This summary statement showcases the competency units and elements of a Professional Engineer and how they have applied them in their career episodes.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
PROFESSIONAL ENGINEER Summary Statement These are the competency Units and Elements. Competency ElementA brief summary of how you have applied the element Paragraph number in the career episode(s) where the element is addressed PE1 KNOWLEDGE AND SKILL BASE PE1.1 Comprehensive, theory- based understanding of the underpinning natural and physical sciences and the engineering fundamentals applicable to the engineering discipline I set the standard and quality of the services being delivered at the most crucial factor for the satisfaction of the end users I had to analyse all the existing information relayed to the previously designed and working of the oil refinery and analysed them efficiently in manner to discuss the modifications those could bring into the light for accomplishing the better environment for the refinery I was assigned as the project engineer for the implementation of the necessary amendments those were necessary for the delivery of the project Career Episode 1: CE 1.2.1, CE 1.3.1 and CE 1.3.2 Career Episode 2: CE 2.3.1 and CE 2.3.3 Career Episode 3: CE 3.2.1, CE 3.3.1 and CE 3.3.2 PE1.2 Conceptual understanding of the mathematics, numerical I had to accomplish every responsibility as mentioned above in Career Episode 1: CE 1.3.1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
analysis, statistics and computer and information sciences which underpin the engineering discipline an efficient and effective manner I prepared a Check Sheet for Field Instruments to survey the existing condition of the field Instruments and sent the check sheet for End-user approval I evaluated End-user requirements and grouped it into “general design inputs” in line with their technical specifications Career Episode 2: CE 2.3.2, CE 2.3.3 and CE 2.3.4 Career Episode 3: CE 3.3.2 PE1.3 In-depth understanding of specialist bodies of knowledge within the engineering discipline I had to prepare a project schedule along with the planning Engineer to explain the customer about the critical milestones of the project during the Customer Kickoff Meeting I had to analyse all the existing information relayed to the previously designed and working of the oil refinery and analysed them efficiently in manner to discuss the modifications those could bring into the light for accomplishing the better environment for the refinery I was appreciated by the specialist for promoting company’s technology and my suggestion of going with wireless technology was approved by the specialist Career Episode 1: CE 1.3.1 Career Episode 2: CE 2.3.1, CE 2.3.4, CE 2.2.5 and CE 2.4.2 Career Episode 3: CE 3.3.1, CE 3.3.3 PE1.4 Discernment of knowledge development and research I had to accomplish every responsibility as mentioned above in Career Episode 1: CE 1.2.5, CE 1.3.1 and CE
directions within the engineering discipline an efficient and effective manner For Pneumatic transmitter, I propose to replace / Install new transmitter (HART/SMART) I managed to convince the End-user about long lasting advantages of wireless technology, cost savings, and the reduced time period of the project 1.4.2 Career Episode 2: CE 2.3.2, CE 2.3.4 and CE 2.4.1 Career Episode 3: CE 3.3.2, CE 3.3.3 and CE 3.4.1 PE1.5 Knowledge of contextual factors impacting the engineering discipline I set the objectives and goals for the successful delivery of the project I delivered the project considering the advancements those could be gained through researching the existing refineries and analyzing the market for proposing the best and effective options those could be gathered through effective and efficient amendments and modifications I had to execute the engineering design, assembly and testing of the developed system and make sure that the proposed system is capable of providing more than the expected outcome Career Episode 1: CE 1.2.1, CE 1.2.2, Career Episode 2: CE 2.2.1, CE 2.2.2 Career Episode 3: CE 3.2.1, CE 3.2.3 PE1.6 Understanding of the scope, principles, norms, accountabilities and bounds of contemporary I developed a well strategic and explained project plan that helped in motivating every other individual to Career Episode 1: CE 1.2.3, CE 1.3.3, CE 1.3.4 and CE 1.3.2
engineering practice in the specific discipline be specific and targeted towards the set goals and objectives I delivered the project in manner to understand the existing environment of the old refineries and implement the modifications those could bring revolution and enhance the services and products being delivered to the consumers I was given the responsibility to lead the project due to the successful completion of earlier projects by me Career Episode 2: CE 2.2.3, CE 2.3.1 and CE 2.3.2 Career Episode 3: CE 3.2.3, CE 3.3.1 and CE 3.3.2 PE2 ENGINEERING APPLICATION ABILITY PE2.1 Application of established engineering methods to complex engineering problem solving I developed a detailed project plan explaining every necessary activity and involved stakeholder in manner to make sure that every stakeholder is dedicated and concentric towards accomplishing the same activity I prepared a Check Sheet for Junction Boxes to survey the existing condition of the Junction Boxes and sent the check sheet for End-user approval I started my work by preparing detailed “Responsibility Assignment Matrix” which clearly defined the participation and responsibilities of internal departments, vendors and Career Episode 1: CE 1.2.4, CE 1.3.1 and CE 1.4.2 Career Episode 2: CE 2.3.3, CE 2.3.4 and CE 2.4.1, CE 2.4.2 Career Episode 3: CE 3.3.1, CE 3.3.2 and CE 3.4.2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
sub-contractors in completing tasks for a project in a given time span PE2.2 Fluent application of engineering techniques, tools and resources I was able to have an overall 10-15 percent cost reduction of Control system Hardware due to the reuse of existing System and Marshalling cabinets I prepared a Check Sheet for Control Systems to survey the existing condition of the related Panels and sent the check sheet for End-user approval I also made “Project Execution Plan” demonstrating each and every step, clearly showing the objectives of the project and how they will be accomplished as per site conditions Career Episode 1: CE 1.3.3, CE 1.3.2 and CE 1.3.1 Career Episode 2: CE 2.3.1, CE 2.3.2 and CE 2.3.3 Career Episode 3: CE 3.3.1, CE 3.3.2 and CE 3.3.3 PE2.3 Application of systematic engineering synthesis and design processes I took the next step to prepare and submit “Critical Design review” (CDR) report which consisted mostly of the software parts and the control logics created as per the project control narrative I prepared a Check Sheet for Junction Boxes to survey the existing condition of the Junction Boxes and sent the check sheet for End-user approval I started this project as a ‘Project Engineer’ in November 2015 and Career Episode 1: CE 1.2.3, CE 1.3.1 and CE 1.3.2 Career Episode 2: CE 2.3.3 and CE 2.3.4 Career Episode 3: CE 3.2.5
completed successfully in March 2016 PE2.4 Application of systematic approaches to the conduct and management of engineering projects I delivered the following deliverables including PDR are I/O Database in MS-EXCEL/MS-Access format containing DCS/ SIS / FGS / I/O details – Final for CDR (for software freeze), Mapping list in MS-EXCEL containing Sub-system I/O details I checked the condition of all Control valves including actuators, accessories, and evaluate requirement for overhauling or complete replacement of valve I also made “Project Execution Plan” demonstrating each and every step, clearly showing the objectives of the project and how they will be accomplished as per site conditions Career Episode 1: CE 1.3.1 and CE 1.3.2 Career Episode 2: CE 2.2.3, CE 2.3.1, CE 2.3.2 and CE 2.3.3 Career Episode 3: CE 3.3.1 and CE 3.3.2 PE3 ENGINEERING APPLICATION ABILITY PE3.1 Ethical conduct and professional accountability I managed to reduce the cost of the project by closely communicating with the End-user project team and tried to convince them about the deviations from the project specifications I contributed in leading the survey and developing the management plan that can allow specific roles and responsibilities for every individual involved in the project Career Episode 1: CE 1.2.3, CE 1.3.3 and CE 1.4.1 Career Episode 2: CE 2.2.3, CE 2.3.5 and CE 2.4.2
I full filled their expectations by reporting each and every aspect of the project on daily basis Career Episode 3: CE 3.3.3, CE 3.4 PE3.2 Effective oral and written communication in professional and lay domains I was very much aware of the given timelines for the completion of project as per management instructions, budget allocations and fulfilling the customer satisfaction by complying with the standards for Yokogawa product I made sure that every objective and activity of the project lead us towards certain results and output of the survey that can alternatively contribute in implementing the modernization within the old oil refineries I lead this project from the front foot and managed all the teams of design consultant, vendors, and engineers for successful completion of this highly strategic project Career Episode 1: CE 1.2.3, CE 1.3.3 and CE 1.4.1 Career Episode 2: CE 2.2.3, CE 2.3.5 and CE 2.4.2 Career Episode 3: CE 3.3.3, CE 3.4 PE3.3 Creative innovative and proactive demeanour I started my work by preparing detailed “Responsibility Assignment Matrix” which clearly defined the participation and responsibilities of internal departments, vendors and sub-contractors in completing tasks for a project in a given time span I managed the entire team on how to Career Episode 1: CE 1.3, CE 1.4 and CE 1.4.2 Career Episode 2: CE
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
execute the survey within specified timeline I had to install the control system and evaluate it at every stage of the execution of operational activities through the established control system 2.3.5, CE 2.4, CE 2.2.5 and CE 2.4.2 Career Episode 3: CE 3.2, CE 3.3 PE3.4 Professional use and management of information I was responsible for the successful and smooth implementation of control system revamp project from Design till Commissioning as per project specifications and SABIC Standards I was responsible for effectively and efficiently survey the old refinery through personally visiting and reviewing the machines and the ways in which the operations were being delivered I had to assure that the develop project is capable of assuring better benefits for the organization and better services can be delivered to the end-users without altering the standard and quality of the output Career Episode 1: CE 1.2.3, CE 1.2.5, CE 1.4.2 Career Episode 2: CE 2.2.3, CE 2.2.5, CE 2.4.2 Career Episode 3: CE 3.2.3, CE 3.2.5, CE 3.4.2 PE3.5 Orderly management of self, and professional conduct I set the standard and quality of the services being delivered at the most crucial factor for the satisfaction of the end users Career Episode 1: CE 1.4.1, CE 1.3.1 and CE 1.3.2
I thoroughly surveyed the old refinery and collected the existing documentation about the entire operational activities I analyzed the possibility of implementing Yokogawa’s wireless technology and discussed the project scope with the wireless product specialist Career Episode 2: CE 2.4.2, CE 2.3.2, CE 2.3.3 and CE 2.3.4 Career Episode 3: CE 3.4.2, CE 3.3.1 and CE 3.3.2 PE3.6 Effective team membership and team leadership I organized a meeting of both End- user project team and Yokogawa Project team for a review meeting to further clarify any expectations of End-users. Following this, the Design was finalized to start procuring the hardware I used the system backup to retrieve the hard IO’s which were coming from Field Instruments and I revalidated the Instrument Index I instructed the procurement team to procure installation related material locally to meet project timeline Career Episode 1: CE 1.4.1, CE 1.4.2 Career Episode 2: CE 2.4.1 and CE 2.4.2 Career Episode 3: CE 3.4.1 and CE 3.4.2