PPMP20008 - Requirements Management Plan Template

4 Pages921 Words97 Views
   

Central Queensland University

   

Planning and Initiating Projects (PPMP20008)

   

Added on  2020-03-07

About This Document

PPMP20008 - Requirements Management Plan template report Requirement prioritization is defined as one of the procedures that are utilized for managing the urgency as well as the significance of various requirements for coping with different resources of the project. It is identified that adequate prioritization helps in ensuring that the most significant requirement must be addressed properly within proper budget as well as time.

PPMP20008 - Requirements Management Plan Template

   

Central Queensland University

   

Planning and Initiating Projects (PPMP20008)

   Added on 2020-03-07

ShareRelated Documents
PPMP20008REQUIREMENTS MANAMGEMENT PLAN OUR LANGUAGE MATTERSREQUIREMENTSMANAGEMENT PLANVersion Number: 1Version Date: XX/XX/20XXStudent names and numbers:Campus:Tutorial group:Tutor:Natalie Ewin
PPMP20008 - Requirements Management Plan Template_1
Requirements Management Plan TemplateOur Language Matters1. Planning the requirement activities1.1 Traditional Owner/s of the land on which CQUniversity campuses are located.It is identified that single senior supplier that represents the traditional owner of land on which the land of Queensland campus is situated is appropriate because the senior supplier have appropriate information as well as knowledge about the land on which the campus was located (Gray et al., 2016).1.2 Wording of ‘Acknowledgement of country’ The two opening statement for the executive are provided below: I would like to show my respect and knowledgeto the indigenous people of “Aboriginal and Torres Island” to reflect the importance of language. I want to focus on the indigenous languages that have lost in the past with the help of a meeting.The project executive selects the wording “Acknowledgement of Country” as the executive is not of Aboriginal and Torres Island and the wording acknowledgement of country can be done by everyone including both indigenous as well as non-indigenous for payingrespect to the Aboriginal land (McCarthy et al., 2014).1.3 Requirements gathering for translation servicesThis procedure is not considered appropriate for information gathering because no external members are involved in it. The information gathering procedure must be done by consulting all the stakeholdersof the project so that the project will be executed properly within the estimated time and budget (LeBlanc, 2013). Information gathering only with the help of project team member can create number of challenges including ineffective design, improper reflectionof information, inaccurately represented and more.2. Requirements tracking documentThe documents that are used for tracking the requirements are “requirement traceability matrix”. This document is utilized for analyzing
PPMP20008 - Requirements Management Plan Template_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
PPMP20008 - Requirements Management Plan
|4
|802
|675

BE511 - Requirement Management Plan
|3
|595
|30

MAN 4583 - Management Plan Assignment
|4
|977
|55

Project Planning Assignment | Project Scope
|8
|794
|70

PPMP20008 Indigenous Cultural Awareness Training Project - Report
|15
|4166
|60

Indigenous Cultural Awareness Training Assignment
|16
|3409
|123