Running head: PRINCIPLES OF PROJECT MANAGEMENT
Principles of Project Management
Name of the Student
Name of the University
Author’s Note:
Principles of Project Management_1

1
PRINCIPLES OF PROJECT MANAGEMENT
Table of Contents
1. Introduction............................................................................................................................2
2. Discussion..............................................................................................................................2
2.1 Brief Discussion of the Given Scenario...........................................................................2
2.2 Examining Methods for Project Selection being applied to the Case Study of Uber......3
2.3 Important Procedures to conduct Methods of Project Selection......................................4
2.4 Brief Discussion of the Initial Process Groups and Document of Project utilized..........5
3. Conclusion..............................................................................................................................6
References..................................................................................................................................7
Principles of Project Management_2

2
PRINCIPLES OF PROJECT MANAGEMENT
1. Introduction
Management of a specific project work is termed as an important practice for starting,
planning, implementing, managing and closing a team work for achievement of each and
every previously determined goals and for fulfilling significant criteria of success in given
time period (Harrison & Lock, 2017). One of the most significant goals to manage any
project is to produce the most unique product, which complies with all requirements of a
client. Few important methodologies for selection of the project that are required to be taken
into consideration for this particular project work (Crawford, 2014). The report will outline a
detailed analysis of methods for selecting projects as well as project documents that are being
utilized for Uber case study.
2. Discussion
2.1 Brief Discussion of the Given Scenario
One of the most significant and popular cab organizations within the world is Uber.
They are building new application for the drivers to provide them with utmost advantages and
also for reducing the issues and complexities faced by them. Moreover, they are trying to
keep a pace with high competition and hence designing the application to make it more
efficient. They have started to consider the suggestions of their drivers and thus a new and
innovative designing process is being considered by bringing technology of builders. They
have started a new campaign called 180 days of change. Furthermore, they have also
improved the payment of the drivers and having a hope that their profit would be increased.
The new application would follow their drivers in finding out the customers, providing timely
rides and also delivering food to them. However, this application has not worked properly for
larger cities, thus they have again taken the decision of reverting their change.
Principles of Project Management_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management Principles for Uber Case Study
|10
|2089
|392

Project Management Principles: Uber Case Study
|8
|2062
|377

Project Selection Methods & Initiation Documents - Uber Driver App
|8
|2202
|341

Project Selection Methods based on Uber Case Study
|11
|2620
|297

SINGULAR LOGIC CASE STUDY
|10
|2082
|18

Project Selection and Execution of Uber App Redesign
|8
|1856
|354