The report outlines a brief discussion on three distinct methods of procurement in construction projects. Proper comparison and contrasting would be done and proper recommendations would be provided.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: PROCUREMENT METHODS IN CONSTRUCTION PROJECTS Procurement Methods in Construction Projects Name of the Student Name of the University Author’s Note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS Executive Summary The main aim of this report is to understand the three distinct procurement methods within the construction projects. The various processes are properly defined within the procurement methods and hence the risks like exposure to frauds and collusions are minimized. These procurement methods are extremely effective for the proper delivery of any construction project. The report has properly described the three popular procurement methods of design build, design bid build and general contracting. A proper comparison and contrast of these three methods are provided in this report and several recommendations are also provided here.
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS Table of Contents Introduction................................................................................................................................3 Discussion..................................................................................................................................3 Characteristics of Three Procurement Methods in Construction Projects.............................3 Comparison and Contrast of the Three Procurement Methods..............................................6 Kinds of Projects Suitable for Three Procurement Methods.................................................9 Recommendations for the Project Owners in Three Procurement Methods..........................9 Conclusion................................................................................................................................10 References................................................................................................................................11
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS Introduction The procurement methods are such procedures, which are utilized by the respective procuring entities for acquiring works, goods and services. These types of methods could either be competitive or non competitive (Naoum and Egbu 2016). There is a significant preference to utilize the competitive methodologies of procurement, since these methods have the tendency of promoting the effectiveness, efficiency and economy. The selection of the procurement methods is extremely vital for the proper execution of the construction projects. There are several significant methods of procurement and several important ingredients are required for obtaining the advantages and disadvantages. There are various important and significant procurement methods for all construction projects and hence these are required to be followed within these projects to make it successful (Masterman and Masterman 2013). The following report outlines a brief discussion on three distinct methods of procurement. Proper comparison and contrasting would be done and proper recommendations would be provided. Discussion Characteristics of Three Procurement Methods in Construction Projects The three important procurement methods within the construction projects are design build method, design bid build and general contracting. i)Design Build Method: Design build method is one of the major project delivery methods that is utilized for construction projects. The project delivery is much easier with this and the construction or design services could be contracted with the help of one entity called design build contractor or design builder (Porwal and Hewage 2013). It mainly relies on the single point of the responsibility contracts and hence is being utilized for the minimization of risks or threats for the respective project owners and also for the reduction of
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS delivery schedule by the overlapping of design and construction phases in any specific project. The major characteristics of the design build procurement method are as follows: a)Hiring of General Contractor: The first and the foremost characteristic of the design build procurement method is hiring of the general contractors (Brook 2016). The respective project owner is responsible for hiring this general contractor as well as the team of design build. b)Proper Communication: The second important characteristic of the procurement method of design build is proper communication. Due to the flow of communication is better; this particular procurement method delivers error free and proper delivery of projects. c)RiskFreeMethod:Anotherimportantandsignificantcharacteristicofthe procurement method of design build is that it is absolutely risk free and hence is quite popular for the users (Ruparathna and Hewage 2013). Moreover, even if this type of project comprises of risks, the risks could be minimized to a greater level without much problems. ii)Design Bid build Method: The second important procurement method for any construction project is the design bid build. It is the project delivery methodology, where the owner or the agency contracts with the different entities for the construction and designing of several projects. It is the traditional procurement method of project delivery and is completely different from the design build method (Jato-Espino et al. 2014). Three sequential phases are present within the procurement method of design bid build, which are the design phase, the tender or the bidding phase and finally the construction phase. In the first phase of designing, the project owner retains the architect for the purpose of designing and finally producing the several bid documents like technical specifications and construction drawings.
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS There are some of the major and the most significant characteristics of the design bid build method and these are given below: a)Cost Effective: The first and the foremost characteristic of the design bid build method of procurement is that it is extremely cost effective and hence could be easily affordedbyallusers(Hughes,ChampionandMurdoch2015).Eveninthesmaller construction projects, this particular procurement method is quite easier to be utilized. b)Time Management: The next important characteristic of this design bid build method of procurement for any construction project is that the over time consumption is extremely less and time management is better here. Due to the lack of time involved, it becomes easier for the construction projects to take up this method. c)Highly Efficient and Effective: The third significant characteristic of this particular method of procurement is that it is extremely effective and efficient and hence could be easily used for the several construction projects (Ruparathna and Hewage 2015). Moreover, the overall qualities of the projects are also improvised in this manner. iii)General Contracting Method: The third important and noteworthy method of procurementforanyspecificprojectisthegeneralcontracting.Itisthetraditional methodology, by which the respective contractor agrees building the specified design, which is provided by the employer. The price of the contract is completely on the basis of the bill of quantities that is provided by the employer (Allen and Iano 2013). These contractors even price the several works without considering the BOQs or bill of quanities, such as drawings. However, the re measurement contracts and the cost contracts are not utilized widely in the constru0ction projects. The contract administrator is responsible for monitoring the project and delivering the project successfully by a general contracting method.
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS There are some of the major and the most significant characteristics of the general contracting method and these are provided below: a)Building of Owner’s Design: The first and the foremost characteristic of the general contracting methodology is the building of the owner’s design. This particular design is provided by the respective owner of the project (Langford et al. 2014). Hence, the project owner gets the priority for all construction projects. b)Regular Monitoring of Project: The second important characteristic or feature of the methodology of general contracting is the regular and periodical monitoring of projects. With this regular monitoring of projects, the faults and flaws could be easily identified and regular follow ups are possible here. c)Less Complex: This particular procurement methodology is absolutely lack of complexity and hence is being utilized by types of construction projects (Naoum and Egbu 2015). The project managers do not face any issue while executing such projects. Comparison and Contrast of the Three Procurement Methods The comparison and contrast of design build, design bid build and general contracting are as follows: Key Features Design Build Method Design Bid Build MethodGeneral Contracting Method 1.Time Consumption Designbuild method is complex isrespectiveto general contracting methodof The design bid build method is extremely complex than anyotherprocurement methodswithinthe construction projects (Shehu The general contracting method is considered as one of the most simple methods of procurement fortheconstruction
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS procurement in the construction projects. et al. 2014). There are three phasesinthedesignbid buildmethod,whichare designphase,biddingor tenderingphaseand construction phase. projects. 2.Approach ofthe Procurement Method Thedesignbuild procurement method is a modern approachforthe procurement purpose in projects. Thedesignbidbuild procurement method is also a modern approach similar to design build and is much popular. Thefinalorthethird procurement method in constructionprojectsis thegeneralcontracting (Rahman 2013). This is a traditionalapproachin project management and is being used by project managers significantly. 3.Levelof Efficiency and Effectiveness Designbuild procurement methodismuch more efficientand effectiveinany construction project (Hardin and McCool 2015). Thedesignbidbuild procurementmethodis consideredasthemost efficientandeffectivefor any construction project and isbeingutilizedbythe various project managers. The general contracting procurement method for any construction project isnotmucheffective andefficientin comparison to the other methods. This is mainly because it is a traditional approach. 4.CostThedesignbuildThedesignbidbuildThefinalprocurement
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS Effectivenessprocurement methodiscost effectiveandthus couldbeafforded byusersinthe construction projects. procurement methodology is also cost effective and thus can be easily afforded by all usersinthevarious constructionprojects (Kwakye 2014). methodologyisthe general contracting and thisisthemostcost effective in comparison to all other construction projects. 5. Advantages i) The first and the foremost advantage of the design build isthattheowner hasonlyone contractforthe designand constructionphase (Cheng 2014). ii) There is always a better opportunity forthesharingof project costs. iii)Moreover,the respectiveproject schedulecouldbe accelerated. i) The first and the foremost advantage of the design bid build is that the design and the construction phases do not overlap with one another andthuscouldbeeasily utilized. ii) This procurement method allowsdesigningand constructiontoallthe project owners or managers and hence is quite effective than other methods. iii)Thebiddingcostsare extremelylowerforthe maximumcompetition amongst the contractors. i)Thefirstandthe foremostadvantageof thegeneralcontracting procurement method in a construction project is thatthecomplexityis much lesser as it only involvesageneral contractorandthe project owner. ii)Theprojectbudget couldbeproperly controlledinthis particularprocurement method and hence there islesserchanceof budgetexceeding (Rahman 2013).
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS Kinds of Projects Suitable for Three Procurement Methods The design build procurement method is suitable for the contractor led constructions projects. Within the contractor led construction projects, the management is designed and structured in such a manner that the project owner could work directly with the contractor and this contractor could coordinate with the sub contractors. The design bid build procurement method is suitable for the private construction projects (Allen and Iano 2013). However, all types of projects are benefitted from this specific method. Thegeneralcontractingprocurementmethodissuitableforeachandevery construction project. There is no such restriction and hence it is a traditional approach. Recommendations for the Project Owners in Three Procurement Methods The few recommendations for the project owners or developers for the design build procurement method are as follows: i) The projects should be selected properly and wisely for the design build method. ii) The next recommendation is that the procurement as well as management of the design build project should be done adequately. iii) The proper maintenance of the communications within the design build team and contracting agencies is the other important recommendation. The few recommendations for the project owners or developers for the design bid build procurement method are as follows: i) A proper plan is required for this type of project to avoid the complexities.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS ii) The tender documents should be properly developed as there is no chance of changes in the construction phase. The few recommendations for the project owners or developers for the general contracting procurement method are as follows: i)Theselectionprocedureofcontractorsshouldbeincludedaftertheproper evaluation of various risks within the project. ii) The second recommendation for the general contracting procurement method is to ensure that conflicts do not arise within the project at all. Conclusion Therefore, from the above discussion, it can be concluded that procurement is the procedure for finding, agreeing the terms and conditions, acquiring goods and services from the external sources and finally tendering the bidding processes. This particular procedure is being utilized for ensuring that the buyer is receiving goods and services at the best possible costs and having the comparison of aspects like quality, quantity, location and time. Each and every purchasing decision like the delivery and handling, price fluctuations and marginal benefits are included here. The several conditions of scarcity are involved in this scenario. The construction projects have several vital and noteworthy procurement methods, which helps in making the project successful in respect to other project delivery types. The above report has properly outlined the comparison and contrasting of three procurement methods in a construction project. The utilization of all the procurement methods is also provided here. Moreover, some of the major recommendations are also provided are also given in this report.
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS References Allen, E. and Iano, J., 2013.Fundamentals of building construction: materials and methods. John Wiley & Sons. Brook, M., 2016.Estimating and tendering for construction work. Routledge. Cheng,Y.M.,2014.Anexplorationintocost-influencingfactorsonconstruction projects.International Journal of Project Management,32(5), pp.850-860. Hardin,B.andMcCool,D.,2015.BIMandconstructionmanagement:proventools, methods, and workflows. John Wiley & Sons. Hughes,W.,Champion,R.andMurdoch,J.,2015.Constructioncontracts:lawand management. Routledge. Jato-Espino, D., Castillo-Lopez, E., Rodriguez-Hernandez, J. and Canteras-Jordana, J.C., 2014.Areviewofapplicationofmulti-criteriadecisionmakingmethodsin construction.Automation in Construction,45, pp.151-162. Kwakye, A.A., 2014.Construction project administration in practice. Routledge. Langford, D., Fellows, R.F., Hancock, M.R. and Gale, A.W., 2014.Human resources management in construction. Routledge. Masterman, J. and Masterman, J.W., 2013.An introduction to building procurement systems. Routledge. Naoum,S.andEgbu,C.,2015.Criticalreviewofprocurementmethodresearchin construction journals.Procedia Economics and Finance,21, pp.6-13.
PROCUREMENT METHODS IN CONSTRUCTION PROJECTS Naoum, S.G. and Egbu, C., 2016. Modern selection criteria for procurement methods in construction: A state-of-the-art literature review and a survey.International Journal of Managing Projects in Business,9(2), pp.309-336. Porwal, A. and Hewage, K.N., 2013. Building Information Modeling (BIM) partnering framework for public construction projects.Automation in Construction,31, pp.204-214. Rahman, M.M., 2013. Barriers of implementing modern methods of construction.Journal of management in engineering,30(1), pp.69-77. Ruparathna, R. and Hewage, K., 2013. Review of contemporary construction procurement practices.Journal of management in engineering,31(3), p.04014038. Ruparathna, R. and Hewage, K., 2015. Sustainable procurement in the Canadian construction industry: current practices, drivers and opportunities.Journal of Cleaner Production,109, pp.305-314. Shehu, Z., Endut, I.R., Akintoye, A. and Holt, G.D., 2014. Cost overrun in the Malaysian constructionindustryprojects:Adeeperinsight.InternationalJournalofProject Management,32(8), pp.1471-1480.