PPMP20008 Work Breakdown Structure & Work Package

Added on - 16 Sep 2019

  • Dissertation

    type

  • 5

    pages

  • 1318

    words

  • 97

    views

  • 0

    downloads

Showing pages 1 to 2 of 5 pages
PPMP20008Assessment 3:Work Breakdown Structure and Work Package(Extra voluntary activity: There is a mistake in this document. There were mistakes on the otherassessment documents. Did you notice them? If you find it, it might be worth noting down. Thinkabout your feedback on your assessments. Were there comments about checking your work?What ways do you check your work before submitting it? In project management how would this‘check’ occur?)Assignment OverviewThis assessment item requires you to develop :-Work Breakdown Structure (WBS), anda work packageThe submission must comply with the requirements outlined in the PMBOK v5 and PRINCE2(2009). You are to develop and complete the documents as the project manager for the projectsupplied. Do not simply describe the purpose of the documents.Assessment Due DateWeek 8 Friday (08-Sep-2017) 11:45 PM AESTReturn Date to StudentsWeek 10 Monday (18-Sep-2017)Weighting20%Assessment CriteriaYour assignment will be assessed on the extent and quality to which it meets each of thefollowing criteria.1.The project management concepts within thework breakdown structureare appliedappropriately and it is an accurate reflection of the project described in the selectedtender (5 marks)2.The project management concepts within thework packageare applied appropriatelyand the quality management plan is an accurate reflection of the project described in theselected tender (15 marks)Ensure your submissions are submitted in an appropriate format, are concise, demonstrate clarityof expression, and correct grammar and spelling.Assessments provide the opportunity for students to demonstrate their knowledge and skills to
achieve the required standard. To do this, assessment responses need to be both clear and easyto understand. If not, the University cannot determine that students have demonstrated theirknowledge and skills. Assessments will, therefore, be marked accordingly including the potentialfor 0 (zero) marks where relevant.Include only Microsoft Word Files for this assessment. There should be two separate files, one forthe WBS and one for the Work Package.Do not include PDFs, Zip files or pictureswithin word files.Work Breakdown StructureFor the assessment the WBS must have at least three levels (make this simple and don’t go furtherthan three). Make sure your lower level are WORK PACKAGES, not activities.There should be no more than six to ten work packages in your work breakdown structure.Include the WBS identifier on each item. It is likely better to have the project (top level) identifier aszero.Each parent item on the WBS must have at least two items coming from it.
desklib-logo
You’re reading a preview
card-image

To View Complete Document

Become a Desklib Library Member.
Subscribe to our plans

Unlock This Document