Professional Engineering: Summary Statement

Verified

Added on  2023/06/03

|7
|1144
|450
AI Summary
This document provides a summary statement for Professional Engineering competency elements including knowledge and skill base, engineering application ability, and professional and personal attributes. The document highlights how each element was applied in the career episode(s) where the element is addressed. The projects mentioned in the document include Design and Construction of New Orbital highway and Truck Route, Refurbishing and Upgrading Works for Various Pumping Stations (Phase 8), and Construction of Umm Al Houl Power Plant IWWP.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Professional Engineering: Summary Statement
Competency Element
A brief summary of how
you have applied the
element
Paragraph number in the
career episode(s) where the
element is addressed
PE 1 KNOWLEDGE AND SKILL BASE
PE1.1 Comprehensive,
theory based
understanding of the
underpinning natural
and physical sciences
and the engineering
fundamentals applicable
to the engineering
discipline.
1. This project report was
based on Design and
Construction of New Orbital
highway and Truck Route
Contract 3.
2. This particular project
report was based on the
Refurbishing and Upgrading
Works for Various Pumping
Stations (Phase 8).
3. This particular project
report was based on the
Construction of Umm Al
CE 1.1, CE 1.2 and CE 1.3
CE 2.1, CE 2.2 and CE 2.3
CE 3.1, CE 3.2 and CE 3.3

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Houl Power Plant IWWP.
PE1.2 Conceptual
understanding of the
mathematics, numerical
analysis, statistics, and
computer and
information sciences,
which underpin the
engineering discipline.
I have the abilities of critical
thinking and problem solving
that I have successfully
applied in this project.
CE 1.3.1
CE 2.3.1
CE 3.3.1
PE1.3 In-depth
understanding of
specialist bodies of
knowledge within the
engineering discipline
1. For the project of New
Orbital highway and Truck
Route Contract 3, I had the in
depth knowledge of advanced
construction.
2. For the project of Pumping
Stations, I had applied the in
depth knowledge of
hydraulics engineering.
3. For the project of Power
Plant, I have applied my
knowledge of construction
engineering.
CE 1.3.1 and CE 1.3.3
CE 2.3.1 and CE 2.3.3
CE 3.3.1 and CE 3.3.3
PE1.4 Discernment of I had tested and customized CE 1.3.3 and CE 1.3.5
Document Page
knowledge development
and research directions
within the engineering
discipline
the products. Furthermore, I
even had to perform various
testing using software.
CE 2.3.3 and CE 2.3.5
CE 3.3.3 and CE 3.3.5
PE1.5 Knowledge of
contextual factors
impacting the
engineering discipline.
The fault stimulations were
identified in the project and
proper efficient outputs were
obtained.
CE 1.3.1, CE 1.3.2
CE 2.3.1, CE 2.3.2
CE 3.3.1, CE 3.3.2
PE1.6 Understanding of
the scope, principles,
norms, accountabilities
and bounds of
contemporary
engineering practice in
the specific discipline
I maintained good relation
with my colleagues and this
helped to diminish the issues
of the projects. I undertook
the contemporary engineering
practice within my project.
CE 1.1, CE 1.3.1 and CE
1.3.2
CE 2.1.1, CE 2.3.1 and CE
2.3.2
CE 3.1.1, CE 3.3.1 and CE
3.3.2
PE 2 ENGINEERING APPLICATION ABILITY
PE2.1 Application of
established engineering
methods to complex
engineering problem
solving
I provided proper design after
solving the issues faced in
first attempt. I have applied
various software for
executing the three projects.
CE 1.3.3
CE 2.3.3
CE 3.3.3
PE2.2 Fluent application The engineering techniques CE 1.3.2 and CE 1.3.5
Document Page
of engineering
techniques, tools and
resources.
like advanced construction,
hydraulics engineering that I
had utilized in these project
were solely registered with
tremendous fluency. I have
even applied various
significant software and inter
personal communication
skills.
CE 2.3.2 and CE 2.3.5
CE 3.3.2 and CE 3.3.5
PE2.3 Application of
systematic engineering
synthesis and design
processes.
I have applied my acute
knowledge of project
management and network
design. Hence, the designing
of the buildings were done
easily.
CE 1.3.1, CE 2.3.1 and CE
3.3.1
PE2.4 Application of
systematic approaches to
the conduct and
management of
engineering projects
The three projects required
the considerations of few
destructive operation
conditions that were needed
for the applications.
CE 1.3.3 and CE 1.3.1
CE 2.3.3 and CE 2.3.1
CE 3.3.3 and CE 3.2.1
PE 3 PROFESSIONAL AND PERSONAL ATTRIBUTES
PE3.1 Ethical conduct
and professional
Accountability
1. I made sure that I was
extremely ethical during all
the projects and thus my
CE 1.3.2, CE 1.3.3, CE 2.3.2,
CE 2.3.3, CE 3.3.2 and CE

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
ethical conduct and
professional accountability
was maintained.
2. The codes of conduct were
being followed by me for
executing this project
properly and hence I was
successful in completing my
work.
3. I have maintained work
ethics and made sure that my
rest of the team members are
also maintaining them in this
project.
3.3.3
PE3.2 Effective oral and
written communication
in professional and lay
domains
I have fluency in three major
languages and have excellent
written communication skills
for the professional fields.
CE 1.3.3, CE 1.3.4, CE 1.3.5,
CE 2.3.3, CE 2.3.4, CE 2.3.5,
CE 3.3.3, CE 3.3.4 and CE
3.3.5
PE3.3 Creative,
innovative and pro-
active demeanour
I was extremely creative and
provided innovative ideas for
the betterment of the projects.
CE 1.3.3, CE 2.3.3 and CE
3.3.3
PE3.4 Professional use
and management of
1. Although I came across
various problems, I utilized
CE 1.3.3, CE 1.3.4, CE 1.3.5,
CE 2.3.3, CE 2.3.4, CE 2.3.5,
Document Page
information
my professional skills and
intellect for solving them and
thus was successful in
achieving them.
2. As I had managerial skills,
I have the ability to manage
the entire team and in absence
of my supervisor, I showed
my managerial skills here.
3. I have successfully used
my professional and
management skills to manage
the confidential information.
CE 3.3.3, CE 3.3.4 and CE
3.3.5
PE3.5 Orderly
management of self and
professional conduct
1. I managed the professional
conduct and managed myself
and all the team members
perfectly.
2. With the help of work
ethics and managerial skills, I
had managed myself in this
project properly and given
work progress report to my
supervisor.
CE 1.3.3, CE 1.3.4, CE 1.3.5,
CE 1.3.4, CE 2.3.3, CE 2.3.4,
CE 2.3.5, CE 2.3.4 CE 3.3.3,
CE 3.3.4, CE 3.3.4 and CE
3.3.5
Document Page
3. I took regular follow ups of
the project for checking
whether the project was being
executed as per planning or
not. I even noted the attitude
of my team members towards
work.
PE3.6 Effective team
membership and team
leadership
1. This project was completed
with excellent team work and
proper team leadership.
2. I have excellent leadership
skills; and in the absence of
my project supervisor, I
managed the team.
3. Being the civil engineer in
this project. I had divided the
work equally amongst the
team members, so that
everyone could work
properly.
CE 1.4.4, CE 2.4.4 and CE
3.4.4
1 out of 7
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]