logo

ITC 493 - Professional Engineer : Competency Element

7 Pages1317 Words225 Views
   

Charles Sturt University

   

Competency Demonstration Report (ITC 493)

   

Added on  2020-03-04

About This Document

This assignment will discuss a comprehensive theory-based understanding of the underpinning natural and physical sciences and the engineering fundamentals applicable to the engineering discipline. This assignment will also discuss the conceptual understanding of mathematics, numerical analysis, statistics, and computer information sciences. 

ITC 493 - Professional Engineer : Competency Element

   

Charles Sturt University

   

Competency Demonstration Report (ITC 493)

   Added on 2020-03-04

ShareRelated Documents
Professional Engineer: Summary StatementCompetency ElementA brief summary of how youhave applied the elementParagraph number in thecareer episode(s) where theelement is addressedPE 1 KNOWLEDGE AND SKILL BASEPE1.1 Comprehensive, theorybased understanding of theunderpinning natural andphysical sciences and theengineering fundamentalsapplicable to the engineeringdiscipline.I) The improvement of thestate and position of theindustrial unit would providegreater capacity andefficiency to the developmentof the economy of thecompany. II) The microcontroller basedfire alert framework depictedin this postulation, could bethe best thing to spare livesand diminish propertymisfortunes with minimaleffort. III) I had carried out themaintenancerecommendations by IS/IECstandards. The verificationprocedures intended tomaintain of the low voltageswitchgear system in itsoperating conditions.Career Episode 1: CE 1.3Career Episode 2: CE 2.1Career Episode 3: CE 3.1PE1.2ConceptualI) I always working with myCareer Episode 1: CE 1.11
ITC 493 - Professional Engineer : Competency Element_1
understanding of themathematics, numericalanalysis, statistics, andcomputer and informationsciences which underpin theengineering discipline.group member and completedthe project successfullydesign. Based on myknowledge and skills, projectmanager assigned me thedesigning and connecting theIR based sensor for thesending signal in both inputand output.II) The PIC 16F877Amicrocontroller acts as a heartof the Fire Alarm System.III) I had analyzed some offeatures of low circuit breakercircuits such as effectiveperformance, simplicity andhigher normal current ratedupon 600A. Career Episode 2: CE 2.8PE1.3In-depthunderstanding of specialistbodies of knowledge withinthe engineering discipline.I) I have observed that due tothe large quantity, the volumebatching was not possible.Therefore, I have selectedweight batching technique. II) I have observed andimplemented the systemsafety measured during thedevelopment of thewastewater treatment plant. Career Episode 1: CE 1.9Career Episode 3: CE 3.13Page 1 of 8
ITC 493 - Professional Engineer : Competency Element_2
PE1.4 Discernment ofknowledge development andresearch directions within theengineering discipline.I) I have studied the existingcomposition of materials forcalculating the parameters forup gradation and expansion.III) For developing theaccurate design of the pipingnetwork and fittings, I havestudies various articles, booksand journals. Career Episode 1: CE 1.8Career Episode 3: CE 3.5PE1.5 Knowledge ofcontextual factors impactingthe engineering discipline.I) In this project I havedeveloped the main objectiveof the project to upgrade theexisting steel production unit.II) I have developed the vitalobjective of the project fordeveloping and designing thefunctional elements ofWastewater Treatment Plant. III) The significant aim of theproject was to manage theelectrical work developedduring the project. Career Episode 1: CE 1.4Career Episode 2: CE 2.3Career Episode 3: CE 3.2.PE1.6 Understanding of thescope, principles, norms,accountabilities and boundsof contemporary engineeringpractice in the specificdiscipline.I) I have ensured LDRstandards for the removal ofthe framework. I have usedM-FAS for revising thedrawing for the project.II) I utilized the LDR (LightCareer Episode 1: CE 1.8Page 2 of 8
ITC 493 - Professional Engineer : Competency Element_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Professional Engineer: |Competency Element|Career Episodiod
|10
|2194
|226

Professional Engineering Sample Assignment
|6
|1539
|170

Project Designing of Wireless Sensor based Network
|8
|1176
|62

Report on Professional Engineering
|13
|2878
|30

Summary Statement: Competency Element
|12
|2649
|50

Assignment Professional Engineering
|7
|1046
|211