The assignment discusses the importance of project implementation and covers activities such as formulating a project, specifying its requirements, breaking it down into manageable tasks, and utilizing appropriate media to present outcomes. It also mentions the use of tools like PERT analysis for effective task completion.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
PROJECT DESIGN IMPLEMENTATION AND EVALUATION [MANDATORY UNIT]
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
INTRODUCTION Project implementation can be derived as a phase in which vision and plan can become a reality. With the help of it, logical conclusions can be achieved after evaluating, designing, visioning, planning and applying all activities. In order to make it effective, this assignment will consider the activities of Brandscamp.com, as it is a musical enterprise and has been founded in the year 2008. It is a firm which works as global community and their fans discover music and directly supports the artist who makes it. In this report, the following things will be covered such as formulation of project, specification, breakdown structure etc. In addition to this, the main aim is to draw technical implementation so that project can be executed effectively. TASK 1 1.1 Formulation and record at least two possible outline project specification or Brandcamp.com for project specification document. Company overview The Brandcamp.com is an online firm and it has founded in the year 2008. It is the firm which works as global community and their fans discovers music and directly supports the artist who make it. It provides revolutionary service and it also works as to break down barriers for the self-released music. This firm takes innovative approaches so that their brand name can sustain in market for long period. Bandcamp is the website which works as to offers to an artist page and it works as to featuring information about the artist, social media links and listing artists page featuring information (Paulheim, 2017). In addition to this, it can be said that Brandcamp.com works as an agile company. This firm is currently looking to develop the new platform which help to increase profits of an enterprise. In order to take the innovation process effectively firm is looking over providing the services as extensive social media integration and improved internal communication for registered users. Extensive social media integration- In this, social media platforms such as Facebook, Twitter. Linkedin and YouTube are one of the great sources of communication. It allows the customers to give their feedback instantly. There are thousands of organisations which are using social media platform to attract visitors. In addition to this, to stay ahead in the competition marketers analysing number of transmission so that firm can easily target the customers (Lee and et.al., 2018). The effective social media 1
integration works as to develop brand and connects with user directly. Under this, social media consolidation will be helpful in gaining deeper understanding of the visitors. It is effective formula to refine marketing strategy. Improved internal communication for registered user-In this, it is essential to develop communication process so that all activities can be carried out effectively. The communication is the system which is helpful to manage overall information and this will be facilitating growth to an enterprise. Under this, it can be said that team work will be messy and disorganised activity without centralised space to manage all individual components of the projects. It is one of effective medium and it is helpful in making clear communication, collaboration, sharing and works as to coordinate all activities which will be helpful in managing day to day activities. By making good internal communication, the registered user can have effective accessibility, connectivity and communication for all team members (Song and et.al., 2017). With help of it face to face meeting also plays crucial role in terms to build effective team building. In addition to this, it can be said that digital technology plays greater and effective role in terms to create collaborative and communicative work environment. 1.2 Identify the factors which helps to contribute to the process of project selection. The present report is based on business activities of Brandcamp.com, it is enterprise which work as to takes the initiatives steps in order to take innovation so that a good and effective music can be composed (Bastos and et.al., 2017). Business function of Brandscamp.com- To make the business function appropriately the Brandcamp.com is selecting social media interaction technique so that long term innovation can be developed.In the current scenario, the firm is working as to develop the new platform so that there can be increment in profitability. With help of technical features, the more number of potential customer can be targeted This is one of effective ways in order to organise the business activities in systematic approach. In order to run the all function effective, the firm need to carry forward their business activities appropriately. The another business function is that it taking initiatives to provide customer assistance with help of building social media integration with online platform. It can aids to sort out the issues of customer in ease manner. Technical advancement- 2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
The technical advancement brings the crucial advantage to firm. This kind of process will be helpful in order to integrate business activities in most appropriate and effective manner. Proper integration- To make this integration proper the firm will work as to have the use of social media features as are blogs, forums, wikis, news and announcements etc. It is one of effective social media strategy which perform its function as to engaging the customers can perform its business function (Yeh and Swinehart, 2018). The social media integration will work as to facilitating the core function so that each function can be processed effectively. 1.3 Produce full project specification with activities and time line management The needs and requirements of the project are needed to understand so that all operational procedures can be carried out effectively. It is one of effective approaches which works as to facilitate operational functions of an enterprise in effectual mode (Alencar, 2018). Here, the following project specifications will be discussed in below context - Scale of operation-This is a term which carries out all operational activities so that firm can perform its activities appropriately. In this term, operating business at scale means allocating and optimising the overall resources so that there can be achievement of greatest results and volumes across the market segments. The Brandcamp.com is taking various initiatives in order to determine the uses of operational activities so that it can be carried out effectively. Times-frames-Underthis,eachactivityneedstoprovideaparticulardeadlinesothat operational functions of an enterprise can be carried out impressively. By providing effective deadlines to the all functions, the operational functions can be done in timely manner. The positive working and accomplishing of tasks will be essential function in order to set each activity appropriately (Letonsaari and Selin, 2018). In this, it can be said that timeline will be helpful in order to give a visual target in order to achieve each activity in the most appropriate and timely manner. Resources-It is also one of crucial steps as it is inclusive of material, labour, resources and all other equipment. This works as to perform each function appropriately so that firm can have the resources and it will be core parts in order to achieve its desired objectives. In order to launch social media integration technique, the firm can able to run business activities in the most appropriate mode. In this, adequate amount, labour, capital will play essential role so that social media integration can be done effectively (Colquhoun and et.al., 2017). In orderto accomplish 3
the desired results, the firm can able to make better evaluation. To have desired results, it is essential to have proper outcomes. Business data-This document will be inclusive of the information about people, place, things, rules and event which works in operating business appropriately. With help of all kinds of relevant data, the firm is able to take better decisions so that plan can be framed effectively. In this, the relevant information about time should be considered so that all things can be planned systematically (Wang Qiao and Qie, 2017). Standards-The firm should maintain the quality standards and it needs to be performed through the project life cycle. Under this, it can be said that quality assurance activities needed to be monitored, and managed and also by creating deliverables efficiently so that each function can process its activities in an effective mode (Lee and et.al., 2018). In this, it can be said that quality plan is one of the documents which together specifies process and each work is well performed efficiently and in documented manner. 1.4 Produce an appropriate project plan for agreed project with use of suitable work breakdown structure and Gantt chart. Task ModeTask NameDurationStartFinishPredecessors Auto Schedule d To develop new platform features for increasing its profit. 36 daysThu 4/26/18Thu 6/14/18 Auto Schedule d Initial phase (online sound and video streamingformusic shows) 8 daysMon 4/30/18Wed 5/9/18 Auto Schedule d Settinggoalsand objectives2 daysWed 5/2/18Thu 5/3/18 Auto Schedule d Risk Associated3 daysMon 5/7/18Wed 5/9/183 4
Auto Schedule d Properadequateamount of4 daysWed 5/9/18Mon 5/14/183 Auto Schedule d communication plan2 daysMon 5/14/18Tue 5/15/183,4 Auto Schedule d Developmentphase (Onlinechatcustomer service) 10 daysFri 5/18/18Thu 5/31/18 Auto Schedule d Operation plan4 daysMon 5/21/18Thu 5/24/183,4 Auto Schedule d Identification of laws3 daysTue 5/15/18Thu 5/17/185 Auto Schedule d Plan to mitigate risk5 daysWed 5/16/18Tue 5/22/185,6 Auto Schedule d Preparation of structure3 daysFri 5/25/18Tue 5/29/188 Auto Schedule d Properlyimplementing the procedure (Extensive social media integration) 6 daysTue 5/29/18Tue 6/5/18 Auto Schedule d Requirement of capitals4 daysMon 6/4/18Thu 6/7/188 Auto Schedule d Technical expert person5 daysMon 6/11/18Fri 6/15/189 5
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Auto Schedule d Services of social media2 daysMon 6/11/18Tue 6/12/1810,11 Auto Schedule d Monitoringand controlling process (smart track search) 12 daysMon 6/25/18Tue 7/10/18 Auto Schedule d Monitoring process2 daysMon 7/2/18Tue 7/3/1810,11,13 Auto Schedule d Regular reporting3 daysTue 7/3/18Thu 7/5/1814 Auto Schedule d Conferences2 daysMon 7/9/18Tue 7/10/1814,15 Auto Schedule d Identification of risk1 dayTue 7/10/18Tue 7/10/1817,18 Auto Schedule d Investigating process1 dayFri 7/13/18Fri 7/13/1818,19 Auto Schedule d Modified strategy2 daysMon 7/16/18Tue 7/17/1820 Auto Schedule d Finishofassignment (Improveinternal communicationfor registered users) 2 daysFri 7/27/18Mon 7/30/1825 Auto Schedule Assignment closure2 daysMon 7/23/18Tue 7/24/1820,21 6
d Auto Schedule d signwithalllawsand documents1 dayThu 7/26/18Thu 7/26/1822,24 7
8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
TASK 2 2.1 Matching of relevant resources efficiently to project from given case study. In order to accomplish objectives all resources and project outlets in relation to the firm need to be performed in effectively manner. All relevant resources are taken so that appropriate actions are needed to be carried. To carry out activities, the firm will be focussing over things are resources, business data, scale of operation and other things. The scope of the study is defined so that the main aim of developing the project can be known. With help of maintaining the standards, quality results can be achieved and all things can be done appropriately.To carry out the all activities effectively, it is crucial to have proper use of resources, working with agreed time scale, use of technique that can aids to generate solutions and to undertake monitoring development against the agreed project plan. In this, it can be said that it is the most systematic and formal approach, which works to practice performance and efforts so that there can be improvement in the performance. With help of having appropriate data, the functions can be achieved. The effective data information will be helpful in order to plan out the activities and with help of it, the firm is able to carry out its business functions in the most appropriate manner (Lee and et.al., 2018). 9
It is essential to have all information and data about the enterprise so that one operational plan can be framed. In this way, planning and goal setting will be appropriate if all the resources has been selected wisely. In order to process each thing in effective manner, it is essential to match things with active resources. Thus, it is helpful in determining overall growth of an enterprise. Under this, each activity will be planned and process can be done to attain the specific details of the proposed plan. Here, components or elements must be done in such a manner which is helpful to accomplish deadline successfully and with ease without compromising on the quality. 2.2 Undertaking of proposed project in accordance with agreed specification. In this, project specification is the kind of comprehensive description document and it useful in terms to development of project. It contains all things as are goals, functions and details required for development of team so that vision of client can be full filled. It is need to be dine in order to get the depth description. In this, researcher gets the belief with help of which facts regarding study can be achieved (Letonsaari and Selin, 2018). With help of it, depth information can be identified. It defined as what is known to be true and what is believed to be true.The main aim of quoted enterprise is to look over the online platform for customer to provide ease in services. In order to implement the services for a social media integration, the firm will lay out all things appropriately that can assist to customer within time-frame.It is useful in order to encompassing the various tools to determine the specific research approach. It may be of many types as are Positivism, realism, interpretivism, ontology and Axiology etc. It is a plan and procedure which will be inclusive of assumption which must have detailed method of data collection, analysis and interpretation. It can be divided into two methods as are inductive and deductive. Under this, deductive approach works as to task the validity of assumption and inductive technique will be use to contributes to the emergence of new theories and generalisation. Proposed project with agreed specification While implementing project management, various resources are required to be carried out for completion of tasks. Under this, resources may be of many kinds as equipment, facilities, funding or else which is assistive in accomplishing the project (Wang Qiao and Qie, 2017). 10
In this, human resources are the most essential part that will provide assistance to get thingsdone.Sometimes,itbecomestypicaltomanagetheirtimeandworkload.For accomplishing these specifications, effective resource planning is needed to get done. There are many problems which can be small and quickly but it must be sorted so that it requires significant time and efforts to solve. It is a process which helps to establish the system and decision making process. It is effective in order to manage scope, cost and make a perfect scheduling of task (Masoodi and Qasim, 2017). It is also a systematic method where things can be done in proper, manageable, documented methodology to make appropriate communication with stakeholders. The most crucial thing under this is the amount of the time under which the completion of the project can be earlier decided rather than planning. This will be specific in terms to obtain the results specifically. The main aim under this is to accept the performance of project so that proper outcomes can be achieved. Under this, resources are needed to be monitored and specific outcomes can be achieved so that the main object in terms to project can be fulfilled. In addition to this, there is a need for identification in actual and planned activities. If there are any deviations between both then corrective actions are needed to be taken. In order to deal with project in agreed research specification, it is essential to setting down regular period of time to check and develop the project in time manner. To make it more effective, it is essential to make proper communication with the project manager. In these terms, it can be said that uncertainty is one of the inherent parts of all the projects (Wang Qiao and Qie, 2017). With help of it, overall team activities can be managed effectively. In this, one of the good reasons that must be taken to provide flexibility to become an adaptable project manager. On the other hand, it is essential to accomplish the result as per given deadline. It defies the length of time during which project can be accomplished. It is systematic strategy and it defines the overall action with help of which things can be done systematic. With help of it, task can be prioritised and effective judgement can be passed. With help of setting the clear time scale the enterprise is able to produce the result in timely manner. The 11
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
techniques are need to be handled as are defining the problem, causes, generating the ideas, selection of best possible solution and take appropriate action towards it. 2.3 Organise, Analyse and interpretation of possible relevant outcomes with help of suitable recording mechanism. The logbook takes steps, which is needed to be completed by the researcher at the time of completion of each step towards project evaluation. In this, periodic logbook is the document which covers the all-time line and all things are needed to be accomplished within time. It is assistive in terms to keep ideas together in one place and effective tools in recording the progress of project evaluation and implementation. It is an effective way in terms to accomplish better results so that overall consequences can be achieved. This is one of the actual ways to record each small information so that all data can be recorded and better results can be achieved (Bastos and et.al., 2017).Here, each information is needed to be recorded so that things can be kept in secured manner. Thus, it can be said that logbook is one type of proof which will be inclusive of certain activities and has occurred at specific times. It is a log frame and the way of structuring the main elements in project. This will be discussed in below context- DateExperiencePeriod claimedcompetencySupervisors 27thAugust 2018 to14October 2018 Finding new talentsso that value- added music can be composed. Developm entin teamand overall 2 monthsBetterand proficient Music editor team. Tohave competent staff so that activities canbe conducted effectively. Undergro und music composer Editor 12
process for having better output. 1stNovember 2018to31st December Settlementof musicpanelfor productionand recoveringthe equipment so that better outputs can be achieved. 2 monthsBetterand effective production scheduling. Sequencing Operative panel layout. Underground musiccomposer andeditorsof music. 15thJanuary 2018to15th February 2018 Initiative steps to workupon inspectionand thisiseffective waytoprocess eachthing effectively. 1 MonthBy inspecting officer Escape ways Deputy, Underground manager. 20thFebruary 2019 to 7thApril 2019 Inthis,overall monitoringand evaluating activitiesis neededtocarry out so that better resultscanbe achieved. 1.5 monthsMusic manageme nt Sampling etc. Musicmanager etc. 10thApril 2019 to 15thmay 2019 It is involved in risk assessment. 1 monthWithhelpof installationand Underground musicmanager, 13
removalofheavy music equipment. Music editor etc. 20thMay 2019 to 1stJuly 2019 Inthis,risk assessment process is need to be carried so that therecanbe better elimination ofactivitiesso betteroutcomes can be achieved. 1.5 MonthsBrandscamp.com isoneofmusic industrywhich helpstocompose music and its fans discoversthe music and work as to directly supports the artist. In this, the care and effective risk measurewillbe takenbythe underground musicmanager and music editor etc. 10thJuly 2019 to 14thAugust 2019 Accompanied with music officer onmonthly surveysothat activitiescanbe monitored successfully. 1.5 MonthsTheeffective production scheduling. Inspecting office willtakethe initiativesto promotethose activitieswhich can be promoted regularly. 20thAugust 2019 to 20thNovember 2019 Thecontinuous improvementin the taken software asPERTwill carryforwardso that things can be achieved effectively. 3 MonthsItcanbedone effectivelyby implementing suitable training. Emergency coordinatorand supervisor etc. 14
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
TASK 3 3.1 Appropriate project evaluation technique such as PERT or CPM to evaluate project. In this, project evaluation must be done in order to get proper results. With help of superior evaluation, specified objectives can be achieved effectually. It is a method which is used to examine tasks in proper manner and determining variations of critical path method. It is one of the effective ways which is helpful in order to analyse the tasks which have been associated with all over dependencies to have an idea about the minimum period of time during by which tasks can be accomplished (Colquhoun and et.al., 2017). There is an estimation for the shortest possible time for each activity so that better outcomes can be achieved. There are two ways in order to conduct the project evaluation process like PERT and CPM. Thus, there are following three ways such as optimistic, pessimistic and mostly likely. These activities will be undertaken with help of making restored evaluation on the things and it desired outcomes. With help of it, there can be time estimation on how much it will accomplish desired tasks in time effective manner. In this way, formula has been given below which helps to determine this outcome - Formula: (P+4M+O)/6 Optimistic time- In this, Minimum possible time will be required to accomplish the particular task, better assuming of everything proceeds everything in normal expected manner. Pessimistic time-In it maximum possible time will be taken because it is helpful in order to accomplish the task effectively. Under this, assuming everting goes wrong. Mostly likely time-it is step in which best estimates of the time will require to have to accomplish the task. In this each and everything proceeds normal. TASKOptimisticMost likelyPessimistic Task A30 days45 days60 Days Task B35 days40 days60 days Task C14 days20 days30 days Task D30 days35 days45 days Task E15 days20 days30 days 15
Task F15 days28 days45 days Task G20 days35 days45 days Task H45 days60 days90 days COMPLETION204 days283 days405 days 1.60+4*45+30/6= 45 days 2.60+4*40+35/6= 42.5 days 3.30+4*20+ 14/6= 20.7 days 4.45+4*30+35/6= 33.4 days 5.30+4*20+15/6= 290.84 days 6.45+4*28+15/6= 28.7 days 7.45+4*35+20/6= 34.5 days 8.90+4*60+45/6= 62.5 days In this, it can be said that it is the most possible ways in determining the overall days, during which, this project should be accomplished. It assists in defining things in effectual manner. It is assistive in order to determine the stage of project in appropriate manner. 3.2 Interpretation and analysis the result in terms to original project specification. The present project specification is based on implementation of social media integration so that activities of Brandcamp.com can be done in effectively. In order to have proper execution, it is crucial to put maximum considerations over starting phase. Under this, it is essential to properly execute the overall activities and setting up of aim and objectives. With the help of it, there is a need to set communication plan so that information can be passed. At this level, development process must be considered. Operational activities Afterthecompletionofinitialphase,thereisaneedtoputconsiderationover developmental level with help of this risk and has been justified to mitigate it. In addition to this, operational activities and identification of laws are determined so that things can be known in better and efficient manner (Letonsaari and Selin, 2018). With help of making proper operational activities, the researcher can make a correct and appropriate structure for constructive results and enhancement of proficiency in the entire project planning. Implementation process of planning 16
After the developmental phase, the consideration is needed to give in which there is a necessity to conduct suitable implementation of the procedure. Thus, overall activities which has been planned will be discussed and this entire process of planning will be done in order to achieve the outcomes. Here, effective and efficient outcomes will be assistive in terms to accomplish the results. Monitoring the activities After that stage, it is essential to have suitable monitoring and evaluation so that there is no gap between planned and actual activity then it is required for assessing. Under this, essential steps are given to full-fill suchdeviation (Bastos and et.al., 2017).It is one of the crucial terms as it is accommodating to determine the overall results. In addition to this, better evaluation will be obliged in order to accomplish the desired results. In this stage, it can be said that before the completion of project evaluation, it is essential to determine the overall plans to be achieved effectively and efficiently. 3.3 Recommendations and justify the areas for further considerations and its improvement for developed project. On the basis of above, following recommendation is need to be given so that things can be addressed effectively. 1.Development process should be acquiring so that there can be better things can be taken for starting up the assignment to achieve the set results. 2.With the help of assessable evaluation techniques, there can be proper measurements that can be undertaken and must be properly implemented and evaluated so that better results can be achieved. 3.The researcher should undertake the activities like regular monitoring, investigation step etc. so that the overall strategies will be defined and need to be justified so that improved outcomes can be accomplished. 4.Thus, social media integration is needed to be done so that Brandcamp.com can get success and fans can discover the music and directly support the artists who will make and compose it. 5.To undertake the project activities effectively, there is need to have clear goal and effective communication between the members of the projects. It can lead to accomplish the all desired targets. 17
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
6.Project manager should look over the process of developing project team and internal and external interactions of team members and their competences skills. It can aids to enhance the project performance. TASK 4 4.1 Produce and record of all stages of project procedure and project development. In this, there are five process of project management which has been defined as Initiation, planning, execution, performance and closure of project. It has been discussed in below context as are- In the first level, there is a need to define overall project life cycle, it is helpful in order to determine the value of this project and its feasibility. The project planning gives the direction for producing quality outputs, risk handling and creating the acceptance so that overall results can be achieved. In this, plan which has been taken is needed to be executed, execution is the term which helps to building the deliverable to satisfy the customers Monitoring and controlling is the process which will be helpful in order to have calculationofperformanceindicators.Inthis,variationisneedtobetracked systematically. After the above all process, team decided to send the project to customer. It is helpful measure in order to make communication and completion of task appropriately. 4.2 Agreed format and appropriate media to present the outcomes. Enclosed in PPT CONCLUSION Based on the above notions, it can be affirmed that Project implementation is a crucial task in terms to carry out activities effectively. In this, the report has covered activities such as formulationof project, specifications, breakdown structure etc. The main motive of this report was to implement the project specifications in proficient manner which have been achieved. 18
REFERENCES Book & Journals Paulheim, H., 2017. Knowledge graph refinement: A survey of approaches and evaluation methods.Semantic web. 8(3). pp.489-508. Lee, J and et.al., 2018. Addressing health equity through action on the social determinants of health: a global review of policy outcome evaluation methods.International journal of health policy and management. 7(7). p.581. Song, B. and et.al., 2017. Evaluation methods for assessing effectiveness of in situ remediation ofsoilandsedimentcontaminatedwithorganicpollutantsandheavy metals.Environment international. 105. pp.43-55. Masoodi, A. and Qasim, S.N., 2017. Level sequencing of network representation for large scale time constrained projects.IJAR. 3(1). pp.707-709. Bastos, J. and et.al., 2017, September. Identifying bottlenecks in manufacturing systems using stochasticcriticalityanalysis.InSpecificationandDesignLanguages(FDL),2017 Forum on. IEEE. Yeh, E. and Swinehart, N., 2018. A Model for Mobile Social Media Integration in Constructivist ESLClassrooms.InSocialMediainEducation:BreakthroughsinResearchand Practice. IGI Global. Alencar,A.,2018.Refugeeintegrationandsocialmedia:Alocalandexperiential perspective.Information, Communication & Society. 21(11). pp.1588-1603. Letonsaari, M. and Selin, J., 2018, April. Social Media Integration with Nonlinear Educational StorytellingApplication.In201817thInternationalConferenceonInformation Technology Based Higher Education and Training (ITHET). IEEE. Colquhoun, H.L and et.al., 2017. Advancing the literature on designing audit and feedback interventions: identifying theory-informed hypotheses.Implementation Science. 12(1). p.117. Wang, J., Qiao, L. and Qie, Y., 2017, August. Process planning service model design for cloud manufacturing.InAutomationScienceandEngineering(CASE),201713thIEEE Conference on. IEEE. Kerzner, H. and Kerzner, H.R., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. 19
Online PERT ANALYSIS. 2018.[Online]. Available through: <http://acqnotes.com/acqnote/tasks/pert- analysis>. 20