The assignment requires the development of a Work Breakdown Structure (WBS) and scope of work for a project.

13 Pages3123 Words241 Views
   

Added on  2020-03-23

Project Execution and Management Assignment

The assignment requires the development of a Work Breakdown Structure (WBS) and scope of work for a project.

   Added on 2020-03-23

BookmarkShareRelated Documents
PROJECT EXECUTION AND MANAGEMENT
Project Execution and Management Assignment_1
Table of Contents1.Introduction.................................................................................................................................22.Objective of the Project...............................................................................................................23.Total Cost Estimation..................................................................................................................24.Time Duration for the Completion of the Reconstruction........................................................35.Place of performance...................................................................................................................36.Geographical Location for the Reconstruction.........................................................................37.Acceptance Criteria.....................................................................................................................48.Requirements of the Reconstruction..........................................................................................49.Work Breakdown Structure.......................................................................................................510.Milestone Schedule..................................................................................................................611.Quality Assurance Safety Standard.......................................................................................712.Cost Estimation........................................................................................................................813.Procurement Strategy..............................................................................................................814.Conclusion................................................................................................................................8References............................................................................................................................................91
Project Execution and Management Assignment_2
1.IntroductionThe Project execution management is to describe the Request for Proposal and to write acomplete documentation for all the requests for the proposal documents. The Request forProposal is one of the standard tools that is used in the departments of governments and insome companies to buy machines, equipment, products and services by the promotion ofcompetitive proposals among contractors. The name of the company that is being chosen topropose the Request for proposal document is “Singh’s”. The scope of the chosenorganization will be specified. The objective of this assessment is to give explain the WorkBreakdown Structure and the types of the contracts that they offer in their organization forthe Reconstruction of the Harbour bridge. A WBS is an important deliverable in the project inwhich it is used to arrange the activities of the team into different sections of management.The work breakdown structure is explained with an example in this assessment. Theagreement that is made between the company that offers the contract and the group whichtake over the contract is called the contract. The required tenders of the organization and thesubstantial analysis for all the provided tenders are to be specified in this assessment. Amongall the provided tenders, the tender that meets all the requirements of the organization in allcriteria is to be picked. Cost for the total project and the time taken for completing the projectis to be specified. 2.Objective of the ProjectThe objective of the project is to build a harbour bridge. The scope of the project is toconcentrate on the plans that are organized for the projects. Many contractors had applied forthe Reconstruction of Harbour bridge tender. The responsibility of the Singh is to select thebest contractor to build the bridge. To define the project clearly, a checklist has to bedesigned for the scope of the project (W. Larson & F. Gray, 2011).2
Project Execution and Management Assignment_3
3.Total Cost EstimationThe cost estimation for any building can be a rough estimation. The cost can be increasedor decreased in each and every step. The important thing is the cost estimation for anyReconstruction works. The cost estimation includes the amount spent on material, equipmentand the pay that has to be paid to the labours who build the bridge. In addition with theseexpenses, the contractor's cost also included which is an indirect one (Berg, Bank, Oliva &Russell, 2006). Analysis of DataTo develop the cost estimation, it is significant to find the most significant andinfluencing factors of the characteristics of the bridge. The data for the Reconstruction of thebridge has to be collected based on the 4 main variables like Location of the bridge, type ofthe bridge, Annual Average traffic that happens daily in the bridge and the number of lifespans. Therefore by considering the mentioned factors, the total cost required for theReconstruction of the Harbour bridge is 70 million for 1 km long.4.Time Duration for the Completion of the ReconstructionThe days required or time needed to complete the Reconstruction work of the harbourbridge depends upon the distance of the bridge that is going to be constructed and the numberof labours appointed for building the bridge. If the number of labours are more, then theReconstruction can be completed in shortest time period. If the distance is less, then also theReconstruction can be done soon. The number of days required to complete the harbourbridge that is 1km long is 400 week days only. 2018 is not a leap year, so that the number ofdays are only 365 days. The day starts from the date 01-08-2017 and the Reconstruction getscompleted on 26-04-2019. If the weekend is also gets calculated then the end date will be on22-11-2018.5.Place of performancePlace of performance in the project is the relation with the contract. In the individualcontracts, the place of performance is the place where the employee usually carries his work.If the employee of the project does not have any habitat for carrying over his work, theemployer can also sue in the courts for the area where the work is engaged with the employeeor the present place of the work. Here in the Reconstruction work for building the bridge, theplace of performance is the area where the Reconstruction site is situated.3
Project Execution and Management Assignment_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Execution and Management for Harbour Bridge Reconstruction - Singh
|13
|825
|52

Latter of Invitation to Tenders
|17
|4439
|28

Project Management: Harbour Swing Bridge
|15
|4795
|117

Project MANAGEMENT 13 13 Project Case Study-Replacement of Darling Harbour Swing Bridge Name of the University Authors Note
|12
|2032
|347

Replacement of Darling Harbour Swing Bridge
|14
|2851
|37

Completed Darling Harbour Swing Bridge Replacement Assessment No Student Name and ID Email
|13
|532
|350