TASK Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22
Abstract

Introduction

Background of the project

Scope of the project

Aim of the Project

Litrature Review

Parametric Modelling

Four Wheel drive

My design of the shaft

Geometry determination in Nx Siemens

engineering standards

Parametric Modelling in siemens NX

Stresses and deformation

Four by four drive shaft

Design process and drive shaft design

Shaft design material

Shaft design configuration

Modeling and parametirization

Flanges

Intermediate shaft

Intermediate shaft (female)

Cross

Drive shaft assembly

Result and discussion

Design

Part families

Conclusion and recommendations

Logbook

Presentation and poster

OCTOBER
NOVEMBER DECEMBER JANUARY FEBRUARY MARCH
Modeling and parametirization Project 2022_1

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
PARA ELECTRIC MODELING OF A 4X4 DRIVE SHAFT ON SIEMENS NX
|18
|1543
|24

Paraetric Modelling of a 4X4 Drive Shaft on Siemens NX Project 2022
|19
|2641
|28

Logbook Project Report 2022
|4
|1451
|17

Design of a Transmission System with Parametric CAD Implementation
|65
|7385
|268

Complex Project Management
|5
|810
|36

Centrifugal Clutches: Design and Function
|10
|3524
|72