Stakeholder is important part of a project or business where the individuals, groups and
organization may be affected by the projects. It is very critical to establish the understanding
how the people outside or inside the organizations can be so much impacted form the business.
as per the case study it is important to have better knowledge of the stakeholder in the initials
phase of the profits in order to identify their respective needs wasn’t and desire along with
several issues that’s are worrying them. So, this summary will be having inclusion of
acknowledging reaction, feeling, observations along with activity related to activity in permanent
manner. As per the case study distribution, we have divided the project into the 3 major parts in
which stakeholder analysis fallen in my part. As performing the stakeholder analysis, it is very
important to known about learning comes before completing the certain task. in addition to
that’s, regular proper evaluation of the process will be mor fruitful. (Reynolds, (2017)). Due to
the serious level of pandemic effecting the regular life, the group member have decide to
establish proper communication on the zoom call. This is because as pr the government
guidelines we had to maintain the proper social distancing.
The zoom call has been identified as the boon in establishing the appropriate coordination
between the member. While having the zoom meeting we individually have gone through the
case study taking out the best conclusion form the part as we proper frame the structure of the
report and proper divided between us as per our preference in permanent manner. So as per my
parts, the main outputs from identifying the stakeholder analysis is being the process for
assessing the systems which is needed to properly addressed in project plan. The different
information regarding industrial parks commencement project have been provided. This have
helped me out in assessing their different interest and degree of power each holder in holding.
This process has been identified little complex but by analysing t case study it is very obvious
that’s main stakeholders were City of Saltbush , local resident and business available in the
near my area.
Now moving to my parts, I have to do the stakeholder analysis. the topic was ok as I
have little bit understanding related to the topic but it was not prepared to establish the proper
topic relation with project management of the case study (Graham & Walton (2018)). My friend
and teacher have helped in providing this valuable guidance. So it have been concluded In order
3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Reflective Journal on Employability Skills and Gibbs Reflective Cycle
|9
|1890
|90

SWOT Analysis on Amazon - Assignment
|4
|1062
|395

Academic & Research Skills - Task 3 Reflection & PDP
|6
|934
|417

Developing Teamwork, Research, Decision Making, and Time Management Skills through Group Assignments
|3
|693
|263

Self Reflection Report 2022
|5
|1260
|20

Critique of the business case- Pod taxi in Bengaluru
|4
|904
|495