This document discusses the importance of reflective practice in PPMP20008 and the lessons learnt, including the importance of communication and leadership skills. It provides improvement strategies to address these lessons and emphasizes the relevance of team engagement and proper communication in project success.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
PPMP20008
2019 TERM 1 ASS_3
LESSONS LEARNT
Name: Insert full name
Student Number Insert student number
Campus: Insert campus or distance
Tutor: Insert tutor name
Tutorial number: Insert the tutorial number
Notes to the Author
[This document is a template. It has been tailored to suit the assessment. All fields within the template should
be completed as per the project scenario provided.
ï‚· Blue italicized text provides an explanation of what should be included for each section. Remove all
blue text prior to submission. If there are two or more options for you to decide between, revert
the option you are keeping to black and remove the other.
Do not attach pictures to the file – pictures are not able to be read by turnitin and will be marked as
a zero.
1
2019 TERM 1 ASS_3
LESSONS LEARNT
Name: Insert full name
Student Number Insert student number
Campus: Insert campus or distance
Tutor: Insert tutor name
Tutorial number: Insert the tutorial number
Notes to the Author
[This document is a template. It has been tailored to suit the assessment. All fields within the template should
be completed as per the project scenario provided.
ï‚· Blue italicized text provides an explanation of what should be included for each section. Remove all
blue text prior to submission. If there are two or more options for you to decide between, revert
the option you are keeping to black and remove the other.
Do not attach pictures to the file – pictures are not able to be read by turnitin and will be marked as
a zero.
1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1. INTRODUCTION
Reflective practice is referred to as a process that is used to reflect particular one’s response to
keep him or her-self engaged to the assigned job roles and responsibility. In other words the
reflective learning is a continuous learning approach that much used by the project management
professionals. This process includes both the theoretical and practical prcatices required to take
every day project management actions.
Being enrolled as a student of PPMP20008, I have realized that, reflective practice is essential
for the graduate students also to keep them-selves engaged to their study materials. This way of
study improves the work prcatices of each student by allowing them to measure their own
experienced gained throughout the learning session. The process is helpful to increase self
confidence as well.
During the learning session I have learned two lessons 1) Importance of communication skill
and 2) importance of leadership skill and feel that both the lessons will help me in coming future
and practical practices. If any one of these prcatices is missed then it will hamper the expected
project outcomes.
2 LESSONS LEARNT: FRAMEWORK
2.1 How I planned to gather and document lessons learnt
When…
I planned to identify and collect
lessons learnt
Who…
I planned to involve in the
process of gathering lessons
How…
I planned to document lessons
I planned to identify and
collect lessons learnt when I
was initially started the
learning course PPMP20008
I planned to involve in the
process of gathering lessons-
co team members and our
supervisor.
I planned to document
lessons in a manual hard
copy to avoid technical
errors.
2.2 What actually happened?
When...
I identified and collected lessons
learnt
Who…
I involved in the process of
gathering lessons
How…
I documented lessons
I identified and collected
lessons learnt at the last
moment which resulted huge
hazards
I involved in the process of
gathering lessons my co
team members and
supervisors successfully
I documented the lessons in
the form of a hard copy
3. LESSONS
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the situation
The situation that happened
within course PPMP20008, is
lack of communication among
The situation made me feel
very angry
I have learnt that in order to
successfully implement any
activity or work it is very
2
Reflective practice is referred to as a process that is used to reflect particular one’s response to
keep him or her-self engaged to the assigned job roles and responsibility. In other words the
reflective learning is a continuous learning approach that much used by the project management
professionals. This process includes both the theoretical and practical prcatices required to take
every day project management actions.
Being enrolled as a student of PPMP20008, I have realized that, reflective practice is essential
for the graduate students also to keep them-selves engaged to their study materials. This way of
study improves the work prcatices of each student by allowing them to measure their own
experienced gained throughout the learning session. The process is helpful to increase self
confidence as well.
During the learning session I have learned two lessons 1) Importance of communication skill
and 2) importance of leadership skill and feel that both the lessons will help me in coming future
and practical practices. If any one of these prcatices is missed then it will hamper the expected
project outcomes.
2 LESSONS LEARNT: FRAMEWORK
2.1 How I planned to gather and document lessons learnt
When…
I planned to identify and collect
lessons learnt
Who…
I planned to involve in the
process of gathering lessons
How…
I planned to document lessons
I planned to identify and
collect lessons learnt when I
was initially started the
learning course PPMP20008
I planned to involve in the
process of gathering lessons-
co team members and our
supervisor.
I planned to document
lessons in a manual hard
copy to avoid technical
errors.
2.2 What actually happened?
When...
I identified and collected lessons
learnt
Who…
I involved in the process of
gathering lessons
How…
I documented lessons
I identified and collected
lessons learnt at the last
moment which resulted huge
hazards
I involved in the process of
gathering lessons my co
team members and
supervisors successfully
I documented the lessons in
the form of a hard copy
3. LESSONS
1. Situation 2. The situation made me
feel…
3. What I learnt from
reflecting on the situation
The situation that happened
within course PPMP20008, is
lack of communication among
The situation made me feel
very angry
I have learnt that in order to
successfully implement any
activity or work it is very
2
the team members essential to engage the team
members all together to avoid
excessive work load at the very
last moment.
3.1.1 IMPROVEMENT STRATEGY 1
(a) Improvement
strategy
Explain what the
specific strategy is
that you will
implement to
address the lesson
identified above
(b)
Measurement
How to measure if
the strategy works
(c)
Achievable
Why the strategy is
achievable
(d)
Relevant
Explain the
relevance of
strategy to
address the lesson
(e)
Timing
When the strategy
will be
implemented
The specific
improvement
strategy is
professional
open
communication
I would know the
strategy was
working as I
could measure
this from the
feedback of other
team members
This strategy is
achievable for
me because I
have good
communication
skill.
This strategy is
relevant to
lesson 1 as it will
minimize
I will implement
this strategy by
(5/15/2019-
5/19/2019)
3.2 Lesson 2
1. Situation 2. The situation
made me feel…
3. What I learnt from
reflecting on the situation
When I was assigned in managing the
complete team I felt that there is no
coordination among the team members
and no one is engaged to their
assigned job roles and responsibilities
The situation made
me feel extremely
angry
I have learnt that team
engagement is very important
and without leadership and
proper motivation team
engagement is not possible
3.2.1 IMPROVEMENT STRATEGY 2
(a) Improvement
strategy
Explain what the
specific strategy is
that you will
implement to
address the lesson
identified above
(b)
Measurement
How to measure if
the strategy works
(c)
Achievable
Why the strategy
is achievable
(d)
Relevant
Explain the
relevance of
strategy to
address the lesson
(e)
Timing
When the strategy
will be
implemented
The specific
improvement
strategy is
advanced
leadership and
motivation to
I would know the
strategy was
working as I
could measure
this through
personal
This strategy is
achievable for
me because I
have team
engagement
capabilities and I
This strategy is
relevant to
lesson 1 as it will
leverage
I will implement
this strategy by
(5/20/2019-
5/21/2019)
3
members all together to avoid
excessive work load at the very
last moment.
3.1.1 IMPROVEMENT STRATEGY 1
(a) Improvement
strategy
Explain what the
specific strategy is
that you will
implement to
address the lesson
identified above
(b)
Measurement
How to measure if
the strategy works
(c)
Achievable
Why the strategy is
achievable
(d)
Relevant
Explain the
relevance of
strategy to
address the lesson
(e)
Timing
When the strategy
will be
implemented
The specific
improvement
strategy is
professional
open
communication
I would know the
strategy was
working as I
could measure
this from the
feedback of other
team members
This strategy is
achievable for
me because I
have good
communication
skill.
This strategy is
relevant to
lesson 1 as it will
minimize
I will implement
this strategy by
(5/15/2019-
5/19/2019)
3.2 Lesson 2
1. Situation 2. The situation
made me feel…
3. What I learnt from
reflecting on the situation
When I was assigned in managing the
complete team I felt that there is no
coordination among the team members
and no one is engaged to their
assigned job roles and responsibilities
The situation made
me feel extremely
angry
I have learnt that team
engagement is very important
and without leadership and
proper motivation team
engagement is not possible
3.2.1 IMPROVEMENT STRATEGY 2
(a) Improvement
strategy
Explain what the
specific strategy is
that you will
implement to
address the lesson
identified above
(b)
Measurement
How to measure if
the strategy works
(c)
Achievable
Why the strategy
is achievable
(d)
Relevant
Explain the
relevance of
strategy to
address the lesson
(e)
Timing
When the strategy
will be
implemented
The specific
improvement
strategy is
advanced
leadership and
motivation to
I would know the
strategy was
working as I
could measure
this through
personal
This strategy is
achievable for
me because I
have team
engagement
capabilities and I
This strategy is
relevant to
lesson 1 as it will
leverage
I will implement
this strategy by
(5/20/2019-
5/21/2019)
3
other project
team members
reflective lesson
learn process
can motivate
others
6. CONCLUSION
From the discussion it can be concluded that team engagement is not possible without proper
leadership and motivation from the higher authority. In addition to this if proper communication is
not followed by the team members then due to lack of lack communication intra team conflict will
occur. The conflict will act as obstacles in the professional success path way.
4
team members
reflective lesson
learn process
can motivate
others
6. CONCLUSION
From the discussion it can be concluded that team engagement is not possible without proper
leadership and motivation from the higher authority. In addition to this if proper communication is
not followed by the team members then due to lack of lack communication intra team conflict will
occur. The conflict will act as obstacles in the professional success path way.
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7. REFERENCES
Cohen-Vogel, L., Tichnor-Wagner, A., Allen, D., Harrison, C., Kainz, K., Socol, A. R., and Wang, Q.
2015. Implementing educational innovations at scale: Transforming researchers into continuous
improvement scientists. Educational Policy, 29(1), 257-277.
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., and de Almeida, L. F. M. 2014. Can agile
project management be adopted by industries other than software development?. Project
Management Journal, 45(3), 21-34.
Conger, S. 2015. Six sigma and business process management. In Handbook on Business
Process Management 1 (pp. 127-146). Springer, Berlin, Heidelberg.
First, M. B. 2016. Adopting a continuous improvement model for future DSM revisions. World
Psychiatry, 15(3), 223-224.
Kerzner, H., and Kerzner, H. R. 2017. Project management: a systems approach to planning,
scheduling, and controlling.
Mir, F. A., and Pinnington, A. H. 2014. Exploring the value of project management: linking project
management performance and project success. International journal of project
management, 32(2), 202-217.
Mok, K. Y., Shen, G. Q., and Yang, J. 2015. Stakeholder management studies in mega
construction projects: A review and future directions. International Journal of Project
Management, 33(2), 446-457.
Nojavan, S., Zare, K., and Mohammadi-Ivatloo, B. 2015. Stochastic energy procurement
management for electricity retailers considering the demand response programs under pool market
price uncertainty. Majlesi J. Energy Manag, 4(3), 49-58.
5
Cohen-Vogel, L., Tichnor-Wagner, A., Allen, D., Harrison, C., Kainz, K., Socol, A. R., and Wang, Q.
2015. Implementing educational innovations at scale: Transforming researchers into continuous
improvement scientists. Educational Policy, 29(1), 257-277.
Conforto, E. C., Salum, F., Amaral, D. C., da Silva, S. L., and de Almeida, L. F. M. 2014. Can agile
project management be adopted by industries other than software development?. Project
Management Journal, 45(3), 21-34.
Conger, S. 2015. Six sigma and business process management. In Handbook on Business
Process Management 1 (pp. 127-146). Springer, Berlin, Heidelberg.
First, M. B. 2016. Adopting a continuous improvement model for future DSM revisions. World
Psychiatry, 15(3), 223-224.
Kerzner, H., and Kerzner, H. R. 2017. Project management: a systems approach to planning,
scheduling, and controlling.
Mir, F. A., and Pinnington, A. H. 2014. Exploring the value of project management: linking project
management performance and project success. International journal of project
management, 32(2), 202-217.
Mok, K. Y., Shen, G. Q., and Yang, J. 2015. Stakeholder management studies in mega
construction projects: A review and future directions. International Journal of Project
Management, 33(2), 446-457.
Nojavan, S., Zare, K., and Mohammadi-Ivatloo, B. 2015. Stochastic energy procurement
management for electricity retailers considering the demand response programs under pool market
price uncertainty. Majlesi J. Energy Manag, 4(3), 49-58.
5
1 out of 5
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024  |  Zucol Services PVT LTD  |  All rights reserved.