Principles of Project Management
Principles of Project Management_1

Table of ContentsINTRODUCTION...........................................................................................................................3MAIN BODY ..................................................................................................................................3Overview of the project: ........................................................................................................3Current status of the project: .................................................................................................3Additional information:..........................................................................................................5Overview of the leadership behaviour on this project:...........................................................6Team environment and cultures: ...........................................................................................8CONCLUSION..............................................................................................................................10REFERENCES..............................................................................................................................11APPENDIX 1.................................................................................................................................12
Principles of Project Management_2

INTRODUCTIONProject management is an area of management which involves practices like initiating,planning, executing, controlling and closure of the work in stated period of time. The major levelof challenges of the project management is to accomplish all of the project goals within the givenconstraints (Olechowski and et. al., 2016). This report will be cover on Katz office fit-outs whois well-known for its kind of furnishings, electrical & water fit-outs and also other interiordesigning or development of the structure of any premises. In the contrary, this project willaimed at project tracking on a work till now done by Katz office fit-outs and its reporting. Also,this report will also puts emphasis on presentation skills, team leadership and learning orreflection at a greater side. Lastly, this report will majorly focuses on existing team workingenvironment after current project and additional information on new project manager. MAIN BODY Overview of the project: This project is currently engaged by Katz office outlets, in which firm is undertaking fit-out project in the medium size IT office building in the Sydney suburbs. As, this project is leadby team of Katz company & contractors which was underlying by the project manager TonyFaultier (Janssen and et. al., 2015) As, the current project manager has left this business entityand work is abrupt in the middle process. In this, work is partially completed on every level ofthis building on which observation is necessary to this project. On this, big amount has beenspent and still completion of this project needs to be undertaken. On leaving of the currentproject manager, this would be major challenge for Katz office fit-outs to hire and prepare newproject manager to work with increased efforts at a greater scale. In this project, four different elements such as current status of the report including costand schedule variances, recruitment of the new project manager, discussion of the leadershipbehaviour and team working environment with an influences on work policies. Current status of the project:This outfit project was decided at budgeted amount of $1.2 million and original schedulefor completion of this project work is decided four months from 1 may to 30 June. In this outfitproject, four level of the building such as ground floor, first floor, second floor and top floor. Thedescribed schedules are as given under:
Principles of Project Management_3

On May 1, current status of this project is shown with the help of a tabulation. This levelof an information has been coming out of clear investigation on work done till now.Schedule variances: Level of the buildingStandard work required Actual work doneGround floor100.00%75.00%First floor50.00%25.00%Second floor 50.00%25.00%Top floorNot yet decided 50% ahead of previous call. Cost variance: This is defined as difference between cost planned in budgeted decisionand cost spent till now into the work process. The table of the cost variance in this project iscomprises of the tabulation explanation. Particulars Amount Total cost budgeted for this fit-out project $1.2 millionLess: Actual cost spent on the fit-out$675KAmount yet to be spend $525K Overview scorecard: This is kind of the rating structure, in which score will be given toan actual work done to any defined project in comparison of the desired one. This is generallyshown to the project manager or team group in order to evaluates the risk associated with desiredperformances. Gantt chart: This is a type of the chart that help in the illustration of a project schedules.This chart lists out a task to be led performed on the vertical axis and time intervals on horizontalaxis. This is also known as the chart of the project, in which each and evert task of this project isshown under heading or time required to complete this project (Špundak, 2014)
Principles of Project Management_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Principles of Project Management
|16
|855
|51

Principles of Project Management
|18
|801
|94

Assignment on Principles of Project Management (Doc)
|15
|3377
|288

Project Management Assignment - Vella IT
|13
|2432
|285

Principles of Project Management - Desklib
|11
|715
|176

Principles of Project Management for ProCon Services Australia
|11
|3073
|462