Professional Practice in Construction Research Paper 2022

Describe and analyze the positive and negative aspects of three different procurement methods for construction projects, including conventional and new methods. Consider the benefits and problems for various stakeholders and make recommendations for different project types.

19 Pages3202 Words30 Views
   

Added on  2022-10-15

Professional Practice in Construction Research Paper 2022

Describe and analyze the positive and negative aspects of three different procurement methods for construction projects, including conventional and new methods. Consider the benefits and problems for various stakeholders and make recommendations for different project types.

   Added on 2022-10-15

ShareRelated Documents
University
Professional Practice in Construction
By
Your Name
Date
Page 1 of 19
© <Your Name> 2019
Professional Practice in Construction Research Paper 2022_1
Table of Contents
Executive Summary................................................................................................ 3
Introduction............................................................................................................. 3
Conventional Procurement.................................................................................... 3
Traditional Procurement Method......................................................................4
Characteristics.................................................................................................. 4
Advantages........................................................................................................ 5
Disadvantages................................................................................................... 6
Benefits to stakeholders.................................................................................7
Limitations to Stakeholders............................................................................7
Modern Procurement methods.............................................................................8
Management Contracting Procurement and Construction Management
Procurement......................................................................................................... 8
Characteristics.................................................................................................. 8
Advantages........................................................................................................ 8
Disadvantages................................................................................................... 9
Benefits to stakeholders.................................................................................9
Limitations to Stakeholders..........................................................................10
Design -Build Procurement Method................................................................10
Characteristics................................................................................................ 10
Advantages...................................................................................................... 11
Disadvantages................................................................................................. 11
Benefits to stakeholders...............................................................................11
Limitations to Stakeholders..........................................................................12
Similarity and Difference Chart for Construction Method.............................12
Recommendations................................................................................................ 13
Conclusion.............................................................................................................. 14
Disclaimer.............................................................................................................. 14
References............................................................................................................. 15
Page 2 of 19
© <Your Name> 2019
Professional Practice in Construction Research Paper 2022_2
Professional Practice in Construction
Executive Summary
The success of a procurement project is greatly dependent on the
procurement method involved. The different procurement methods
employed in the contrition industry have their own distinguishing features,
pros, cons and the ways in which they affect the stakeholders. Nevertheless,
the choice of a procurement method depends on the client’s choice, the
resources available, the amount of time the project should consume, the
complexity or simplicity of the project and the quality of work the client
anticipates.
Introduction
The process of procurement promotes the ease of obtaining resources and
materials for a construction project. Different procurement methods are
employed to effectively execute a project (Oyegoke, Dickinson, Khalfan,
McDermott, and Rowlinson, 2009). The purpose of the paper is to present the
conventional and modern procurement methods in the construction industry,
stating their advantages, disadvantages, characteristics and how they
impact stakeholders.
Conventional Procurement
Conventional procurement is a method of procurement that has been
existing in the construction industry for a very long period of time
(Sethuraman, Perera, and Sumanarathna, 2016). The use of conventional
Page 3 of 19
© <Your Name> 2019
Professional Practice in Construction Research Paper 2022_3
procurement in the construction industry began with the emergence of
independent client consultants and general firms of contracting (Ruparathna
and Hewage, 2015). The conventional method illustrated is the traditional
procurement method
Traditional Procurement Method
Traditional procurement route is a type of procurement where the design
activities are separated from the construction activities. The client hires an
architect, a consultant or a contractor distinctly (Vilasini, Neitzert, and
Rotimi, 2011). The architect or the consultant is employed to produce the
design and the related specifications the requirements of the client while the
contractor is hired to contract the building. The design has to be completed
before the construction work is handed to the contractor. The contractor
given charge of the contracting activity is determined through a tendering
process (Chin, 2010). In the tendering process, client provide the tendering
document together with the design and specifications provided in the initial
stage to the interested competing contractors. The contractors in turn fill the
document with all the necessities required to complete the cost including the
price of the project and submit the filled document back to the contractor.
The contractor who bids for the project with the lowest cost of project
execution is awarded the tender and assumes the responsibilities related
construction (Chan, 2011).
Characteristics
The features that define the traditional procurement route are:
Page 4 of 19
© <Your Name> 2019
Professional Practice in Construction Research Paper 2022_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Professional Practice Project 2022
|17
|3124
|8

Introduction 3 Traditional Method of Procurement 4 Characteristics 5 Advantages 5 Disavors 5 Benefit to Stakeholder 6 Management Procurement 9 Design and Build Procurement 9 Design and Build Procureme
|19
|2862
|194

Procurement Assignment 2022
|11
|2590
|16

Strategic Construction Procurement: Methods
|17
|4299
|43

Procurement Method Assignment 2022
|12
|2822
|6

Strategic Procurement Systems - PDF
|18
|4568
|88