Indigenous Language Signage Design

Verified

Added on  2019/09/18

|7
|967
|132
Report
AI Summary
CQU's Indigenous Language Signage Work Package aims to design and print sign boards using PVC materials. The work package involves three processes: finding a supplier, selecting a preferred design, and reviewing the final output. Key milestones include review of chosen design and materials, review of final output, and approval of this work package phase. The project manager will set weekly meetings to monitor progress and address any problems that may arise.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
PPMP20008
Assessment 3
Work Package
Phase 1.2.
(Design)
Indigenous Language for CQU Signage
Group
Dominic Estrada – 12034707
Neil Patrick Nacar – 12034170
Edward Njoroge – 12031801
Submitted to: Daemi Arash

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Table of Contents
Signature Block........................................................................................................ 3
Work Package Description.......................................................................................4
Development Interfaces...........................................................................................5
Operations and Maintenance Interfaces..................................................................5
Configuration Management Requirements.............................................................5
Joint Agreements.....................................................................................................6
Tolerances................................................................................................................6
Constraints...............................................................................................................6
Reporting Arrangements..........................................................................................7
Problem Handling and Escalation............................................................................7
Extracts or References.............................................................................................7
Approval Method.....................................................................................................7
Document Page
Signature Block
Lavinia Arguelez
Project Manager
Madden
Signature: ____________________
Sarah Ang
WP Team Leader
Madden
Signature: ____________________
Document Page
Work Package Description
This work package is essential for this project because the outcome of the sign
boards to be implemented at CQU will rely here. This work phase refers to the
choosing of design and canvassing of materials to use in creating the Sign Boards.
The sign boards to be implemented will be printed in PVC materials.
Tools
This work package needs the following materials and tools;
1. PVC material to use as a sign board.
2. Laser printer use to print the indigenous word/s in the PVC materials.
Processes
This work package will undergo to a 3 processes.
1. To look a supplier that will supply the materials and provide ready designs.
2. Selecting preferred design.
3. To review the final result for this work package before deciding.
Procedures
When choosing a materials, certain procedures are required to achieve the best
results of this work package.
First is to find a supplier that will supply all the materials that you need to use for
this project. When deciding who will be the supplier of your materials, consider
your budget and if they can able to supply the material on time. Then also review
the quality of their work. The sign board will have a dimension of 100mmx150mm
and a thickness of 2mm. The total number of sign board to be printed is 300 pcs.
Second is to select the preferred design that are needed for this project. When
choosing the design, quality is very important factor that needed to consider.
Last is to review the sample output of the design. Make sure that the quality of
the output met the requirements given by the client.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Development Interfaces
This table shows the name of the people, roles and organization that providing
information or receiving information when developing this work package.
Name Role Organization
Bronwyn Fredericks Project Executive CQU
Lavinia Arguelez Project Manager Project Manager
Sarah Ang WP Team Leader WP Team Leader
Steve Project Builder Steve’s Installation
Chaka Khan Supplier of Project
Materials
Signarama
Scott Bowman Sponsor CQU Vice Chancellor
Ron Tollasep Senior Supplier CQU
David Harris Senior User CQU
Operations and Maintenance Interfaces
Activities Materials Operations
Selecting design and
materials
PVC-material, PVC-
ready printer
Supplier will provide a
ready design and client
will choose according to
their preferred design.
Configuration Management Requirements
The project builder and supplier of project materials will define the current
configuration of the work package based on the terms and conditions of the
project based on the requirements which includes the preferred design and the
materials. If the project builder and supplier of project can’t deliver any of the
specifications, reports should be communicated to the project manager.
Document Page
Joint Agreements
Element Agreement
Cost Fixed Cost and Miscellaneous
(100mmx150mmx2mm, 100 pcs):
$5,000 AUD
TOTAL PHASE COST: $5,000 AUD
Start and End Date of the Work
Package
The work package will be completed
within 15 days.
Start: August 28, 2017
End: September 15, 2017
Key Milestones Milestone 1: Review of the
chosen design and materials
Milestone 2: Review of the final
output of the product
Milestone 3: Approval of this
work package phase
Tolerances
Element Actuals
Time The cost tolerance for this work package is +/- %5
Cost The cost tolerance for this work package is +/- %5
Constraints
Quality Constraints
The quality of the sign boards will be a constraints given that this project is only
due in 15 days. The supplier of project material will be required to rush a 300
pieces of sign boards and it may result a poor quality in printing the sign board.
Document Page
Reporting Arrangements
The Project Manager will set a weekly meeting every Friday of the week until the
duration of the work package phase.
Reports will be prepared by the Work Package Team Leader and shall report the
project progress to the Project Manager. All the changes in the project will be
reported to the Project Manager
Expected Frequency of Reporting Arrangements Content of Checkpoint Report
Weekly, every Friday of the week. Follow ups on the previous
meeting
Status and progress of the
Work Package phase
Problems occurred in the
work package phase
Problem Handling and Escalation
Any possible high and extreme risks that might occur during this phase will be
reported by the Work Package Team Leader to the Project Manager during
weekly meeting that held every Friday of the week through progress report.
When risks arise, WP Team Leader needs to determine if the risk can be address
an urgent matter or not. If so, WP Team will escalate the issue to the Project
Manager out of session.
Extracts or References
Approval Method
The completed project for this work package phase will be approved by the
Project Manager. Mostly, the Project Manager will be advised to approve the
project phase if the completion had meet the necessary requirements of the
project phase.
1 out of 7