratio and otherfor the material which I was using, 2.3.4, CE 2.2.5 and CE 2.4.2Career Episode 3: CE 3.3.1, CE3.3.3PE1.4 Discernment of knowledge development and research directions within the engineering disciplineI) I was responsible for the calculation and the researching the cement blocks created using different proportions of compounds to find the results of the water absorption test and theSorptivity test on the cement blocks.II)I had been found that the shear force calculated was similar to the shear force which was applicable on the accident case studies.III)I had verified the finite Career Episode 1: CE 1.2.5, CE1.3.1 and CE 1.4.2 Career Episode 2: CE 2.3.2, CE2.3.4 and CE 2.4.1Career Episode 3: CE 3.3.2, CE3.3.3 and CE 3.4.1
Professional Engineering Assignment_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Professional Engineering Assignment - (Doc)
|14
|3035
|206

Summary Statement: Competency Element
|12
|2649
|50

Professional Engineering: Summary Statement
|13
|2708
|466

Assignment on Professional Engineering
|13
|2753
|149

Introduction to Professional Engineering
|13
|2918
|194

Report on Professional Engineering
|13
|2878
|30