This project focuses on the construction of a swimming pool in a modern society, specifically within Metropolitan Johannesburg, with a planned completion date of December 10, 2019, and a budget of R1.572000.00. The project team consists of seven members, and the author's role is that of a Project Manager, responsible for preparing the project schedule, cost estimation plan, stakeholder management plan, statement of work, and risk management plan. The project's strategic objective is to design and construct a swimming pool to promote coordination, flexibility, stability, and movement through swimming, particularly catering to elder people who cannot engage in high-impact exercises. The project objectives include successfully constructing the swimming pool within the specified timeframe and budget, meeting the requirements of the Metropolitan society, and prioritizing customer satisfaction. Key stakeholders include the project sponsor (Mr. K.D. Williamson), construction engineers, consultants, architects, and contractors. The project faces risks such as the unavailability of skilled labor and funds, potential delays, and a disordered construction site. Currently, the project is in the initiation phase, with completed activities including the development of a business case, feasibility study, project charter creation, team member appointment, and initiation phase review.

Running head: PROJECT MANAGEMENT
Project Management: Construction of the Swimming pool in the Modern Society
Name of the Student:
Name of the University:
Project Management: Construction of the Swimming pool in the Modern Society
Name of the Student:
Name of the University:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1PROJECT MANAGEMENT
Project 1
1. Project name:
(Max. 2 lines)
Construction of the Swimming pool in
the Modern Society
2. Start date Project is commenced to be started on
07-July-2019
3. Closure date (planned or actual):
(Max. 1 line)
Project is commenced to be finished by
10-Dec-2019
4. Maximum size of team at one time
(number of people):
(Max. 2 lines)
The project team is consisted 7 members.
5. Total budget:
(Max. 2 lines)
The total value of the project budget is
R1.572000.00. The total project budget
is approved by project manager.
6. Your job title and role:
(Max. 3 lines)
I worked as a Project manager and my
responsibilities are to prepare the project
schedule, cost estimation plan,
stakeholder management plan, statement
of work, and risk management plan.
7. Your duration on the project as
percentage of the project’s life (e.g. if
you were on the project for two months
out of the project’s life of eight months,
answer “25%”):
(Max. 1 line)
87%
8. Your current access to documentation Adequate
Project 1
1. Project name:
(Max. 2 lines)
Construction of the Swimming pool in
the Modern Society
2. Start date Project is commenced to be started on
07-July-2019
3. Closure date (planned or actual):
(Max. 1 line)
Project is commenced to be finished by
10-Dec-2019
4. Maximum size of team at one time
(number of people):
(Max. 2 lines)
The project team is consisted 7 members.
5. Total budget:
(Max. 2 lines)
The total value of the project budget is
R1.572000.00. The total project budget
is approved by project manager.
6. Your job title and role:
(Max. 3 lines)
I worked as a Project manager and my
responsibilities are to prepare the project
schedule, cost estimation plan,
stakeholder management plan, statement
of work, and risk management plan.
7. Your duration on the project as
percentage of the project’s life (e.g. if
you were on the project for two months
out of the project’s life of eight months,
answer “25%”):
(Max. 1 line)
87%
8. Your current access to documentation Adequate

2PROJECT MANAGEMENT
(none, full, or adequate):
(Max. 2 lines) I have accessed to the project documents
such as project plan, schedule plan,
budget plan.
Discuss the background and high-level details of each project, as well as any specifics relating to
project budget, people involved, organisational impact, project team size, etc.
Note:
You are not required to present a detailed business case, but simply a brief summary or
background of the project so its suitability for this course can be assessed.
9. Your role and stakeholder
type in the project:
(Max. 3 lines)
My role is as a project manager and I am
working as Internal stakeholder.
In the project organization, I am responsible
to plan the resources for meeting with
deadlines. I created concise project plan for
executing and monitoring project progress.
10. A précis of the business case
and business opportunity or
problem or need that inspired
the project. Include the
business level objective (s)
(see example below):
Tip: Make sure you provide
clear details of the context of
the project, including who the
The strategic objective is to design as well as
construct of swimming pool for Metropolitan
society in Johannesburg by end of year 2019.
The aim of this project is to assemble
coordination, flexibility, stability and
movement by swimming. It gives opportunity
to give lesser impact option for elder people
those cannot exercise. The business project is
operated in the construction industry as the
(none, full, or adequate):
(Max. 2 lines) I have accessed to the project documents
such as project plan, schedule plan,
budget plan.
Discuss the background and high-level details of each project, as well as any specifics relating to
project budget, people involved, organisational impact, project team size, etc.
Note:
You are not required to present a detailed business case, but simply a brief summary or
background of the project so its suitability for this course can be assessed.
9. Your role and stakeholder
type in the project:
(Max. 3 lines)
My role is as a project manager and I am
working as Internal stakeholder.
In the project organization, I am responsible
to plan the resources for meeting with
deadlines. I created concise project plan for
executing and monitoring project progress.
10. A précis of the business case
and business opportunity or
problem or need that inspired
the project. Include the
business level objective (s)
(see example below):
Tip: Make sure you provide
clear details of the context of
the project, including who the
The strategic objective is to design as well as
construct of swimming pool for Metropolitan
society in Johannesburg by end of year 2019.
The aim of this project is to assemble
coordination, flexibility, stability and
movement by swimming. It gives opportunity
to give lesser impact option for elder people
those cannot exercise. The business project is
operated in the construction industry as the
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3PROJECT MANAGEMENT
project is for, whether the PM
role is internal to the
organisation or external, who
is funding the project. Outline
what your business is about
(which industry you operate
in and what your focus areas
are).
Example: Business level
objective:
The strategic objective is to
implement a functional
vehicle testing facility at
Senna Motor Group Namibia
by the end of 2017, with the
aim of increasing vehicle
testing related revenue by
R50 million by the end of
2018 as well as achieving
quality improvements
resulting in the reduction of
functional system faults from
50/1000 to 10/1000.
(Max. 20 lines)
project is related to construction of swimming
pool. The focus area of this business is
providing healthy lifestyle to elder people
those are not exercise.
My role is as a project manager and I am
working as Internal stakeholder. Mr. K.D.
Williamson was the project sponsor who
provides required funds for the project.
11. Project level objectives, e.g.
deliverables, budget (cost),
schedule (deadline), quality:
Example. Project level
objective:
The project is based on successfully construct
the swimming pool for Metropolitan society
in Johannesburg within 5 months ended by
10th Dec, 2019 and with a budget of
R1.572000.00. It is to be achieved by
project is for, whether the PM
role is internal to the
organisation or external, who
is funding the project. Outline
what your business is about
(which industry you operate
in and what your focus areas
are).
Example: Business level
objective:
The strategic objective is to
implement a functional
vehicle testing facility at
Senna Motor Group Namibia
by the end of 2017, with the
aim of increasing vehicle
testing related revenue by
R50 million by the end of
2018 as well as achieving
quality improvements
resulting in the reduction of
functional system faults from
50/1000 to 10/1000.
(Max. 20 lines)
project is related to construction of swimming
pool. The focus area of this business is
providing healthy lifestyle to elder people
those are not exercise.
My role is as a project manager and I am
working as Internal stakeholder. Mr. K.D.
Williamson was the project sponsor who
provides required funds for the project.
11. Project level objectives, e.g.
deliverables, budget (cost),
schedule (deadline), quality:
Example. Project level
objective:
The project is based on successfully construct
the swimming pool for Metropolitan society
in Johannesburg within 5 months ended by
10th Dec, 2019 and with a budget of
R1.572000.00. It is to be achieved by
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4PROJECT MANAGEMENT
To successfully implement
Vehicle Functional Testing
for Namibia as an addition to
the current portfolio, by the
31st of December 2017 using
a trial test vehicle from our
primary client within the
project budget of R 1,
200 000.
This will be achieved by:
Installing a Senna group
standard vehicle
assistance system
calibration facility, the
3rd quarter of 2017 within
a budget allocation of
R600 000.
Training 2 engineers at
the primary client (Senna
Motors, Brazil) to gain the
required engineering
knowledge &
competencies to test the
systems, within the 1st
quarter of 2017 and
thereafter training the
remaining engineers
locally by the end of May
2017 within a training
budget of R 500 000.
following project objectives:
Identifying the requirement of people
living in the society with respect to the
swimming pool construction program
Preparing project schedule for
systematic completion of construction
program within the given period and
cost
Constructing the swimming pool with
a purpose of leisure as well as exercise
Providing training to the construction
engineer to gain construction
knowledge to build advanced
swimming pool
System fitting on the terries of the
building
Development of monitoring and
maintenance of construction program
Project must be completed with the
full efforts of 7 project team members
Attaining maximum satisfaction of the
customers by fulfilling their
requirement
High priority should be given to the
project change request
To successfully implement
Vehicle Functional Testing
for Namibia as an addition to
the current portfolio, by the
31st of December 2017 using
a trial test vehicle from our
primary client within the
project budget of R 1,
200 000.
This will be achieved by:
Installing a Senna group
standard vehicle
assistance system
calibration facility, the
3rd quarter of 2017 within
a budget allocation of
R600 000.
Training 2 engineers at
the primary client (Senna
Motors, Brazil) to gain the
required engineering
knowledge &
competencies to test the
systems, within the 1st
quarter of 2017 and
thereafter training the
remaining engineers
locally by the end of May
2017 within a training
budget of R 500 000.
following project objectives:
Identifying the requirement of people
living in the society with respect to the
swimming pool construction program
Preparing project schedule for
systematic completion of construction
program within the given period and
cost
Constructing the swimming pool with
a purpose of leisure as well as exercise
Providing training to the construction
engineer to gain construction
knowledge to build advanced
swimming pool
System fitting on the terries of the
building
Development of monitoring and
maintenance of construction program
Project must be completed with the
full efforts of 7 project team members
Attaining maximum satisfaction of the
customers by fulfilling their
requirement
High priority should be given to the
project change request

5PROJECT MANAGEMENT
Attaining accreditation as a
testing facility from our
primary client at the end of
the 3-month trial test by
means of an inspection
conducted by the external
stakeholder, project sponsor
& project manager and based
on testing acceptance criteria.
(Max. 20 lines)
12. Project size plus project
metrics, e.g. stakeholders,
team size, suppliers,
integration, budget, risks,
issues, organisational scope,
etc.
(You need to describe the
project size by indicating the
stakeholders, the team size,
the number of suppliers
involved, the budget, project
challenges, risks, issues, and
organisational scope):
(Max. 20 lines)
Construction team is comprised of 7
members. Classification of the team members
is given in the table below:
Stakeholder Type of
Stakeholder
Responsibility
Project
Manager
Internal Preparing
schedule, cost
estimation,
risk plan, and
stakeholder
plan
Project
Sponsor
Internal Approving
the project
funds
Reviewing
the project
Attaining accreditation as a
testing facility from our
primary client at the end of
the 3-month trial test by
means of an inspection
conducted by the external
stakeholder, project sponsor
& project manager and based
on testing acceptance criteria.
(Max. 20 lines)
12. Project size plus project
metrics, e.g. stakeholders,
team size, suppliers,
integration, budget, risks,
issues, organisational scope,
etc.
(You need to describe the
project size by indicating the
stakeholders, the team size,
the number of suppliers
involved, the budget, project
challenges, risks, issues, and
organisational scope):
(Max. 20 lines)
Construction team is comprised of 7
members. Classification of the team members
is given in the table below:
Stakeholder Type of
Stakeholder
Responsibility
Project
Manager
Internal Preparing
schedule, cost
estimation,
risk plan, and
stakeholder
plan
Project
Sponsor
Internal Approving
the project
funds
Reviewing
the project
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6PROJECT MANAGEMENT
plan
Project
Owner
Internal Proposing
requirement
specification
plan
Construction
engineer
Internal Preparing
engineering
drawings
Consultant External Improving the
performance
of
construction
work based
on operations
and
profitability
Architect Internal Construction
design of
swimming
pool
Contractor External Managing
supply of
resources and
required
construction
equipments
The approved budget for the project is
plan
Project
Owner
Internal Proposing
requirement
specification
plan
Construction
engineer
Internal Preparing
engineering
drawings
Consultant External Improving the
performance
of
construction
work based
on operations
and
profitability
Architect Internal Construction
design of
swimming
pool
Contractor External Managing
supply of
resources and
required
construction
equipments
The approved budget for the project is
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT MANAGEMENT
R1.572000.00
Risks associated with the project are:
Unavailability of skilled labour having
construction knowledge
Unavailability of funds required to
complete the project
Delay of the project plan due to
improper project planning
Disordered environment at
construction site
Scope of the project is to construct the
swimming pool on the terries of the
metropolitan society within the approved
budget and time allocated.
13. Current status of the project,
e.g., “not yet started”,
“concept/idea phase”,
“initiation phase”,
“design/development phase”,
“implementation/execution
phase”, “close phase”,
“completed”.
(Max. 4 lines)
Initiation phase of the project is completed.
In the initiation phase, we completed
following project activities:
Development of business case
Undertaking feasibility study
Create the project charter
Appointment of team member
Performing the initiation phase review
R1.572000.00
Risks associated with the project are:
Unavailability of skilled labour having
construction knowledge
Unavailability of funds required to
complete the project
Delay of the project plan due to
improper project planning
Disordered environment at
construction site
Scope of the project is to construct the
swimming pool on the terries of the
metropolitan society within the approved
budget and time allocated.
13. Current status of the project,
e.g., “not yet started”,
“concept/idea phase”,
“initiation phase”,
“design/development phase”,
“implementation/execution
phase”, “close phase”,
“completed”.
(Max. 4 lines)
Initiation phase of the project is completed.
In the initiation phase, we completed
following project activities:
Development of business case
Undertaking feasibility study
Create the project charter
Appointment of team member
Performing the initiation phase review

8PROJECT MANAGEMENT
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

9PROJECT MANAGEMENT
Bibliography
Kharaiweish, M. (2013). Project Monitoring and control measures. International Journal of
computer science and information technology, 5(5). Retrieved from:
http://airccse.org/journal/jcsit/5513ijcsit03.pdf
Mansfield Community. (2013). Introduction to project management. 1st ed. Retrieved from
http://www.mansfield.vic.gov.au/Libraries/Community_Development/Intro_to_Project_
Management_Manual.sflb.ashx
Monnappa. (2017). Project scope management: What it is and why it is important. 1st ed.
Retrieved from https://www.simplilearn.com/project-scope-management-importance-
rar89-article
Passenheim, O. (2015). Project Management. 1st ed. Retrieved from
http://home.hit.no/~hansha/documents/theses/projectmanagement.pdf
Wilson, D. (2012). Project Governance. Retrieved from
http://www.masterresearch.com.au/downloads/pdfs/Project_Governance_V2.pdf
Bibliography
Kharaiweish, M. (2013). Project Monitoring and control measures. International Journal of
computer science and information technology, 5(5). Retrieved from:
http://airccse.org/journal/jcsit/5513ijcsit03.pdf
Mansfield Community. (2013). Introduction to project management. 1st ed. Retrieved from
http://www.mansfield.vic.gov.au/Libraries/Community_Development/Intro_to_Project_
Management_Manual.sflb.ashx
Monnappa. (2017). Project scope management: What it is and why it is important. 1st ed.
Retrieved from https://www.simplilearn.com/project-scope-management-importance-
rar89-article
Passenheim, O. (2015). Project Management. 1st ed. Retrieved from
http://home.hit.no/~hansha/documents/theses/projectmanagement.pdf
Wilson, D. (2012). Project Governance. Retrieved from
http://www.masterresearch.com.au/downloads/pdfs/Project_Governance_V2.pdf
1 out of 10
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2026 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.