logo

Post Contract Cost-Control by Quantity Survey (QS)

   

Added on  2023-06-03

4 Pages663 Words449 Views
 | 
 | 
 | 
Quantity Survey (QS) 1
Quantity Survey (QS)
by (Name)
Course
Instructor/Professor
Institution
Location
Date
Post Contract Cost-Control by Quantity Survey (QS)_1

Quantity Survey (QS) 2
Task 3b – Post contract cost-control by Quantity Survey (QS)
Cost control is an important part of any construction project. It means, by definition,
ensuring that the construction cost of the project remains within the limits of the client’s
budget. The post contract cost control however is the stage of cost control after the contract
has been finalized (Cost control (2016) see also (Seleesy, I. 2016, 139).
The significance of sustaining an effective post-contract cost control for a project quantity
surveyor
The success of post contract cost control is determined by the pre contract stage of
construction. The pre contract stage consists of cost planning; design and client’s needs
and wants as well as tendering. These initiatives draws such expectations as reasonable
cost advice by the quantity surveyor, realistic allocation of the budget to different areas of
construction and monitoring to find solutions for any cost problem. The project quantity
surveyor takes charge and monitors all the cost in a construction project (Uk essay
(2016). {Towey, D. 2017, 309}.
Sustaining an effective post-contract cost control plan is important for maintaining
good relationship between the contractor and client. The aim is solely to ensure cost effective
operations with relative consideration to government regulations and the environment. The
quantity surveyor ensures no changes are made till the project finalises so that the client pays
the final price of the project. This is important in guaranteeing good relationship with the
client. (QSD PQSL series (2015) (Ogunlan, S. 2003, 245).
Monthly financial statements to the Employer
A monthly financial statement provides updates on the project’s financial status
progress every month to either the employer or architect. It is very essential for the
Post Contract Cost-Control by Quantity Survey (QS)_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Role and Responsibilities of a Quantity Surveyor
|16
|5511
|41

Project in construction management
|16
|4246
|42

Assignment on Management Costing
|11
|2659
|36

Essence of Quantity Surveying: Cost Controlling, Procurement, and Contractual Matters
|8
|1730
|79

Contractual arrangements for a 30-storey tower on a 5-storey podium
|12
|4171
|136

Project and Financial Management - Doc
|10
|1910
|72