Running head: EARLY COMPLETION OF THE PROJECT
EARLY COMPLETION OF THE PROJECT
Name of the Student
Name of the University
Author note

1
EARLY COMPLETION OF THE PROJECT
Plan to achieve the goal
The schedule that have been planned needs a complete makeover in order to complete the
same. As there is no extra budget so not extra resources can be brought into complete the project
earlier than the stated deadline. Dependencies of the activities are to be reduced in case the
project is to be completed before the scheduled time. Another major activity that can be
performed is by removing the lags that were initially considered while planning the project.
The very 1st step that is to be taken is that rescheduling of the project is to be performed.
As it is seen that while performing the planning of a schedule a separate lag time for each
activity is kept under consideration. Although the lag time of each activity is very low. However
if the lag time of all the activities are considered a significant time can be gained (Lamas &
Demeulemeester 2016). This is the excess time that is to be axed off. Axing off of the lag times
and making the schedule precise will be acting to be beneficial in completing the entire project
faster and complete the same within the dead. This will be acting as a major boost in reducing
the time scale of completion of the project in a shorter span. Again it can be said that there are
presence of critical path in the project. In case the lags that were kept for the activities are
removed, lags present in the critical path due to the presence of those activities will be eliminated
as well. In this case there will be no alteration in the cost that will be incurred (Kannimuthu et al,
2019). Neither the workers will be required to perform over tome nor will the risk of the process
increase. Each and every aspect of the project will be constant but the time. Only the time that
will be required for completion of the project will be getting reduced (Shen et al, 2015). The sole
issue that might arise in this approach is that the accuracy of the work needs to be on top at every
moment. There will be no scope of error in this event. In case any errors occur the entire plan is
ought to fail.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
It is Shocking to Listen to such a News
|4
|823
|62

Unlocking Project Efficiency: Understanding Critical Path Analysis and Gantt Charts
|4
|690
|233

Storage Tank
|3
|583
|31

Project Management: Plan Development, Risk Management, Leadership, Team Management, Scheduling Resources and Costs, Reduction of Project Duration
|23
|3691
|233

Schedule Management Approach for Desklib Online Library
|7
|1237
|243

House Renovation Project Planning: WBS, Network Diagram, Feasibility, Risk Management
|20
|5911
|416