PROJECT DESIGN AND IMPLEMENTATION
2
Executive Summary
This report focuses on the design and implementation of the project namely Monet Holiday Park.
Brief background of the project has been given. With the aim of diversifying business, Penny
Moore and Ben Andrews have aimed to sell their first project Monet Guest House and establish
the park in the country side. The land of Plwmp pond will be used in order to establish the park.
Different theoretical frameworks related to project have been discussed. Furthermore, different
phases associated with the project have also been highlighted in the paper.
Project Design and Implementation - Monet Holiday Park_2

PROJECT DESIGN AND IMPLEMENTATION
3
Table of Contents
Introduction:....................................................................................................................................4
Literature review:.............................................................................................................................4
Assessment of the project phases:...................................................................................................8
Discuss skills developed:...............................................................................................................10
Analysis of Actions:......................................................................................................................11
Conclusion:....................................................................................................................................12
References:....................................................................................................................................13
Appendix 1: Learning from the project.........................................................................................16
Project Design and Implementation - Monet Holiday Park_3

PROJECT DESIGN AND IMPLEMENTATION
4
Introduction:
Managing project in an appropriate manner is one of the most significant factors of
completing a project in a timely and cost effective manner by aligning all the resources in a
proper order. Project management plays a critical role in terms of ensuring the fact that a real
value has been developed against the business objectives (Kerzner 2017). Present paper will put
forth the discussion of the design and implementation of the project namely Monet Holiday Park
project brief.
According to the case study, Monet guesthouse is the dream project of Penny Moore and
Ben Andrews who are childhood friend. However, after being married, Penny Moore and Ben
Andrews are willing to diversify their business in the country side. This is the reason, for which
both of them along with shareholders like Penny’s husband and Ben’s wife have decided to sell
the Monet guesthouse in order to develop Monet Holiday Park. An in-depth literature review will
be conducted in order to evaluate different theories and models related to project design and
implementation. Various phases of the project will also be evaluated. Furthermore, in this paper,
the skills required for the consultant of Rekmark Consultancy will be identified. In addition to
that, this paper will also evaluate the actions that are required to complete appropriately.
Literature review:
Appropriate design and implementation of project is the key factor of completing a
project within the required deadline. In-depth planning is the key step of completing carrying out
a project (Meredith et al. 2017). This is the way, through which all the valuable resources can be
aligned properly which is very much needed in terms of amplifying the inner value of the
Project Design and Implementation - Monet Holiday Park_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Monet Holiday Park Case Study
|18
|3682
|80