POND S BRI D GE CONST RUCT I ON
The project focuses on the

development and

construction of the bridge for

the new Stanhope Parkway.

The project encompasses the

following aspcts:

Business Unit: Engineering

Proposed by: Western Earth

Moving

Project Contract Type:

Lumpsum

Value: $3.5 million

Start date: November 2009

End date:November 2010

Resources within the project

includes:

-
Human Resources: Project
Manager, Construction

Manager, Computer

Engineer

-
Physical Resources:
Construction materials,

software and hardware

-
EVM technique to be used
for measuring actual project

performance

-
Cost variance analysis to be
used for comparison of

actual and planned

performance

-
Cost-benefit analysis used
for calculation of ROI and

payback period

RESOURCES
COST M ONITORING
PROJ ECT DETAILS
POND S BRI D GE CONST RUCT I ON._1

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Manage Project Cost for the Pond's Bridge Construction Project
|7
|755
|431

Managing Risk in Modern Construction
|13
|4064
|25

Resume of Hani Abdel Menem Mahmoud - Manager at Al Jaber Engineering Company, Qatar
|7
|1559
|375

CONSTRUCTION MANAGEMENT
|12
|2830
|1

Project Management 4.
|4
|312
|35

Survey and Civil Engineering - Doc
|8
|1322
|363