12-Week Placement Report: Electrical Engineering at Alnassr Irons

Verified

Added on  2022/09/03

|10
|3890
|18
Report
AI Summary
This report provides a comprehensive overview of a 12-week placement at Alnassr Irons Company, focusing on the practical application of electrical engineering principles. The placement began with an introduction to the company's mission, vision, and organizational structure, including its policies and guidelines. The student gained experience in various aspects of electrical projects, including project planning, execution, and completion, and learned about the responsibilities of an engineer. The report details the student's involvement in different departments, understanding the company's pay structure, and the development of skills essential for the electrical engineering field. It highlights the importance of teamwork, safety regulations, and ethical behaviors within the company. The student also contributed to project recommendations and gained insights into the company's commitment to employee development, community involvement, and the importance of diversity in the workplace.
Document Page
Placement at Alnassr Irons company
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Introduction
All throughout my 12 weeks placement at alnassr Irons company, I was fortunate enough for
getting a chance to experience prevailing and new concepts associated with the field of
engineering and gained knowledge related to several different aspects that are related to
electrical projects, the standard procedure of how exactly a project is actually planned, built
and finished along with the amount of efforts and details required for every phase. Moreover,
other important lesson I have learned throughout these 12 weeks, were the several diverse
kinds of work an Engineer needs to carry out that in turn, have offered me with great
overview of different kinds of responsibilities and roles, which I could carry out being an
Engineer. Further, the below sections throw light upon my learning all through the period of
12 weeks of placement in great detail.
Week 1
The first week of my placement at alnassr Irons Company involved welcome of trainees and
overview of the company. All the trainees were acquainted with the Mission, Vision and the
objectives of specified work area. The vision of the company is to offer the best quality
product, result in no needless harm, utilize business for inspiring and implementing solutions
towards the environmental crisis. The mission of the company is to ensure superior health
and wellbeing for all the people, now as well as for upcoming generations. Then I gained
knowledge about how exactly the particular work area fits within to the wider company. All
the trainees were asked to have a look around the company and view the key operational and
social areas within the company such as offices, labs, catering facilities, bank, library and
others. The main purpose of doing so was to ensure that the candidate completely gets
familiar with the company’s framework and the way it is structured. I was supposed to view
the operations of different key operational and social areas in order to understand how
different departments work and operate. I came to know about the main people leading the
respective areas and responsible for its functioning. The chief purpose was to get familiar
with the people from different department to make sure that the people can be easily
contacted as and when required. Also, it made easy for me to understand the company’s
framework and made them easily approachable. The week also offered a general overview of
company’s policies and guidelines.
Week 2
Document Page
After gaining knowledge related to Mission, Vision and the objectives of specified work area
of the company and also, understanding the company’s framework with complete accuracy,
week 2 involved completing all the paper work and submitting personal documents of the
candidate. It acquainted candidates about the work procedures of the company and how it
operates. It also helped in knowing different divisions along with the people leading them
more precisely. I was provided organizational chart to understand how actually is accountable
for providing information to which department and in what manner. I understood that the
company follows a hierarchical organizational structure with flow of power from top to
bottom. A hierarchical organizational structure basically involves a direct chain of
command flowing from the top to bottom of the company. Top management at alnassr
Irons Company forms all vital decisions that are after that passed down by way of
subsidiary management levels. In case if somebody at the bottom of the organizational
structure wants to form a decision, they then pass the request up via the command chain
for the purpose of approval, for which a judgment would ultimately be returned. A
hierarchical model functions well at alnassr Irons Company for the reason that there are
few products, which are offered in high amount, so that tight control could be maintained
with respect to design, quality, manufacturing as well as distribution of products. There
is a clear career path through alnassr Irons Company, with staff members gradually
progressing through the several management levels over a number of years. Those
attaining top positions tend to have developed good experience with alnassr Irons
Company. For the reason that power is highly centralized, it is quite simple to understand
who is authorized for making a decision.
Week3
The week 2 was mainly focussed towards gaining knowledge about different divisions and
how they work. This week also involved completing the remaining paper work and
submitting personal documents. After gaining knowledge about the functions as well as
procedures of different departments and the way they are linked with each other specially,
now it was time to understand the work and procedures of my department in great detail. The
week provided a chance to know the team members in better way. I came to know about the
team members’ background, qualifications as well as their diverse outlooks. I realized that
the team involved candidates from diverse backgrounds and brought in diverse pool of
expertise within the workplace. This also highlighted towards the company’s acceptance for
Document Page
diverse workforce. At alnassr Irons Company, it is highly believed that diversity plays a
highly important role in ensuring company’s overall success. The company intends to offer
equal opportunities to all regardless of their culture, gender and background. My team
involved 10 members including myself including an equal proportion of both male and
female members. Moreover, the company very well acknowledges the importance and
advantages of diverse workforce. At alnassr Irons Company, it is highly believed that
workforce diversity could bring about a rise in the overall productivity along with
competitive benefits. Employers could provide more solutions to clients due to fresh ideas
and procedures introduced in the company. Workplace diversity also perks up staff morale
and causes them to desire for working more efficiently and effectively. Workforce diversity
also perks up creativity at alnassr Irons Company for the reason that heterogeneous groups
are cross-fertilizing each other in the company. Staff members from diverse backdrops
bring in several solutions on how exactly to accomplish a common objective.
Week 4
After completing week 3 and submitting all the required documents as well as understand the
work and procedures of my department in great detail, it was now time to understand the
main guidelines and policies regulating the company as well as its procedures. I observed that
the company lays high significance on laws and policies regulating the industry in which it
operates. The company lays high significance on safety regulations, employees’ policies,
customer laws and other operational policies as well as guidelines affecting the operations of
the company. Staff members are offered training in particular hazards related to their possible
exposure. This training includes isolation of energy, hazard recognition, connection to
supply, premises wiring, generation, transmission, clearance distances, distribution
installations, usage of personal protective and insulated tools and lastly, emergency practices.
Safety associated work procedures are used for preventing electric shock or other injuries
arising from either direct or indirect electrical contacts. Moreover, safety associated work
procedures are in line with the nature and level of the related electrical hazards. Particular
kinds of work procedures covered through the safety procedure take in functioning with de-
energized parts; functioning with energized parts; vehicular and mechanical tool close to
overhead lines and underground lines; illumination; conductive materials and equipment;
portable Ladders and lastly, housekeeping. Then, the company follows proper policies with
respect to employees’ pay and incentives. The employees are paid fairly considering their
education and responsibility. The company at all times makes sure that it does not harm the
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
environment in which it operates. Also, it intends to offer genuine and superior quality
products as well as services to its clients.
Week 5
After completing week 4 and understanding the main guidelines and policies regulating the
company as well as its procedures, it was now time to understand in great details pay policies
and structure of the company. I acknowledged that the company offers comprehensive
advantages to its employees including competitive salary; pension; bonus; health care
benefits and discounts on services and products. I recognized that the company is incessantly
functioning for ensuring the staff members feel assisted and encouraged within their jobs
while accomplishing exceptional services. Invests towards the development of the people and
supports high performing employees. The company encourages and supports the people for
developing and learning new abilities through several prospects taking in on the job training,
in-house courses as well as the chance for studying formal qualifications. The local society
and surroundings is of high significance for the company. It participates in several
community grounded charity projects along with environmental efforts. Along with corporate
sponsorships as well as donations, the company also encourages the staff members to
volunteer and make maximum contribution possible. The company has in place an extremely
fair pay structure that helps it in deciding the pay for every position and individual.
Employees are paid in a fair manner and obtain additional incentives and rewards for their
additional efforts and outstanding outcomes. The pay structure at the company defines what
every individual and job role is paid on the basis of their importance to the business and
efficiency in their assigned task.
Week 5
After completing week 4 and understanding the main guidelines and policies regulating the
company as well as its procedures, it was now time to understand in great details my
responsibilities and tasks. I was responsible for working closely with several team members
within the team and build a complete understanding related to the work performed and for
developing a good all round understanding related to the company as well as the overall
segment. I was also responsible for working with the team for maintaining or quickly
restoring supplies of electricity during the event of supply systems loss. I was responsible for
working with the team for carrying out fault finding, evaluation, repairs and changes to the
Document Page
conveyance as well as supply systems for ensuring consistency of all equipment. Moreover,
under supervision, I was responsible for carrying out a number of system associated projects
for improving reliability and effectiveness of supply and with respect to the suitable industry
standards. Moving ahead, I also understood that for being effective within electrical segment
one needs to hold sound academic background, preferably having or functioning towards a
HNC/HND or Honours degree in electrical or mechanical engineering; ideally having
knowledge about the power sector; experience in engineering, construction or project
delivery proves to be beneficial; a desire for working towards membership of a suitable
engineering institute; capability of communicating efficiently, taking in negotiation and
influencing abilities and lastly, need to hold sound leadership abilities with sound oral as well
as written communication abilities. I realised the importance of holding all the above
mentioned skills and knowledge for effectively performing the allocated tasks and be
successful in electric industry.
Week 6
After completing week 5 and understanding the pay structure and policies of the company, it
was now time to understand my project in great details. Reflecting back on this week, it was
certainly one among the highly memorable days of my project. Subsequent to being
introduced to all the team members, I was handed over the project details, in which I was
asked to provide recommendations for improving specific areas of the project wherever I
observe fit and my perspective on the project in general. The team members were quite open
as well as happy for me to make contribution as much as I desired to and also, were open for
any ideas and suggestions. This instantaneously made me feel comfort and made me feel as
though I was important fraction of the team. In this week of work finishing the tender, I was
flabbergasted through the work and the accountabilities, which assigned to me, nevertheless
with the assistance of my supervisors as well as team members, who also held good
experience within the sector, I felt more supported and confident since I very well knew that
my work will be cross checked and any indecisions were illustrated. Through learning and
observing from them, I somehow managed for picking up tips and gained knowledge about
diverse kinds of abilities, from learning to interact and handle other corporations, to
deciphering and reading several diverse kinds of plans. I understood the need for having
experience in engineering, construction or project delivery proves to be beneficial; a desire
for working towards membership of a suitable engineering institute; capability of
Document Page
communicating efficiently, taking in negotiation and influencing abilities and lastly, need to
hold sound leadership abilities with sound oral as well as written communication abilities. I
realised the importance of holding all the above mentioned skills and knowledge for
effectively performing the allocated tasks and be successful in electric industry.
Week 7
I was responsible for working closely with several team members within the team and build a
complete understanding related to the work performed and for developing a good all round
understanding related to the company as well as the overall segment. I was also responsible
for working with the team for maintaining or quickly restoring supplies of electricity during
the event of supply systems loss. I was responsible for working with the team for carrying out
fault finding, evaluation, repairs and changes to the conveyance as well as supply systems for
ensuring consistency of all equipment. Moreover, under supervision, I was responsible for
carrying out a number of system associated projects for improving reliability and
effectiveness of supply and with respect to the suitable industry standards. Operating on
project was quite enjoyable for me for the reason that it helped me to make use of all the
approaches I have learnt at my University within each sphere of Engineering, which had been
taught to me i.e. Geotechnical, Structural, Hydrology as well as Transport. I realised that this
may not be alike in all situations and frequently Engineers might lay emphasis upon one kind
of stream, nevertheless I was pleased that I had the chance for using all my theoretical
understanding and applied them all to the reallife circumstances. Through means of
experience along with observation other valued lesson, which I learned at the time of working
was that within projects, particularly when functioning in initial levels of the project, things
could alter quite speedily and dramatically.
Week 8
This week also taught me about important aspects associated with engineering. I learnt that in
case if there exist any kind of uncertainties, it at all times must be properly checked several
times and from top level sources prior to making any conclusions, particularly if they need to
be illustrated to the client. I discovered that the workplace itself was reasonably diverse from
what I had seen working at this company. There are project supervisors/managers, surveyors
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
to civil engineers all operating under one roof. Such huge array of individuals hold diverse
strengths as well as qualifications and they function collectively and manage their task with
respect to each other to ensure that the work flows smoothly and they are capable of
completing their work resourcefully for presenting it to the client in a timely manner. This in
turn, helps in making the workplace become better in terms of team and as a result, develops
a sound atmosphere within the functioning environment. Moreover, the task that I was
supposed to finish varied on everyday basis based upon what project was actually related to
or the tender due. Few days were low and at that time I generally concentrated towards
creating standard documents, which the corporation required updating, like forms (operating
at heights, functioning within confined spaces and others) and ensured that everything else
within the database was updated (i.e. White cards, Medical checks and Plant Operator Cards).
This assisted me a lot in learning more regarding the corporation being a business itself and I
felt as if I had an input directed for the progress of the expanding corporation. There were a
number of days, which were highly occupied when a tender deadline required being met or a
client needed something finished on urgent basis, and such days were highly stressful to the
level where there were situations when I required staying back for completing the work. This
in few manners reminded me about my late night studies at university and the way how when
within the workplace, it has remained same.
Week 9 and 10
Throughout these weeks I also held the chance of obtaining a ‘white card’ (i.e. construction
induction card) for being permitted on the work site. Moreover, this is also considered as
being an important aspect of Engineering that I was happy I had the chance for experiencing.
I was offered the chance of going on-site with senior civil engineers as well as labourers. My
accountabilities involved locating underground provisions and ensuring that any region,
which required being excavated did not have any optic fibre cables and networks, pipes. In
addition, this was perhaps the highly gratifying section of the whole work experience for the
reason that I felt inspired for getting out of the workplace subsequent to weeks of champing
numbers in office and to essentially view the task that I was focussing upon in theory,
presented live. This assisted me a lot in understanding how significant every phase of the
project actually is. On the whole, my work understanding was quite positive at the company.
I was so contented with the level of knowledge that I have gained as well as experienced
during all these weeks being a trainee Engineer with the corporation. I hold the view that
Document Page
alnassr Irons Company should uphold this area of the Engineering placement like it does
offers trainees with the experience required for finding a permanent job afterwards.
Furthermore, it could be quite advantageous for the reason that it can result in more
permanent positions, that is what actually happened with me. Without any doubt, I ended up
learning so much and more than what I have even thought I will be capable of during the
provided time span.
Week 11
This week basically involved examining what all has been achieved and evaluating the
project progress. On the whole the project was a great success and all the desired outcomes
associated with the project were effectively achieved. All the team members gave in their
best efforts to ensure success and effectiveness. Grounded upon the
supervisor's comments and my observations, there still prevails scope for further
improvement. This involves setting specific strategies for reaching the desired goals. As
mentioned above Moreover, the task that I was supposed to finish varied on everyday basis
based upon what project was actually related to or the tender due. Few days were low and at
that time I generally concentrated towards creating standard documents, which the
corporation required updating, like forms (operating at heights, functioning within confined
spaces and others) and ensured that everything else within the database was updated (i.e.
White cards, Medical checks and Plant Operator Cards). This assisted me a lot in learning
more regarding the corporation being a business itself and I felt as if I had an input directed
for the progress of the expanding corporation. There were a number of days, which were
highly occupied when a tender deadline required being met or a client needed something
finished on urgent basis, and such days were highly stressful to the level where there were
situations when I required staying back for completing the work. I was also responsible for
working with the team for maintaining or quickly restoring supplies of electricity during the
event of supply systems loss. I was responsible for working with the team for carrying out
fault finding, evaluation, repairs and changes to the conveyance as well as supply systems for
ensuring consistency of all equipment.
Week 12
This week involved examining what all I have learnt all through the period of my placement
at alnassr Irons Company. On the whole this placement proved quite successful and
knowledge imparting in my case. I not just gained good knowledge about a number of
Document Page
different aspects associated with engineering industry but also to apply them in real
situations. It involved both theory and practical application of concepts. I gained good
knowledge about different aspects associated with alnassr Irons Company. The first week of
my placement at alnassr Irons Company involved welcome of trainees and overview of the
company. All the trainees were acquainted with the Mission, Vision and the objectives of
specified work area. After gaining knowledge related to Mission, Vision and the objectives of
specified work area of the company and also, understanding the company’s framework with
complete accuracy, week 2 involved completing all the paper work and submitting personal
documents of the candidate. It acquainted candidates about the work procedures of the
company and how it operates. After gaining knowledge about the functions as well as
procedures of different departments and the way they are linked with each other specially,
now it was time to understand the work and procedures of my department in great detail. I
observed that the company lays high significance on laws and policies regulating the industry
in which it operates. I acknowledged that the company offers comprehensive advantages to
its employees including competitive salary; pension; bonus; health care benefits and
discounts on services and products. I discovered that the workplace itself was reasonably
diverse from what I had seen working at this company. On the whole, the entire 12 weeks
placement experience at alnassr Irons Company proved to be quite information seeking and
thought provoking, opening doors for new concepts and innovations.
chevron_up_icon
1 out of 10
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]