Running head: PROJECT MANAGEMENT
Project Management: Construction of the Swimming pool in the Modern Society
Name of the Student:
Name of the University:
Construction of the Swimming pool in the Modern Society_1

1PROJECT MANAGEMENT
Project 1
1. Project name:
(Max. 2 lines)
Construction of the Swimming pool in
the Modern Society
2. Start date Project is commenced to be started on
07-July-2019
3. Closure date (planned or actual):
(Max. 1 line)
Project is commenced to be finished by
10-Dec-2019
4. Maximum size of team at one time
(number of people):
(Max. 2 lines)
The project team is consisted 7 members.
5. Total budget:
(Max. 2 lines)
The total value of the project budget is
R1.572000.00. The total project budget
is approved by project manager.
6. Your job title and role:
(Max. 3 lines)
I worked as a Project manager and my
responsibilities are to prepare the project
schedule, cost estimation plan,
stakeholder management plan, statement
of work, and risk management plan.
7. Your duration on the project as
percentage of the project’s life (e.g. if
you were on the project for two months
out of the project’s life of eight months,
answer “25%”):
(Max. 1 line)
87%
8. Your current access to documentation Adequate
Construction of the Swimming pool in the Modern Society_2

2PROJECT MANAGEMENT
(none, full, or adequate):
(Max. 2 lines) I have accessed to the project documents
such as project plan, schedule plan,
budget plan.
Discuss the background and high-level details of each project, as well as any specifics relating to
project budget, people involved, organisational impact, project team size, etc.
Note:
You are not required to present a detailed business case, but simply a brief summary or
background of the project so its suitability for this course can be assessed.
9. Your role and stakeholder
type in the project:
(Max. 3 lines)
My role is as a project manager and I am
working as Internal stakeholder.
In the project organization, I am responsible
to plan the resources for meeting with
deadlines. I created concise project plan for
executing and monitoring project progress.
10. A précis of the business case
and business opportunity or
problem or need that inspired
the project. Include the
business level objective (s)
(see example below):
Tip: Make sure you provide
clear details of the context of
the project, including who the
The strategic objective is to design as well as
construct of swimming pool for Metropolitan
society in Johannesburg by end of year 2019.
The aim of this project is to assemble
coordination, flexibility, stability and
movement by swimming. It gives opportunity
to give lesser impact option for elder people
those cannot exercise. The business project is
operated in the construction industry as the
Construction of the Swimming pool in the Modern Society_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Response to Selection Criteria for Project Cadet Position
|15
|5238
|384

Business Communication Assignment- Pine Parks Care Home
|9
|2125
|42

Modifications in Showground Station
|42
|6626
|2

Project Management for Crossrail London
|16
|2293
|223

Research Reflection Report
|5
|1712
|1

Application for a Construction Project manager position
|4
|626
|16