ObjectivesandPriorities Objectives ο΄The main objective of this project was to launch the Food Test lab on 1stJuly 2019 ο΄Apart from that, the objective of the project was to successfully complete the Fibronil Testing ο΄Both the project objectives were successfully met. Priorities ο΄The Schedule was the main priority of the project along with the performance. ο΄The project was completed in estimated time ο΄This indicates that the project priorities were met.
Changesinproject Schedule ο΄There have been certain changes in the Schedule of the project ο΄The main contributing event for the schedule change includes the Fipronil Testing ο΄One activity needed 4 more days to complete that resulted in schedule conflict and changes in project schedule.
Cost Overrun ο΄The Project faced certain cost overrun. ο΄This is mainly because of the change in project schedule ο΄Resource shortage is another contribution event of Cost Overrun in FTL project ο΄The Figure on the left indicates the cost Overrun
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Lesson Learnt ο΄Capturing the lesson learnt is considering to be an on going effort of project implementation ο΄The major lesson learnt associated with the FTL project are as follows- οAccurate Project Planning is required for ensuring that project followed appropriate specifications οAppropriate budget estimation is quite essential to ensure project success οChange management should be implemented in a planned manner
Suggestion ο΄The suggestions that can be provided on basis of FTL project are as follows- οThe Project should have considered more available resources οResource allocation should have been more accurate for this project οIt is suggested that change implementation of the project follows a planned approach οIt is suggested that project should have a scope for incorporation of any vital change during project implementation.