Running head: PROJECT MANAGEMENT Case Study-Food factory Name of the Student Name of the University Author’s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
2 PROJECT MANAGEMENT Task 1: 1.1 Project charter The paper mainly reflects on the organization “Food factory” that is one of the popular television show that helps in describing how different products are generally made. It is found that Glazed donuts are one of the most popular sweet treats around and the entire procedure of making it is reflected in the TV show of Food factory. However, it is analyzed that the donuts that are popular among the world does not have hole in the middle and after the implementation of ring donut it is found that the donuts are not always cooked properly and this is the reason, complainants against donuts are received. In order to improve the quality of the food, it is found that DMAIC methodology will generally be used (Food Factory, 2019). Thus the main purpose of the project is to improve the food named “donuts” with the help of DMAIC methodology. It is assumed that the project will be successfully executed within the time of 1 month. It is assumed that the entire project will be completed within the expected time and budget by following the scope of the project so that the objectives of the project can be achieved successfully. The team members who are involved within the project are generally elaborated below: Project manager Project planner Financial manager HR manager Quality analyst Cook Workers
3 PROJECT MANAGEMENT 1.2 Project CTQ The objectives or goals that are generally achieved with the help of the process improvement plan are generally elaborated below: Improving customer satisfaction:It is found that improvement in the process of creating donuts will be helpful in satisfying the customers as they does need to eat uncooked food items. With the improvement in quality, the customers generally get attracted towards the food item (Badewi, 2016). Reducing waste:If the food items was uncooked then the chances of food wastage is quite high and in order to reduce wastage of food, it is necessary to improve the procedure of cooking donuts. Decreasing time cycle:If donuts get cooked properly then the individuals who are associated with the procedure o making donuts does not need to waste their time on its preparation (Hornstein, 2015). 1.3 Toll gate By using the DMAIC methodology, improvement procedure is started in order to improve the cooking off donuts however, it is found that if the alternative method that is analyzed to become successful for the project is not appropriate then it is analyzed that the improvement procedure get terminated (Kassardjian et al., 2015).In addition to this, it is found that budget can be another reason due to which the process improvement plan that is generally undertaken can get terminated in the middle of the procedure but the chances are quite low.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4 PROJECT MANAGEMENT 1.4 Map “As Is” process SIPOC diagram SuppliersInputsProcessOutputCustomer Material needed formaking donuts Gas supply Utensils Gloves Water supply Proper preparationof donutswith new procedure Ownerof food item Process Map Figure 1: Process Map (Source: Created by Author) Testing for issue Adopting new procedure Donuts are prepared with new technique Complete preparation Testing Objectives achieved
5 PROJECT MANAGEMENT 1.5 Measure The steps that are reflected in the table generally focuses on the step that is utilized in process map in order to properly analyze, review as well as evaluate the entire procedure. StepStep DescriptionHow to Measure 1.Checking quality before delivering to the customer Average time is spent on checking 2.Identified that donuts are not cooked Sending the food to the preparation zone 3.If the donuts are cookedAverage time in analysis 4.Delivered to the customerAverage time taken inn delivering the order 1.6 Analyze The process were problem may occur are generally listed as well as elaborated in the table that is given below: Step of the Process Where Inefficiencies Might Occur Brief Description of the Nature/Type of Inefficiencies 1Identifying the quality of foodIf the food quality are not checked then it might occurthatuncookeddonutsaredeliveredto the customers which detoriate brand quality of the food. 2Donuts that are rejected as they are uncooked The donuts that are rejected that are uncooked can be wasted asnone of the further procedurecan be helpful(Hakimi, Zahraee & Mohd Rohani, 2018). 3Further procedure on uncooked food If the donuts that are uncooked undergoes through further process then the quality of the food gets detoriate.
6 PROJECT MANAGEMENT 4Food delivered to the customerIf the food that are delivered to thee customers are not of good quality then quality related issue occur. 5Decision making of the managerIf the manager cannot be able to decide then under quality food may be delivered to the customers. 1.7 Improve ProcessAlternatives of improvement 1.Donuts that are rejected as they are uncooked 1. Analyzing proper ways to cook them 2. Testing whether the quality standards of the food are met or not 3.Thenthefoodwillbedeliveredtothe customers. 1.8 Control It is found that in order to implement the change within the project it is quite necessary to undertake the following procedures that are generally listed below: Training:It is quite necessary to provide training to the cooks so that they can be able to know the other alternatives procedures that are helpful in cooking and will be helpful inn resolving the problems in a very much less time (Lu et al., 2016).In addition to this, it is found that training would also helpful in maintaining the quality of food. Policy documents:It is quite necessary to create proper policy documents that generally focuses on proper standards of quality so that the delivered food must be proper quality in order to avoid quality related issues and challenges. Monitoring procedure:It is found that regular inspection of food will be helpful in maintaining proper quality of food ad will be further helpful in resolving issues and challenges that are mainly associated with quality of the food (Hornstein, 2015).In addition to this, regular
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7 PROJECT MANAGEMENT monitoring also helps in mitigating short term risks as well as challenge and thus considered to be one of the important control procedure.
8 PROJECT MANAGEMENT Bibliography Badewi, A. (2016). The impact of project management (PM) and benefits management (BM) practicesonprojectsuccess:Towardsdevelopingaprojectbenefitsgovernance framework.International Journal of Project Management,34(4), 761-778. Ding, K., Jiang, P., Sun, P., & Wang, C. (2017). RFID-enabled physical object tracking in process flow based on an enhanced graphical deduction modeling method.IEEE Transactions on Systems, Man, and Cybernetics: Systems,47(11), 3006-3018. FoodFactory:Season2,Episode2-Salty&Sweet.(2019).Retrievedfrom https://www.youtube.com/watch?v=xItrZTHTrJQ Hakimi, S., Zahraee, S. M., & Mohd Rohani, J. (2018). Application of Six Sigma DMAIC methodologyinplainyogurtproductionprocess.InternationalJournalofLeanSix Sigma,9(4), 562-578. Hornstein, H. A. (2015). The integration of project management and organizational change management is now a necessity.International Journal of Project Management,33(2), 291- 298. Kassardjian, C. D., Williamson, M. L., Van Buskirk, D. J., Ernste, F. C., & Hunderfund, A. N. L. (2015). Residency training: quality improvement projects in neurology residency and fellowship: applying DMAIC methodology.Neurology,85(2), e7-e10. Lu, R., Chao, C. C., & Cheng, Y. (2017, September). To improve the measure fail rate on SEM through six sigma DMAIC methodology—Chien-Hui Lu. In2017 Joint International Symposium on e-Manufacturing and Design Collaboration (eMDC) & Semiconductor Manufacturing (ISSM)(pp. 1-4). IEEE.
9 PROJECT MANAGEMENT Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015). Projectsuccessanalysisframework:Aknowledge-basedapproachinproject management.International Journal of Project Management,33(4), 772-783. Zhang, Z. H., & Awasthi, A. (2016). A DMAIC-based methodology for improving urban traffic quality with application for city of Montreal.International Journal of Six Sigma and Competitive Advantage,10(1), 24-49.