This report delves into the design and implementation of a project aimed at integrating chatbots and extensive social media features into the Bandcamp website. The project aims to enhance customer service, expand the user base, and improve the overall user experience. The report outlines the project's specifications, identifies relevant resources, analyzes the project's outcomes, and provides recommendations for future considerations. It explores the challenges and risks associated with the project, including technical complexities, resource management, and security vulnerabilities. The report also discusses the project's impact on the organization's brand value, customer engagement, and revenue generation.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

Project design and
implementation
implementation
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

TABLE OF CONTENTS
Introduction......................................................................................................................................1
Task 1...............................................................................................................................................2
1.1 Formulate and record possible outline project specifications................................................2
1.2 identify the factors that contribute to the process of project selection..................................7
1.3 produce a specification for the agreed project.......................................................................9
1.4 produce an appropriate project plan for the agreed project.................................................12
Task 2.............................................................................................................................................13
2.1 Match relevant resources efficiently to the project from the given case study....................13
2.2 Undertake the proposed project in accordance with the agreed specification.....................15
2.3 organise, analyse and interpret relevant outcomes..............................................................16
Task 3.............................................................................................................................................18
3.1 use appropriate project evaluation techniques.....................................................................18
3.2 interpret and analyse the results in terms of the original project specification...................20
3.3 make recommendations and justify areas for further consideration....................................22
Task 4.............................................................................................................................................24
4.1 produce a record of all project procedures used..................................................................24
4.2 use an agreed format and appropriate media to present the outcomes of the project to an
audience.....................................................................................................................................26
Conclusion.....................................................................................................................................27
References......................................................................................................................................28
Introduction......................................................................................................................................1
Task 1...............................................................................................................................................2
1.1 Formulate and record possible outline project specifications................................................2
1.2 identify the factors that contribute to the process of project selection..................................7
1.3 produce a specification for the agreed project.......................................................................9
1.4 produce an appropriate project plan for the agreed project.................................................12
Task 2.............................................................................................................................................13
2.1 Match relevant resources efficiently to the project from the given case study....................13
2.2 Undertake the proposed project in accordance with the agreed specification.....................15
2.3 organise, analyse and interpret relevant outcomes..............................................................16
Task 3.............................................................................................................................................18
3.1 use appropriate project evaluation techniques.....................................................................18
3.2 interpret and analyse the results in terms of the original project specification...................20
3.3 make recommendations and justify areas for further consideration....................................22
Task 4.............................................................................................................................................24
4.1 produce a record of all project procedures used..................................................................24
4.2 use an agreed format and appropriate media to present the outcomes of the project to an
audience.....................................................................................................................................26
Conclusion.....................................................................................................................................27
References......................................................................................................................................28

LIST OF TABLES
Table 1: Factors contributing project selection process..................................................................7
Table 2: Project plan......................................................................................................................12
Table 3: Periodic logbook..............................................................................................................16
Table 1: Factors contributing project selection process..................................................................7
Table 2: Project plan......................................................................................................................12
Table 3: Periodic logbook..............................................................................................................16

LIST OF FIGURES
Figure 1: Project's life cycle............................................................................................................3
Figure 2: Chatbot integrations.........................................................................................................3
Figure 3: Different Social media platforms.....................................................................................4
Figure 1: Project's life cycle............................................................................................................3
Figure 2: Chatbot integrations.........................................................................................................3
Figure 3: Different Social media platforms.....................................................................................4
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Introduction
In the present report, the discussion is made regarding the execution and completion of a project
including various stages like project design, project implementation and the process of
evaluation for a music organization name ‘Bandcamp.’ This report will be providing proper
detail of project outline along with specialization by considering a variety of factors. This report
will be discussing the project design and the process of managing it through the implementation
of various tools and techniques. The complete overview of the project execution will also be
discussed in the present report along with different methods and approaches used for the
accomplishment of the project along with the desired outcomes.
1
In the present report, the discussion is made regarding the execution and completion of a project
including various stages like project design, project implementation and the process of
evaluation for a music organization name ‘Bandcamp.’ This report will be providing proper
detail of project outline along with specialization by considering a variety of factors. This report
will be discussing the project design and the process of managing it through the implementation
of various tools and techniques. The complete overview of the project execution will also be
discussed in the present report along with different methods and approaches used for the
accomplishment of the project along with the desired outcomes.
1

Task 1
1.1 Formulate and record possible outline project specifications
About
Bandcamp is an online music company that was founded in the year 2008. Since then it’s been
serving as a global music community. Here, fans can discover music and also directly support
artists. The mission of Bandcamp is to create and offer the best possible service for both artists
and listener along with labels sharing that will ultimately lead to earn profit and revenue from
their music. Andy Thomas and Tanukichan, are some of the most popular and featured artists on
Bandcamp website. About 15% is charged the organization per transaction, but this also helps
artists for directly reaching the customers through the organizational website.
Role of project life-cycle
Project life-cycle includes numerous stages. Initiation of the project is mostly associated with the
development of a concept and to understand the project requirements. Planning of project is the
next stage in the life cycle of the project, in this stage resources required for execution of the
plan is determined, and organizational capabilities are used for mapping the goals and objective
so that proper outcome can be achieved. In this stage, a detailed corporate plan is prepared for
online Chatbot integration and to provide Extensive Social Media integration on the
organizational website for user access (Bonham, 2005). Next stage is project execution. Here the
focus is given to all the activities and operation that are to be performed for project completion in
the most systematic manner and by maintaining performance and quality so that the pre-
determined goal can be achieved. Project monitoring and control is the next consequent stage it
ensures project capabilities for meeting the fundamental performance and quality presumed. The
last stage of the project life-cycle is Project closure; this stage is one of the most crucial scenes as
declared the completion of the project and resource handover.
2
1.1 Formulate and record possible outline project specifications
About
Bandcamp is an online music company that was founded in the year 2008. Since then it’s been
serving as a global music community. Here, fans can discover music and also directly support
artists. The mission of Bandcamp is to create and offer the best possible service for both artists
and listener along with labels sharing that will ultimately lead to earn profit and revenue from
their music. Andy Thomas and Tanukichan, are some of the most popular and featured artists on
Bandcamp website. About 15% is charged the organization per transaction, but this also helps
artists for directly reaching the customers through the organizational website.
Role of project life-cycle
Project life-cycle includes numerous stages. Initiation of the project is mostly associated with the
development of a concept and to understand the project requirements. Planning of project is the
next stage in the life cycle of the project, in this stage resources required for execution of the
plan is determined, and organizational capabilities are used for mapping the goals and objective
so that proper outcome can be achieved. In this stage, a detailed corporate plan is prepared for
online Chatbot integration and to provide Extensive Social Media integration on the
organizational website for user access (Bonham, 2005). Next stage is project execution. Here the
focus is given to all the activities and operation that are to be performed for project completion in
the most systematic manner and by maintaining performance and quality so that the pre-
determined goal can be achieved. Project monitoring and control is the next consequent stage it
ensures project capabilities for meeting the fundamental performance and quality presumed. The
last stage of the project life-cycle is Project closure; this stage is one of the most crucial scenes as
declared the completion of the project and resource handover.
2

Figure 1: Project's life cycle
(Source: Project's life cycle, 2018)
Considerable functions
Chatbot integrations: Including a Chatbot in the organizational website is considered very
important, as this added feature will be effectively making the website as helpdesk for the users
that want to connect to the organizational service from both customers and artist point of view
(Yan et al. 2016). Queries can be solved faster which evaluates the level of customer service.
With the help of Chatbot Bandcamp can perform the survey for understanding the customer's
experience, expectation, and requirement.
Figure 2: Chatbot integrations
3
(Source: Project's life cycle, 2018)
Considerable functions
Chatbot integrations: Including a Chatbot in the organizational website is considered very
important, as this added feature will be effectively making the website as helpdesk for the users
that want to connect to the organizational service from both customers and artist point of view
(Yan et al. 2016). Queries can be solved faster which evaluates the level of customer service.
With the help of Chatbot Bandcamp can perform the survey for understanding the customer's
experience, expectation, and requirement.
Figure 2: Chatbot integrations
3
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Extensive Social Media integration: Through social media more number of artist and listeners
can connect with the services offered by Bandcamp. Social media integration helps in expanding
the business network (Tebbe, and SAP, 2015. ). Social media integration supports the handling
of social timeline activities. Events can be displayed, and the new artist can be featured using the
social media that will be attracting more customers or listeners
Figure 3: Different Social media platforms
Department involved
The Technical department of the organization is responsible for analyzing all the business
necessities. Along with the marketing department, the technical department can effectively
collect details regarding the present market challenges and trends. Technical department with
proper communication with the accounting department can manage the financial requirements.
The management can adequately understand the capabilities and scope of the organization.
Aim of the Project
The main aim of the current project is to integrate the Chatbot and Extensive Social Media in the
organizational website.
Objectives of the project
4
can connect with the services offered by Bandcamp. Social media integration helps in expanding
the business network (Tebbe, and SAP, 2015. ). Social media integration supports the handling
of social timeline activities. Events can be displayed, and the new artist can be featured using the
social media that will be attracting more customers or listeners
Figure 3: Different Social media platforms
Department involved
The Technical department of the organization is responsible for analyzing all the business
necessities. Along with the marketing department, the technical department can effectively
collect details regarding the present market challenges and trends. Technical department with
proper communication with the accounting department can manage the financial requirements.
The management can adequately understand the capabilities and scope of the organization.
Aim of the Project
The main aim of the current project is to integrate the Chatbot and Extensive Social Media in the
organizational website.
Objectives of the project
4

The primary target of the current undertaken project can be attained by following and achieving
the objectives:
• To recognize the business requirements along with capabilities for serving customers and
for improving the services offered to the artists.
• To investigate the scope for the integration of Chatbot and Extensive Social Media for
engaging customers and to provide adequate customer services.
• To establish proper solution and approaches so that integration of Chatbot and Extensive
Social Media in the official website of Bandcamp along with business constraints.
Challenge and restraints
For the organization, selection of technology and expertise in the process of integrating the
feature is quite challenging. The business structure is changing rapidly with the facilities like
online customer service. Complexities of management and vulnerabilities due to online services
may arise that will impact the overall performance and quality of services offered. Time and
expertise in integrating the features are the primary business constraints (Kerzner, and Kerzner,
2017). Completion of the project within the defined period is very challenging with
compromising the quality.
Risk implicated
Delay is considered as the significant risk in project execution. Along with that, the project may
come across issues of security due to vulnerabilities with the use of social media and other
internet services (Burke, 2013). The project also has the risk of proper resource management and
monitoring the quality maintenance
Outcome Expected
The implementation of Social Media integration effectively delivers a broader customer base. It
increases the listener’s visits and helps in business extension. Also, Chatbot integration helps in
improving customer service by resolving issues of transactional errors, music availability, etc.
social media helps in promoting their services and products and for increasing the customer
engagement with the organizational business.
5
the objectives:
• To recognize the business requirements along with capabilities for serving customers and
for improving the services offered to the artists.
• To investigate the scope for the integration of Chatbot and Extensive Social Media for
engaging customers and to provide adequate customer services.
• To establish proper solution and approaches so that integration of Chatbot and Extensive
Social Media in the official website of Bandcamp along with business constraints.
Challenge and restraints
For the organization, selection of technology and expertise in the process of integrating the
feature is quite challenging. The business structure is changing rapidly with the facilities like
online customer service. Complexities of management and vulnerabilities due to online services
may arise that will impact the overall performance and quality of services offered. Time and
expertise in integrating the features are the primary business constraints (Kerzner, and Kerzner,
2017). Completion of the project within the defined period is very challenging with
compromising the quality.
Risk implicated
Delay is considered as the significant risk in project execution. Along with that, the project may
come across issues of security due to vulnerabilities with the use of social media and other
internet services (Burke, 2013). The project also has the risk of proper resource management and
monitoring the quality maintenance
Outcome Expected
The implementation of Social Media integration effectively delivers a broader customer base. It
increases the listener’s visits and helps in business extension. Also, Chatbot integration helps in
improving customer service by resolving issues of transactional errors, music availability, etc.
social media helps in promoting their services and products and for increasing the customer
engagement with the organizational business.
5

Assumptions
It has been assumed that management and the accounting department is available. However, the
available resources are capable of project completion within the expected time. It has been
assumed that there is a pre-established guide for establishing communication, finance
management and leadership (Turner, 2016).
6
It has been assumed that management and the accounting department is available. However, the
available resources are capable of project completion within the expected time. It has been
assumed that there is a pre-established guide for establishing communication, finance
management and leadership (Turner, 2016).
6
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

1.2 identify the factors that contribute to the process of project selection
Table 1: Factors contributing project selection process
Factors Extensive Social Media integration Chatbot integrations
Funds For server, software required and
hardware implementation at least $10,000
is required..
$15,000 is required for initial software
setup on computers as well as website.
Expense of $1.5/hour is needed per agent
is needed.
Technical
skills required
For integrating extensive social media
services, various skills are required to
understand the formats so that changes
can be made accordingly in the website.
Skills are needed for optimizing the cost
and time on the user device and to
enhance overall performance (Fuchs,
2017).
For preparing the user interface the
organization needs proper Technical
skills. Through this Chatbot, an option
can be integrated into the website,
through which customer service can be
enhanced and to engage more customers.
The technical expertise is also needed for
monitoring customer characteristics and
to understand their need and
requirements.
Human
resource
The team of at most six people is needed
for designing and integrating the social
media service with the organizational
website to enhance its performance and
functions..
Human resources of 8 people are needed
for analyzing the overall functionality,
and to understand the need and
requirement of the customers.
Profit By authenticating the users the
unauthorized sharing and download can
be prevented. Through social media, the
cost can be optimized for advertisement,
marketing and promoting various services
and product.
Customer engagement is enhanced, and
issues are resolved in real time. Customer
needs can be understood, and changes can
be made accordingly (Kerzner, and
Kerzner, 2017).
Organizational Business reputations and brand value will Brand values and services will be
7
Table 1: Factors contributing project selection process
Factors Extensive Social Media integration Chatbot integrations
Funds For server, software required and
hardware implementation at least $10,000
is required..
$15,000 is required for initial software
setup on computers as well as website.
Expense of $1.5/hour is needed per agent
is needed.
Technical
skills required
For integrating extensive social media
services, various skills are required to
understand the formats so that changes
can be made accordingly in the website.
Skills are needed for optimizing the cost
and time on the user device and to
enhance overall performance (Fuchs,
2017).
For preparing the user interface the
organization needs proper Technical
skills. Through this Chatbot, an option
can be integrated into the website,
through which customer service can be
enhanced and to engage more customers.
The technical expertise is also needed for
monitoring customer characteristics and
to understand their need and
requirements.
Human
resource
The team of at most six people is needed
for designing and integrating the social
media service with the organizational
website to enhance its performance and
functions..
Human resources of 8 people are needed
for analyzing the overall functionality,
and to understand the need and
requirement of the customers.
Profit By authenticating the users the
unauthorized sharing and download can
be prevented. Through social media, the
cost can be optimized for advertisement,
marketing and promoting various services
and product.
Customer engagement is enhanced, and
issues are resolved in real time. Customer
needs can be understood, and changes can
be made accordingly (Kerzner, and
Kerzner, 2017).
Organizational Business reputations and brand value will Brand values and services will be
7

reputation be the increase that ultimately leads to
high revenue. More customers get
involved with the organizational
activities.
improved with fast customer service by
resolving their queries with less time..
The undertaken project is within organizational resources and capabilities. The project is
associated with integrating social media and Chatbot for improving the organizational services
and to reduce complexities for the organization as well as customers.
8
high revenue. More customers get
involved with the organizational
activities.
improved with fast customer service by
resolving their queries with less time..
The undertaken project is within organizational resources and capabilities. The project is
associated with integrating social media and Chatbot for improving the organizational services
and to reduce complexities for the organization as well as customers.
8

1.3 produce a specification for the agreed project
The presently undertaken project has predetermined goal for integrating Social Media integration
and Chatbot that enhanced customer services for customer’s satisfaction. The specification of the
project majorly focuses on the mentioned stages:
Specification of the requirements
One of the significant requirements Band is to enhance the customer services with the integration
of Chatbot and social media. Presently the organization is expanding its services and developing
with the involvement of many users and artists. And the organization is opting for starting live
events and concerts through its official website. Thus, to support customer queries and to attract
more artist and customers these features are added (Marchewka, 2014). One of the organizational
requirements is to minimize the overall cost and to enhance customer support through the real-
time chat system.
Systems analysis
The project considers that the present business practices of the organization are effectual in
supporting the execution of the plan (Yan et al. 2016). The agile practitioners support the project
execution in the most effective ways. The system required a new login system for managing
users along with their while using social media and for making payments. The organization
needs to make various changes in its code for integrating Chatbot and Social media services for
providing customer service.
Feasibility study
The organization is earning revenue through its music services and has a very high scope for
improvement in their offered services by increasing the customer involvement. Thus, the
organization needs to invest for cost and time for system designing (Meredith et al. 2014). The
undertaken project is compatible with the existing organizational website. Feasibility of the
project includes cost, size, scope, time along with resources.
Software systems
9
The presently undertaken project has predetermined goal for integrating Social Media integration
and Chatbot that enhanced customer services for customer’s satisfaction. The specification of the
project majorly focuses on the mentioned stages:
Specification of the requirements
One of the significant requirements Band is to enhance the customer services with the integration
of Chatbot and social media. Presently the organization is expanding its services and developing
with the involvement of many users and artists. And the organization is opting for starting live
events and concerts through its official website. Thus, to support customer queries and to attract
more artist and customers these features are added (Marchewka, 2014). One of the organizational
requirements is to minimize the overall cost and to enhance customer support through the real-
time chat system.
Systems analysis
The project considers that the present business practices of the organization are effectual in
supporting the execution of the plan (Yan et al. 2016). The agile practitioners support the project
execution in the most effective ways. The system required a new login system for managing
users along with their while using social media and for making payments. The organization
needs to make various changes in its code for integrating Chatbot and Social media services for
providing customer service.
Feasibility study
The organization is earning revenue through its music services and has a very high scope for
improvement in their offered services by increasing the customer involvement. Thus, the
organization needs to invest for cost and time for system designing (Meredith et al. 2014). The
undertaken project is compatible with the existing organizational website. Feasibility of the
project includes cost, size, scope, time along with resources.
Software systems
9
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

The organization can opt for purchasing software for enhancing the customer service
management that can use the processed data for the process of proper decision making and for
monitoring the quality of service offered. The appropriate software is needed to for Chatbot
integration in the website that provides real-time services to the customers. Particular software is
required for the organization to manage and monitor backend services as are necessary for
authentication, monitoring user activities.
Hardware systems
For fetching the data and queries on the website, the organization needs to implement the highly
proficient server. A proper storage system is also required for minimizing the loading and storing
videos and music. Suitable hardware is necessary for the programmers and customer service
agents working on the project.
Algorithms
It is expected that the current project must be completed through parallel resource utilization for
adding feature of integration in the organizational website.
Algorithm- Initialize
Search available resource from set
Allocate module
Monitor execution
If pass: Assign new
Else: Repeat
Utilize output of other modules
Integrate
Algorithm-Finish
Project Designs
It has been planned that Chatbot will be situated in the extreme bottom right corner of the
webpage. This will be solving customer queries and question. The user can make general queries
and communication can be set with the assigned agent. In case of genera queries the pre-fetch
data in the Chatbot can reply in real time. The project also involves choosing the bets social
10
management that can use the processed data for the process of proper decision making and for
monitoring the quality of service offered. The appropriate software is needed to for Chatbot
integration in the website that provides real-time services to the customers. Particular software is
required for the organization to manage and monitor backend services as are necessary for
authentication, monitoring user activities.
Hardware systems
For fetching the data and queries on the website, the organization needs to implement the highly
proficient server. A proper storage system is also required for minimizing the loading and storing
videos and music. Suitable hardware is necessary for the programmers and customer service
agents working on the project.
Algorithms
It is expected that the current project must be completed through parallel resource utilization for
adding feature of integration in the organizational website.
Algorithm- Initialize
Search available resource from set
Allocate module
Monitor execution
If pass: Assign new
Else: Repeat
Utilize output of other modules
Integrate
Algorithm-Finish
Project Designs
It has been planned that Chatbot will be situated in the extreme bottom right corner of the
webpage. This will be solving customer queries and question. The user can make general queries
and communication can be set with the assigned agent. In case of genera queries the pre-fetch
data in the Chatbot can reply in real time. The project also involves choosing the bets social
10

media platform for marketing, advertisement and promoting the services and product offered by
the organization.
Different approaches for solving specific issues
The organization can effectively implement third-party applications for providing customer
service software or for adding the new feature to its website. It can use either own or shared
server Chatbot. The elements can be directly integrated on the official website or option like
redirecting can be used by signing the contract with partner websites like social media for
offering customer services. To meet the requirements of the customers, the organization can use
user interfaces and multiple programming languages.
Technique of solve issues
Current the project implements trial and success approach for resolving its issues. In most cases,
the pre-defined standard or methods are applied for reducing time wastage and cost optimization
during project execution.
Improving present system
Though Chatbot, customer queries can be solved faster and easier. Moreover, integration with
the social media will be helpful for the organization to expand its business and to reach and
attract more customers towards its product and services offered.
11
the organization.
Different approaches for solving specific issues
The organization can effectively implement third-party applications for providing customer
service software or for adding the new feature to its website. It can use either own or shared
server Chatbot. The elements can be directly integrated on the official website or option like
redirecting can be used by signing the contract with partner websites like social media for
offering customer services. To meet the requirements of the customers, the organization can use
user interfaces and multiple programming languages.
Technique of solve issues
Current the project implements trial and success approach for resolving its issues. In most cases,
the pre-defined standard or methods are applied for reducing time wastage and cost optimization
during project execution.
Improving present system
Though Chatbot, customer queries can be solved faster and easier. Moreover, integration with
the social media will be helpful for the organization to expand its business and to reach and
attract more customers towards its product and services offered.
11

1.4 produce an appropriate project plan for the agreed project
Table 2: Project plan
Activity/ week 1st week 2nd week 3rd week 4th week 5th week 6th week
Specification of requirement
Systems analysis
Viability study
Software required
Algorithms
Hardware required
Designs
Approaches of problem solving
Selection of programming languages
User interfaces
Developing new technique of problem solving
Improvement in current system
Evaluate diverse approaches
Substitute application
12
Table 2: Project plan
Activity/ week 1st week 2nd week 3rd week 4th week 5th week 6th week
Specification of requirement
Systems analysis
Viability study
Software required
Algorithms
Hardware required
Designs
Approaches of problem solving
Selection of programming languages
User interfaces
Developing new technique of problem solving
Improvement in current system
Evaluate diverse approaches
Substitute application
12
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Task 2
2.1 Match relevant resources efficiently to the project from the given case study
With the help of the following available resources, the project execution and completion will
require minimum time with cost optimization, and the overall project will be completed with the
estimated constraints:
Human resources: For implementation and successful running of the undertaken project, the
organization exclusively requires team consisting of 6 and eight members respectively for
integrating Chatbot and Social media platform. The primary purpose and aim of these resources
are to maintain and monitor the service quality, strategies preparation, activity execution and
data collection.
Hardware tools: For the execution of the project, the organization needs to develop different
software and to support the software the organization needs to have various hardware tools. For
instance, computer desktops are is necessary for editing code along with resources establishment,
and the laptops offer work flexibility. For printing out the hard copy of strategies and instructions
and strategies, suitable printers are required. Communication among the stuff within the
organization is established by using tools like telephones through which data can be shared that
ultimately leads to forming a strong team.
Software tools: Various software tools are needed in the organization for the execution and
completion of the project. Example, data in the organization is managed and organized through
word processing application such as Microsoft Word, and the same form can be used for
preparing project documentation regarding various project activities, policies, and strategies.
Along with that letters and reports are developed that can be later used for communication. MS
Excel can be used for proper data management. For creating the Grant chat regarding the current
project, Microsoft project is needed, through which resources are allotted with their work to be
performed. This application saves both time and cost while monitoring and planning the project.
Code editor such as visual studio is used for development at the front end while database
applications are needed for controlling and managing all the backend services.
13
2.1 Match relevant resources efficiently to the project from the given case study
With the help of the following available resources, the project execution and completion will
require minimum time with cost optimization, and the overall project will be completed with the
estimated constraints:
Human resources: For implementation and successful running of the undertaken project, the
organization exclusively requires team consisting of 6 and eight members respectively for
integrating Chatbot and Social media platform. The primary purpose and aim of these resources
are to maintain and monitor the service quality, strategies preparation, activity execution and
data collection.
Hardware tools: For the execution of the project, the organization needs to develop different
software and to support the software the organization needs to have various hardware tools. For
instance, computer desktops are is necessary for editing code along with resources establishment,
and the laptops offer work flexibility. For printing out the hard copy of strategies and instructions
and strategies, suitable printers are required. Communication among the stuff within the
organization is established by using tools like telephones through which data can be shared that
ultimately leads to forming a strong team.
Software tools: Various software tools are needed in the organization for the execution and
completion of the project. Example, data in the organization is managed and organized through
word processing application such as Microsoft Word, and the same form can be used for
preparing project documentation regarding various project activities, policies, and strategies.
Along with that letters and reports are developed that can be later used for communication. MS
Excel can be used for proper data management. For creating the Grant chat regarding the current
project, Microsoft project is needed, through which resources are allotted with their work to be
performed. This application saves both time and cost while monitoring and planning the project.
Code editor such as visual studio is used for development at the front end while database
applications are needed for controlling and managing all the backend services.
13

Project execution, every available resource is analyzed to understand the capabilities and skills
for assigning a suitable task to attain parallel execution. Teams are created for data sharing and
for carrying out various operations and activities. And every resource present in the organization
is managed effectively by assigning leaders for the project who is also responsible for
communicating the strategies, objectives, and policies to the respective team members.
14
for assigning a suitable task to attain parallel execution. Teams are created for data sharing and
for carrying out various operations and activities. And every resource present in the organization
is managed effectively by assigning leaders for the project who is also responsible for
communicating the strategies, objectives, and policies to the respective team members.
14

2.2 Undertake the proposed project in accordance with the agreed specification
The project can be completed according to the specification in the following manner so that
functionality, as well as profitability, can be achieved:
Resources utilisation: For proper project, execution data are collected from various customers and
current market via proper analysis. From this conclusion can be drawn that the addition of new features
and services can support the present agile team. Work responsibilities of the available resources are
distributed according to their knowledge, skills, and capabilities in the project. This ultimately supports
in executing various activities in parallel. To achieve proper performance and for maintaining the quality
of the services distribution of cost and time is done effectively.
Function within estimated timescale: The estimated timescale of the project is communicated to the
employees. And both time and cost are kept in mind before integrating new features into the
organizational website. The project approaches to execute and complete within the estimated time
enhances overall performance and quality. To meet the pre-determined goals and objective the project
planning includes designing and prototype creation with the available skills and resources.
Techniques for solutions: Work distribution, Gantt chart, and critical path are significant activities
those are used in planning and designing phases. The project also has used prototyping and user
interface in the designing stage to understand the implementation process. User modelling and data
relationship are also used to prepare the backend for the organization. Besides to it, critical path, testing
tools and process monitoring and quality controls are used to meet the desired outcomes.
Development Monitoring: For monitoring the overall project development, the team and tool of project
management are implemented. Using the tools, the organization is supported by assigning the roles and
responsibilities to the team member and consumption related to time and cost can be determined
conclusively.
Project plan adaption and maintenance: For minimizing the chances of delays and reducing issues
related to poor services qualities, the organization needs to make the change in the project plan as per
the current demands and requirement. This help in organizing the overall timeline for executing next
activities and create the balance of performance and quality for achieving the goals and objective on
estimated time.
15
The project can be completed according to the specification in the following manner so that
functionality, as well as profitability, can be achieved:
Resources utilisation: For proper project, execution data are collected from various customers and
current market via proper analysis. From this conclusion can be drawn that the addition of new features
and services can support the present agile team. Work responsibilities of the available resources are
distributed according to their knowledge, skills, and capabilities in the project. This ultimately supports
in executing various activities in parallel. To achieve proper performance and for maintaining the quality
of the services distribution of cost and time is done effectively.
Function within estimated timescale: The estimated timescale of the project is communicated to the
employees. And both time and cost are kept in mind before integrating new features into the
organizational website. The project approaches to execute and complete within the estimated time
enhances overall performance and quality. To meet the pre-determined goals and objective the project
planning includes designing and prototype creation with the available skills and resources.
Techniques for solutions: Work distribution, Gantt chart, and critical path are significant activities
those are used in planning and designing phases. The project also has used prototyping and user
interface in the designing stage to understand the implementation process. User modelling and data
relationship are also used to prepare the backend for the organization. Besides to it, critical path, testing
tools and process monitoring and quality controls are used to meet the desired outcomes.
Development Monitoring: For monitoring the overall project development, the team and tool of project
management are implemented. Using the tools, the organization is supported by assigning the roles and
responsibilities to the team member and consumption related to time and cost can be determined
conclusively.
Project plan adaption and maintenance: For minimizing the chances of delays and reducing issues
related to poor services qualities, the organization needs to make the change in the project plan as per
the current demands and requirement. This help in organizing the overall timeline for executing next
activities and create the balance of performance and quality for achieving the goals and objective on
estimated time.
15
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

2.3 organise, analyse and interpret relevant outcomes
The project outcomes are required according to the defined specification to meet the desired
functionality in the website. The project is accomplished as the set of the activities so that it is essential
to organize the outcomes. The results of the project activities can be summed up to integrate them and
achieve the desired functionality.
Organizing results
To collect and organize the outcomes, the project has used meeting and monitoring techniques in which
the employees of the organizations are communicated to understand the project progress and the
potential outcomes (Boulmetis and Dutwin, 2014). The project has used functional dependencies to
connect the outcomes and understand their usability in the project.
Outcome analysis
To analyse the data related to the outcomes of the project practices, the organization can use the periodic
logbooks those are effective to collect the routine information and manage the performance and quality.
Also, to analyse the outcomes of the project, milestone and quality measures are used. The use of the
periodic logbook has helped to understand the effectiveness of the project.
Interpretation
The project outcomes are analysed with the help of the quality, cost and time factors. It has helped to
understand the potential cost and scope with the project. Interpretation is also used to understand the
project progress (Martinelli and Milosevic, 2016). The organization can use the interpretation through
the help of the graphical diagrams and the tables so that data can be managed and outcome can be
analyzed according to the requirement specification.
For the interpretation in the effective manner, the organization can use the following periodic logbook so
that the quality and performance can be measured. The logbook is completed at the end of the each
activity to understand the need of the resources, time utilization and improvements in the subsequent
activities to meet the business goals.
Table 3: Periodic logbook
16
The project outcomes are required according to the defined specification to meet the desired
functionality in the website. The project is accomplished as the set of the activities so that it is essential
to organize the outcomes. The results of the project activities can be summed up to integrate them and
achieve the desired functionality.
Organizing results
To collect and organize the outcomes, the project has used meeting and monitoring techniques in which
the employees of the organizations are communicated to understand the project progress and the
potential outcomes (Boulmetis and Dutwin, 2014). The project has used functional dependencies to
connect the outcomes and understand their usability in the project.
Outcome analysis
To analyse the data related to the outcomes of the project practices, the organization can use the periodic
logbooks those are effective to collect the routine information and manage the performance and quality.
Also, to analyse the outcomes of the project, milestone and quality measures are used. The use of the
periodic logbook has helped to understand the effectiveness of the project.
Interpretation
The project outcomes are analysed with the help of the quality, cost and time factors. It has helped to
understand the potential cost and scope with the project. Interpretation is also used to understand the
project progress (Martinelli and Milosevic, 2016). The organization can use the interpretation through
the help of the graphical diagrams and the tables so that data can be managed and outcome can be
analyzed according to the requirement specification.
For the interpretation in the effective manner, the organization can use the following periodic logbook so
that the quality and performance can be measured. The logbook is completed at the end of the each
activity to understand the need of the resources, time utilization and improvements in the subsequent
activities to meet the business goals.
Table 3: Periodic logbook
16

Activity Performed Status of outcome
How project has achieved the cost and time factors?
Is desired quality achieved through the project activity?
How technical capabilities have helped to improve the quality?
Is there any issue or barriers which can impact the performance later?
How project has benefited from the skills and capabilities of the
resources?
How the outcomes can contribute in the project outcome quality?
Is project outcome achieved the specification baseline for the functions
and features?
17
How project has achieved the cost and time factors?
Is desired quality achieved through the project activity?
How technical capabilities have helped to improve the quality?
Is there any issue or barriers which can impact the performance later?
How project has benefited from the skills and capabilities of the
resources?
How the outcomes can contribute in the project outcome quality?
Is project outcome achieved the specification baseline for the functions
and features?
17

Task 3
3.1 use appropriate project evaluation techniques
The project evaluation means to analyze the practices and the outcomes so that the cost, time and
other constraints can be used effectively to meet the goals. The project evaluation is significant
to meet the desired functions and features within the constraints. The evaluation also can
determine the potentials barriers and issues in the execution and increase the quality and
performance. The project to integrate the chat-bots and social media can use the following
project evaluation techniques:
Analyze results with specification
The project can use the specification to analyze the results. If the quality of the project outcome
is not adequate according to the requirements, the organization can prefer to rollback the changes
or to update the codes for the required functions. The specification can be used as the baseline
for the project. For example, project time line and Gantt chart can be used to understand the
constraints of the time whereas the modularization through the work breakdown structure can
help to improve the performance (Kerzner and Kerzner, 2017). It is essential to ensure that chat-
bots are capable to answer the common queries and provide effective support to the organization
to save the cost and time.
Project evaluation and review techniques
The technique is also used in the project to analyse the outcomes and the practices. For example,
the evaluation can be done on the project requirements, resources, organizational capabilities and
constraints of the time and cost. The evaluation process also can consider the need of the project
inputs and processes those can be used to meet the goals effectively. Project evaluation can help
to understand the core operations those can support the project outcomes as desired and increase
the performance to meet the constraints (Schwalbe, 2015). The review of the processes and
techniques in the project can move the outcome toward the standard approaches.
Quality measures
18
3.1 use appropriate project evaluation techniques
The project evaluation means to analyze the practices and the outcomes so that the cost, time and
other constraints can be used effectively to meet the goals. The project evaluation is significant
to meet the desired functions and features within the constraints. The evaluation also can
determine the potentials barriers and issues in the execution and increase the quality and
performance. The project to integrate the chat-bots and social media can use the following
project evaluation techniques:
Analyze results with specification
The project can use the specification to analyze the results. If the quality of the project outcome
is not adequate according to the requirements, the organization can prefer to rollback the changes
or to update the codes for the required functions. The specification can be used as the baseline
for the project. For example, project time line and Gantt chart can be used to understand the
constraints of the time whereas the modularization through the work breakdown structure can
help to improve the performance (Kerzner and Kerzner, 2017). It is essential to ensure that chat-
bots are capable to answer the common queries and provide effective support to the organization
to save the cost and time.
Project evaluation and review techniques
The technique is also used in the project to analyse the outcomes and the practices. For example,
the evaluation can be done on the project requirements, resources, organizational capabilities and
constraints of the time and cost. The evaluation process also can consider the need of the project
inputs and processes those can be used to meet the goals effectively. Project evaluation can help
to understand the core operations those can support the project outcomes as desired and increase
the performance to meet the constraints (Schwalbe, 2015). The review of the processes and
techniques in the project can move the outcome toward the standard approaches.
Quality measures
18
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Various quality measures on the design and implementation can improve the project results. The
project can use the prototypes to meet the quality and performance whereas milestone and team
collaboration are other techniques those can help to achieve the desired outcomes. It is required
that the chat-bots are easy to use and fast in the loading to support the real-time communication
whereas the social integration has to provide the easy control on the content and sharing
(Conway et al, 2013). It is essential to map the queries effectively to meet the customer
requirements with the chatting and the social integration.
19
project can use the prototypes to meet the quality and performance whereas milestone and team
collaboration are other techniques those can help to achieve the desired outcomes. It is required
that the chat-bots are easy to use and fast in the loading to support the real-time communication
whereas the social integration has to provide the easy control on the content and sharing
(Conway et al, 2013). It is essential to map the queries effectively to meet the customer
requirements with the chatting and the social integration.
19

3.2 interpret and analyse the results in terms of the original project specification
The results of the project can be analyzed with the help of the swot analysis so that the
organization can meet the desired functionality and features. For example, the project outcome
has strength to attract the customers due to the integration of the chat-bots. It is also beneficial to
serve the customers for the queries. Also, the strengths in the term of customers have supported
the changes in the project to make the service reliable and effective. The project also has
strengths for the cost effectiveness, timely execution and resource utilization (Flyvbjerg and
Budzier, 2013). However, it also has suffered with some weaknesses those can impact the
quality. For example, the project lacks the proper mapping of the risks and barriers for the work
execution. Also, the rapid changes in the availability of the resources and unstructured
monitoring process are some of the weaknesses in the project.
Changes in the technology and web application features are impacting the business and
becoming the threat for the sustainability of the website among the customers. The project also
has threats of the increasing cost and integration of the customer requirements in the website.
However, it also has opportunities to provide the more reliable access and data sharing to the
customers and save the cost on the operations related to the customer services.
Besides to it, project has achieved the defined goals and objectives in the effective manner. The
time and cost factors are utilized with proper mapping to the resources to improve the
performance. The work units of the projects are dynamic in the nature and changed for the
requirements so that delays can be compensated and project can be completed within time. Also,
the roles and responsibilities of resources are changed to improve the monitoring and reporting
(Saunders and Lewis, 2012). The values of the project have changed over the time with the
outcomes. Lower qualities and risk of the failure has changed the project planning and
constraints but the effective arrangement of the activities with time and distribution of the work
has helped to achieve the outcomes.
As the completed project, the outcomes are chat-bots and the social media integration. Chat-bots
are used to communicate with the organization where the application can serve the customer’s
general queries. It also has helped to engage the customers more than 70% in comparison of the
traditional communication approaches (Kerzner and Kerzner, 2017). Besides to it, the project has
20
The results of the project can be analyzed with the help of the swot analysis so that the
organization can meet the desired functionality and features. For example, the project outcome
has strength to attract the customers due to the integration of the chat-bots. It is also beneficial to
serve the customers for the queries. Also, the strengths in the term of customers have supported
the changes in the project to make the service reliable and effective. The project also has
strengths for the cost effectiveness, timely execution and resource utilization (Flyvbjerg and
Budzier, 2013). However, it also has suffered with some weaknesses those can impact the
quality. For example, the project lacks the proper mapping of the risks and barriers for the work
execution. Also, the rapid changes in the availability of the resources and unstructured
monitoring process are some of the weaknesses in the project.
Changes in the technology and web application features are impacting the business and
becoming the threat for the sustainability of the website among the customers. The project also
has threats of the increasing cost and integration of the customer requirements in the website.
However, it also has opportunities to provide the more reliable access and data sharing to the
customers and save the cost on the operations related to the customer services.
Besides to it, project has achieved the defined goals and objectives in the effective manner. The
time and cost factors are utilized with proper mapping to the resources to improve the
performance. The work units of the projects are dynamic in the nature and changed for the
requirements so that delays can be compensated and project can be completed within time. Also,
the roles and responsibilities of resources are changed to improve the monitoring and reporting
(Saunders and Lewis, 2012). The values of the project have changed over the time with the
outcomes. Lower qualities and risk of the failure has changed the project planning and
constraints but the effective arrangement of the activities with time and distribution of the work
has helped to achieve the outcomes.
As the completed project, the outcomes are chat-bots and the social media integration. Chat-bots
are used to communicate with the organization where the application can serve the customer’s
general queries. It also has helped to engage the customers more than 70% in comparison of the
traditional communication approaches (Kerzner and Kerzner, 2017). Besides to it, the project has
20

integrated social media which has enabled the users to share the music and album arts. It also has
helped to drive the traffic which is increased percentage of 40%. The business has benefits of the
results to make the user operations easy and effective for the need of the query processing and
data sharing.
21
helped to drive the traffic which is increased percentage of 40%. The business has benefits of the
results to make the user operations easy and effective for the need of the query processing and
data sharing.
21
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

3.3 make recommendations and justify areas for further consideration
However, the project outcomes are according to the demand and have fulfilled the specification
but still there are several areas in which the organization can focus to make the project more
effective and productive. The organization can consider the project outcomes to make the
following changes wherever the newer version is applied:
Project Importance: The project has meet the goal of social integration and the chat-bots but it
has several other techniques those are still required to integrate. For example, the significance of
the project can be improved for the organization and customer through the online customer care
services and multi-site so that the customers can manage their visit more effectively (Harrison
and Lock, 2017). Also, the streaming features can be added to improve the returns to the
customers and manage the access more effectively.
Application of project results: Currently, the project has core features to apply on the main site
so that the customers can make use of the chat-bots to communicate with agents or artists
whereas online sharing is enabled to make the content widely sharable. The organization can
improve the application as the login process can be used to manage the data sharing and lead the
links.
Limitations and implications: The project has limitation of the features and technology to
achieve the higher performance in the loading and sharing. At other side, the implications are
also impacted with the changes in the technology or programming algorithms (Schwalbe, 2015).
The organization can consider the stable version of the software and other tools to make the
website more reliable and stable.
Recommendations for further consideration
From the project outcomes, it is recommended to integrate the login process and sharing options
so that the sharing of the content can be enforced. For example, the social sharing is bounded by
the logins so that unauthorized users cannot view the content or they have to register with the
system. It can help to create the customer chain and improve the branding. At other side,
effective design and real time response of the chat-bots can reduce the cost on the agents for the
22
However, the project outcomes are according to the demand and have fulfilled the specification
but still there are several areas in which the organization can focus to make the project more
effective and productive. The organization can consider the project outcomes to make the
following changes wherever the newer version is applied:
Project Importance: The project has meet the goal of social integration and the chat-bots but it
has several other techniques those are still required to integrate. For example, the significance of
the project can be improved for the organization and customer through the online customer care
services and multi-site so that the customers can manage their visit more effectively (Harrison
and Lock, 2017). Also, the streaming features can be added to improve the returns to the
customers and manage the access more effectively.
Application of project results: Currently, the project has core features to apply on the main site
so that the customers can make use of the chat-bots to communicate with agents or artists
whereas online sharing is enabled to make the content widely sharable. The organization can
improve the application as the login process can be used to manage the data sharing and lead the
links.
Limitations and implications: The project has limitation of the features and technology to
achieve the higher performance in the loading and sharing. At other side, the implications are
also impacted with the changes in the technology or programming algorithms (Schwalbe, 2015).
The organization can consider the stable version of the software and other tools to make the
website more reliable and stable.
Recommendations for further consideration
From the project outcomes, it is recommended to integrate the login process and sharing options
so that the sharing of the content can be enforced. For example, the social sharing is bounded by
the logins so that unauthorized users cannot view the content or they have to register with the
system. It can help to create the customer chain and improve the branding. At other side,
effective design and real time response of the chat-bots can reduce the cost on the agents for the
22

customer services. It is recommended to plan and map the resources and capabilities before to
start the project so that failures can be avoided.
23
start the project so that failures can be avoided.
23

Task 4
4.1 produce a record of all project procedures used
The project has used several procedures to meet the desired outcomes. The procedures are the
activities, techniques and methods used to simplify the operations and improve the outcomes.
The project has mainly integrated the following procedures in the various stages of the project:
Business analysis is executed during the planning phase of the project so that business and its
capabilities can be used to map the potentials of the project. Also, the basis needs to execute the
project are determined. For example, scope and benefits are determined with the cost-benefit
analysis. The initialization process of the project has provided the basic data for the project
benefits to the organization so that organization can process with planning and funding.
The cost and time are core factors in the project. The project has used specification, budget
planning and Gantt chart so that cost and time can be managed in planning phase. The project
also has used critical path analysis, resource allocation and role distribution to manage the
project effectively. It has provided quality assurance to ensure quality in the planning (Burke,
2013).
The core requirements of the organization and customers are essential to gather so that interview
and questionnaire process is used in the organization. During the data collection and analysis, the
project has used project management tools so that data can be analyzed in the accurate and
reliable manner. Specification is prepared and signed to understand the functions in the project.
The design of the project has used the resources according to their roles and responsibilities. The
project has designed the user interface and prototype to communicate the new website to the
major stakeholders. The design phase also used framework, cost analysis, agile design model and
user modeling to improve the integration of the resources.
The implementation and monitoring phases are completed with the procedure of the activity
execution, quality monitoring, reporting and communication (Bentley, 2012). The procedure and
policies for the work management and role execution have helped to improve the outcomes.
24
4.1 produce a record of all project procedures used
The project has used several procedures to meet the desired outcomes. The procedures are the
activities, techniques and methods used to simplify the operations and improve the outcomes.
The project has mainly integrated the following procedures in the various stages of the project:
Business analysis is executed during the planning phase of the project so that business and its
capabilities can be used to map the potentials of the project. Also, the basis needs to execute the
project are determined. For example, scope and benefits are determined with the cost-benefit
analysis. The initialization process of the project has provided the basic data for the project
benefits to the organization so that organization can process with planning and funding.
The cost and time are core factors in the project. The project has used specification, budget
planning and Gantt chart so that cost and time can be managed in planning phase. The project
also has used critical path analysis, resource allocation and role distribution to manage the
project effectively. It has provided quality assurance to ensure quality in the planning (Burke,
2013).
The core requirements of the organization and customers are essential to gather so that interview
and questionnaire process is used in the organization. During the data collection and analysis, the
project has used project management tools so that data can be analyzed in the accurate and
reliable manner. Specification is prepared and signed to understand the functions in the project.
The design of the project has used the resources according to their roles and responsibilities. The
project has designed the user interface and prototype to communicate the new website to the
major stakeholders. The design phase also used framework, cost analysis, agile design model and
user modeling to improve the integration of the resources.
The implementation and monitoring phases are completed with the procedure of the activity
execution, quality monitoring, reporting and communication (Bentley, 2012). The procedure and
policies for the work management and role execution have helped to improve the outcomes.
24
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Project logbooks and periodic monitoring are used to ensure that activities are going as per the
specification to meet the desired outcomes.
25
specification to meet the desired outcomes.
25

4.2 use an agreed format and appropriate media to present the outcomes of the project to an
audience
Owners of the website are the major audience for the project so that outcomes can be
communicated. The project outcomes can be presented in the summarized reports to the audience
so that understand the basic changes in the project and scope with the outcome to conquer the
market benefits. Here is the report to the management team of the organization so that major
outcomes can be communicated:
Description
The project is initiated with the goal and objectives to integrate the functionality of the chat-bots
and online sharing on social media from within the existing web platform. The project was
expected to create the functionality and then integrate within the website to reduce the higher
need of the changes and improve the service continuance. The project was planned to deliver
high performance, security and reliability in the chat-bots operations whereas the social
integration is required to be secure and manageable to achieve the goals.
Outcomes of the project
The project has integrated the social sharing function on the most of the pages. The users
can share audio or video content of the artist from within the application. It can save the
time and lead higher registrations and subscriptions to the website.
The social sharing only available to the users those are premium content subscriber and
engaged in the community. It helps to prevent the sharing and access to the premium
artist work. However, the user also has to provide the authentication details to the website
or authorize the account on official pages.
The integration of the chat-bots are planned to improve the service the customer care services
and reduce the time for the services. The organization can use the chat-bots to automate the
customer queries and reduce the need of the resources for the customer services
26
audience
Owners of the website are the major audience for the project so that outcomes can be
communicated. The project outcomes can be presented in the summarized reports to the audience
so that understand the basic changes in the project and scope with the outcome to conquer the
market benefits. Here is the report to the management team of the organization so that major
outcomes can be communicated:
Description
The project is initiated with the goal and objectives to integrate the functionality of the chat-bots
and online sharing on social media from within the existing web platform. The project was
expected to create the functionality and then integrate within the website to reduce the higher
need of the changes and improve the service continuance. The project was planned to deliver
high performance, security and reliability in the chat-bots operations whereas the social
integration is required to be secure and manageable to achieve the goals.
Outcomes of the project
The project has integrated the social sharing function on the most of the pages. The users
can share audio or video content of the artist from within the application. It can save the
time and lead higher registrations and subscriptions to the website.
The social sharing only available to the users those are premium content subscriber and
engaged in the community. It helps to prevent the sharing and access to the premium
artist work. However, the user also has to provide the authentication details to the website
or authorize the account on official pages.
The integration of the chat-bots are planned to improve the service the customer care services
and reduce the time for the services. The organization can use the chat-bots to automate the
customer queries and reduce the need of the resources for the customer services
26

Conclusion
The above report has illustrated about the undertaken project aims, objectives, including
processes along with constraints and various techniques and tools that are applied in the overall
project execution and completion so that beneficial outcome is achieved. The report has also
discussed the work breakdown structure that has been implemented in the organization for
distributing the function among the available resources according to their skills and knowledge.
Techniques such as CPT, logbook, and PERT has also be applied for supporting the process of
project execution. The report has discussed the effectiveness of the undertaken project and
method of managing it so that appropriated outcome is achieved without quality compromise.
The report shows the integration of required features through which services that can offer
customer satisfaction and high quality can be achieved.
27
The above report has illustrated about the undertaken project aims, objectives, including
processes along with constraints and various techniques and tools that are applied in the overall
project execution and completion so that beneficial outcome is achieved. The report has also
discussed the work breakdown structure that has been implemented in the organization for
distributing the function among the available resources according to their skills and knowledge.
Techniques such as CPT, logbook, and PERT has also be applied for supporting the process of
project execution. The report has discussed the effectiveness of the undertaken project and
method of managing it so that appropriated outcome is achieved without quality compromise.
The report shows the integration of required features through which services that can offer
customer satisfaction and high quality can be achieved.
27
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

References
Books and journals
Bentley, C., 2012. Prince2: a practical handbook. Routledge.
Bonham, S.S., 2005. IT project portfolio management. ^ eMassachusetts Massachusetts:
Artech House.
Boulmetis, J. and Dutwin, P., 2014. The ABCs of evaluation: Timeless techniques for
program and project managers (Vol. 56). John Wiley & Sons.
Burke, R., 2013. Project management: planning and control techniques. New Jersey,
USA.
Conway, P.H., Mostashari, F. and Clancy, C., 2013. The future of quality measurement
for improvement and accountability. Jama, 309(21), pp.2215-2216.
Flyvbjerg, B. and Budzier, A., 2013. Why your IT project might be riskier than you
think. arXiv preprint arXiv:1304.0265.
Fuchs, C., 2017. Social media: A critical introduction. Sage.
Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach.
Routledge.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to
planning, scheduling, and controlling. John Wiley & Sons.
Marchewka, J.T., 2014. Information technology project management. John Wiley &
Sons.
Martinelli, R.J. and Milosevic, D.Z., 2016. Project management toolbox: tools and
techniques for the practicing project manager. John Wiley & Sons.
Meredith, J.R., Mantel, S.J., Shafer, S.M. and Sutton, M.M., 2014. Project management
in practice. Wiley.
Saunders, M.N. and Lewis, P., 2012. Doing research in business & management: An
essential guide to planning your project. Pearson.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Tebbe, M., SAP SE, 2015. Social media integration platform. U.S. Patent Application
14/010,733.
28
Books and journals
Bentley, C., 2012. Prince2: a practical handbook. Routledge.
Bonham, S.S., 2005. IT project portfolio management. ^ eMassachusetts Massachusetts:
Artech House.
Boulmetis, J. and Dutwin, P., 2014. The ABCs of evaluation: Timeless techniques for
program and project managers (Vol. 56). John Wiley & Sons.
Burke, R., 2013. Project management: planning and control techniques. New Jersey,
USA.
Conway, P.H., Mostashari, F. and Clancy, C., 2013. The future of quality measurement
for improvement and accountability. Jama, 309(21), pp.2215-2216.
Flyvbjerg, B. and Budzier, A., 2013. Why your IT project might be riskier than you
think. arXiv preprint arXiv:1304.0265.
Fuchs, C., 2017. Social media: A critical introduction. Sage.
Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach.
Routledge.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to
planning, scheduling, and controlling. John Wiley & Sons.
Marchewka, J.T., 2014. Information technology project management. John Wiley &
Sons.
Martinelli, R.J. and Milosevic, D.Z., 2016. Project management toolbox: tools and
techniques for the practicing project manager. John Wiley & Sons.
Meredith, J.R., Mantel, S.J., Shafer, S.M. and Sutton, M.M., 2014. Project management
in practice. Wiley.
Saunders, M.N. and Lewis, P., 2012. Doing research in business & management: An
essential guide to planning your project. Pearson.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Tebbe, M., SAP SE, 2015. Social media integration platform. U.S. Patent Application
14/010,733.
28

Turner, R., 2016. Gower handbook of project management. Routledge.
Yan, M., Castro, P., Cheng, P. and Ishakian, V., 2016, December. Building a chatbot with
serverless computing. In Proceedings of the 1st International Workshop on Mashups of
Things and APIs (p. 5). ACM.
Online references
Bandcamp, 2018 [Accessed through][Online] <https://bandcamp.com/>[Accessed On:
31st July, 2018]
29
Yan, M., Castro, P., Cheng, P. and Ishakian, V., 2016, December. Building a chatbot with
serverless computing. In Proceedings of the 1st International Workshop on Mashups of
Things and APIs (p. 5). ACM.
Online references
Bandcamp, 2018 [Accessed through][Online] <https://bandcamp.com/>[Accessed On:
31st July, 2018]
29
1 out of 33
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.